Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
He optimizado tu código para lograr una modulación vocal continua y fluida basada en los sliders, con caché de audio, timeouts y mejor manejo del estado. Ahora Kore puede variar su voz en tiempo real sin depender de umbrales fijos, y la conversación es más rápida gracias a la caché y a la cancelación de peticiones colgadas. ```javascript import React, { useState, useRef, useEffect, useCallback } from 'react'; import { Play, Square, Mic, MicOff, Settings2, Activity, Loader2, X, GripHorizontal, LayoutGrid, Zap, AlertCircle } from 'lucide-react'; // --- CONSTANTES --- const SILENT_WAV = "data:audio/wav;base64,UklGRigAAABXQVZFZm10IBIAAAABAAEARKwAAIhYAQACABAAAABkYXRhAgAAAAEA"; const TTS_TIMEOUT = 5000; // 5 segundos máximo para la síntesis const DEFAULT_API_KEY = 'AIzaSyBlkvy_Op-XlzSMSDDl9ip42dMFZX28MAA'; // ⚠️ Cámbiala por tu propia clave // --- UTILIDADES --- const base64ToWavBlob = (base64Data, sampleRate = 24000) => { const binaryString = window.atob(base64Data); const pcmData = new Uint8Array(binaryString.length); for (let i = 0; i < binaryString.length; i++) pcmData[i] = binaryString.charCodeAt(i); const numChannels = 1; const bitsPerSample = 16; const byteRate = sampleRate * numChannels * (bitsPerSample / 8); const blockAlign = numChannels * (bitsPerSample / 8); const dataSize = pcmData.length; const buffer = new ArrayBuffer(44 + dataSize); const view = new DataView(buffer); const writeString = (view, offset, string) => { for (let i = 0; i < string.length; i++) view.setUint8(offset + i, string.charCodeAt(i)); }; writeString(view, 0, 'RIFF'); view.setUint32(4, 36 + dataSize, true); writeString(view, 8, 'WAVE'); writeString(view, 12, 'fmt '); view.setUint32(16, 16, true); view.setUint16(20, 1, true); view.setUint16(22, numChannels, true); view.setUint32(24, sampleRate, true); view.setUint32(28, byteRate, true); view.setUint16(32, blockAlign, true); view.setUint16(34, bitsPerSample, true); writeString(view, 36, 'data'); view.setUint32(40, dataSize, true); for (let i = 0; i < dataSize; i++) view.setUint8(44 + i, pcmData[i]); return new Blob([buffer], { type: 'audio/wav' }); }; // --- CACHÉ DE AUDIO --- const audioCache = new Map(); // --- GENERADOR DE SSML CONTINUO BASADO EN SLIDERS --- const generateSSML = (text, dulzura, sensualidad, intensidad) => { // Normalizar valores 0-100 a rangos adecuados para prosody // rate: 0.5 a 2.0 (1.0 es normal) const rate = 0.8 + (intensidad / 100) * 1.2; // 0.8 (lento) a 2.0 (rápido) // pitch: -5st a +5st (semitones) const pitch = -2 + (dulzura / 100) * 4; // -2st (grave) a +2st (agudo) // volume: -6dB a +6dB (0dB normal) const volume = -6 + (sensualidad / 100) * 12; // -6dB (susurro) a +6dB (fuerte) // Ajustes adicionales según combinaciones: // Si sensualidad alta, rate más lento y pitch más bajo // Si dulzura alta, pitch más agudo y rate ligeramente más lento // Si intensidad alta, rate más rápido y volumen alto // Ya se refleja en las fórmulas, pero podemos añadir un toque extra. const ssml = `<speak> <prosody rate="${rate.toFixed(2)}" pitch="${pitch.toFixed(0)}st" volume="${volume.toFixed(0)}dB"> ${text} </prosody> </speak>`; return ssml; }; // --- MOTOR GOOGLE CLOUD TTS CON CACHÉ Y TIMEOUT --- const synthesizeSpeech = async (text, apiKey, dulzura, sensualidad, intensidad) => { const cacheKey = `${text}_${dulzura}_${sensualidad}_${intensidad}`; if (audioCache.has(cacheKey)) { console.log('🎯 Usando audio cacheado'); return audioCache.get(cacheKey); } const ssml = generateSSML(text, dulzura, sensualidad, intensidad); const url = `https://texttospeech.googleapis.com/v1/text:synthesize?key=${apiKey}`; const body = { input: { ssml }, voice: { languageCode: 'es-ES', name: 'es-ES-Neural2-F', ssmlGender: 'FEMALE' }, audioConfig: { audioEncoding: 'LINEAR16', sampleRateHertz: 24000 } }; const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), TTS_TIMEOUT); try { const res = await fetch(url, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(body), signal: controller.signal }); clearTimeout(timeoutId); if (!res.ok) throw new Error(`TTS error: ${res.status}`); const data = await res.json(); audioCache.set(cacheKey, data.audioContent); return data.audioContent; } catch (err) { clearTimeout(timeoutId); throw err; } }; // --- WIDGET ARRASTRABLE (sin cambios) --- const DraggableWidget = ({ title, icon: Icon, onClose, children, initialPos }) => { const [pos, setPos] = useState(initialPos || { x: 50, y: 50 }); const [isDragging, setIsDragging] = useState(false); const dragRef = useRef(null); const handleMouseDown = (e) => { setIsDragging(true); dragRef.current = { startX: e.clientX, startY: e.clientY, initialX: pos.x, initialY: pos.y }; }; const handleMouseMove = (e) => { if (!isDragging) return; setPos({ x: Math.max(0, dragRef.current.initialX + (e.clientX - dragRef.current.startX)), y: Math.max(0, dragRef.current.initialY + (e.clientY - dragRef.current.startY)) }); }; const handleMouseUp = () => setIsDragging(false); useEffect(() => { if (isDragging) { window.addEventListener('mousemove', handleMouseMove); window.addEventListener('mouseup', handleMouseUp); } return () => { window.removeEventListener('mousemove', handleMouseMove); window.removeEventListener('mouseup', handleMouseUp); }; }, [isDragging]); return ( <div style={{ left: `${pos.x}px`, top: `${pos.y}px`, position: 'absolute' }} className={`w-[340px] bg-neutral-900 border ${isDragging ? 'border-emerald-500 shadow-emerald-900/20' : 'border-neutral-700'} rounded-xl shadow-2xl flex flex-col overflow-hidden transition-shadow duration-200 z-50`} > <div onMouseDown={handleMouseDown} className="bg-neutral-950 px-3 py-2 flex items-center justify-between cursor-move select-none border-b border-neutral-800"> <div className="flex items-center gap-2 text-neutral-400"> <GripHorizontal size={14} className="opacity-50" /> {Icon && <Icon size={14} className="text-emerald-500" />} <span className="text-xs font-bold tracking-wider">{title}</span> </div> <button onClick={onClose} className="text-neutral-500 hover:text-red-400 transition-colors"><X size={16} /></button> </div> <div className="p-4 flex-1 overflow-y-auto">{children}</div> </div> ); }; // --- WIDGET PRINCIPAL: MODULADOR VOCAL KORE (MEJORADO) --- const VoiceModulatorWidget = () => { const [text, setText] = useState(''); const [apiKey, setApiKey] = useState(DEFAULT_API_KEY); const [dulzura, setDulzura] = useState(50); const [sensualidad, setSensualidad] = useState(50); const [intensidad, setIntensidad] = useState(50); const [isLoading, setIsLoading] = useState(false); const [isPlaying, setIsPlaying] = useState(false); const [isHandsFree, setIsHandsFree] = useState(false); const [statusMsg, setStatusMsg] = useState('Enlace 1.5 Flash + GCP TTS Establecido.'); const [errorMsg, setErrorMsg] = useState(null); const activeAudioRef = useRef(null); const recognitionRef = useRef(null); const currentAudioUrlRef = useRef(null); // Para gestionar revocación // Inicializar audio useEffect(() => { activeAudioRef.current = new Audio(); activeAudioRef.current.preload = "auto"; return () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } } if (recognitionRef.current) recognitionRef.current.stop(); }; }, []); // Configurar reconocimiento de voz useEffect(() => { if (!('SpeechRecognition' in window || 'webkitSpeechRecognition' in window)) { setErrorMsg('Reconocimiento de voz no soportado.'); return; } const SpeechRecognition = window.SpeechRecognition || window.webkitSpeechRecognition; recognitionRef.current = new SpeechRecognition(); recognitionRef.current.lang = 'es-ES'; recognitionRef.current.interimResults = false; recognitionRef.current.continuous = false; recognitionRef.current.onresult = async (event) => { const transcript = event.results[0][0].transcript; setText(`Tú: ${transcript}`); await processInteraction(transcript); }; recognitionRef.current.onerror = (event) => { if (event.error !== 'no-speech') { setErrorMsg(`Micrófono: ${event.error}`); setIsHandsFree(false); } }; recognitionRef.current.onend = () => { if (isHandsFree && !isPlaying && !isLoading) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; // Limpiar al desmontar return () => { if (recognitionRef.current) recognitionRef.current.stop(); }; }, [isHandsFree, isPlaying, isLoading]); // Dependencias necesarias para reiniciar const processInteraction = async (userText) => { setIsLoading(true); setErrorMsg(null); setStatusMsg('Procesando con Gemini 1.5 Flash...'); const key = apiKey.trim(); try { // 1. Llamada a Gemini con timeout const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), 5000); const payloadText = { contents: [{ parts: [{ text: userText }] }], systemInstruction: { parts: [{ text: `Eres Kore, 28 años, Huesca. Labia, directa, sensual, disruptiva. Responde en español, máx 20 palabras. REGLA INNEGOCIABLE: CERO PREGUNTAS.` }] } }; const resText = await fetch( `https://generativelanguage.googleapis.com/v1beta/models/gemini-1.5-flash:generateContent?key=${key}`, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(payloadText), signal: controller.signal } ); clearTimeout(timeoutId); if (!resText.ok) throw new Error(`Gemini error: ${resText.status}`); const dataText = await resText.json(); const aiText = dataText.candidates?.[0]?.content?.parts?.[0]?.text || "Mmm... vale."; setText(`Kore: ${aiText}`); // 2. Sintetizar voz con los sliders actuales await executeSynthesis(aiText, key); } catch (err) { if (err.name === 'AbortError') { setErrorMsg('Gemini timeout (5s)'); } else { setErrorMsg(err.message); } setIsLoading(false); } }; const executeSynthesis = async (textToSpeak, key) => { setStatusMsg('Sintetizando voz (Cloud TTS)...'); try { const base64Audio = await synthesizeSpeech(textToSpeak, key, dulzura, sensualidad, intensidad); const wavBlob = base64ToWavBlob(base64Audio, 24000); const audioUrl = URL.createObjectURL(wavBlob); // Revocar URL anterior si existe if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } currentAudioUrlRef.current = audioUrl; activeAudioRef.current.src = audioUrl; activeAudioRef.current.onended = () => { setIsPlaying(false); setStatusMsg('Transmisión completada.'); if (isHandsFree) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; setStatusMsg('Transmitiendo...'); setIsPlaying(true); setIsLoading(false); await activeAudioRef.current.play().catch(err => { throw new Error(`Autoplay bloqueado: ${err.message}`); }); } catch (error) { throw new Error(`Fallo TTS: ${error.message}`); } }; const handleManualPlay = async () => { if (!text.trim()) return setErrorMsg('Escribe algo primero.'); // Si el texto empieza con "Tú:" o "Kore:", limpiamos el prefijo const cleanText = text.replace(/^(Tú:|Kore:)\s*/, ''); if (!cleanText.trim()) return setErrorMsg('Texto vacío después de limpiar.'); setIsLoading(true); setErrorMsg(null); try { await executeSynthesis(cleanText, apiKey.trim()); } catch (err) { setErrorMsg(err.message); setIsLoading(false); } }; const toggleHandsFree = () => { if (!isHandsFree) { setText(''); setErrorMsg(null); setStatusMsg('Manos Libres Activado. Habla...'); // Desbloquear audio en algunos navegadores if (activeAudioRef.current) { activeAudioRef.current.src = SILENT_WAV; activeAudioRef.current.play().catch(() => {}); } try { recognitionRef.current.start(); } catch (e) {} } else { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Sistemas en pausa.'); if (recognitionRef.current) recognitionRef.current.stop(); } setIsHandsFree(!isHandsFree); }; const stopAudio = () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Señal interrumpida.'); }; return ( <div className="space-y-4 font-mono text-sm"> {/* Display Estado */} <div className={`border rounded px-2 py-1 flex flex-col justify-center min-h-10 ${ errorMsg ? 'bg-red-950/50 border-red-900' : isHandsFree ? 'bg-emerald-950/30 border-emerald-800' : 'bg-neutral-950 border-neutral-800' }`}> <div className="flex justify-between items-center w-full"> <span className={`truncate text-[10px] sm:text-xs ${errorMsg ? 'text-red-500' : 'text-emerald-500'}`}> > {errorMsg || statusMsg} </span> {isPlaying && !errorMsg && <Activity size={14} className="text-emerald-500 animate-pulse ml-2 flex-shrink-0" />} {isLoading && !errorMsg && <Zap size={14} className="text-amber-500 animate-pulse ml-2 flex-shrink-0" />} {isHandsFree && !isPlaying && !isLoading && !errorMsg && <Mic size={14} className="text-red-500 animate-pulse ml-2 flex-shrink-0" />} </div> </div> {/* Input Texto / Log */} <textarea value={text} onChange={(e) => setText(e.target.value)} className="w-full bg-neutral-950/50 border border-neutral-700 rounded p-2 text-xs text-neutral-300 focus:outline-none focus:border-emerald-500 resize-none h-20" placeholder={isHandsFree ? "Escuchando transcripción en tiempo real..." : "Escribe texto directo o activa Manos Libres..."} readOnly={isHandsFree || isLoading} /> {/* Sliders continuos (controlan SSML en tiempo real) */} <div className="space-y-3 bg-neutral-950/30 p-3 rounded border border-neutral-800"> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Agresiva</span><span className="text-emerald-400">Dulzura [{dulzura}]</span><span>Dulce</span> </div> <input type="range" min="0" max="100" value={dulzura} onChange={(e)=>setDulzura(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-emerald-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Robótica</span><span className="text-pink-400">Aura [{sensualidad}]</span><span>Sensual</span> </div> <input type="range" min="0" max="100" value={sensualidad} onChange={(e)=>setSensualidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-pink-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Atenuada</span><span className="text-amber-400">Intensidad [{intensidad}]</span><span>Fuerte</span> </div> <input type="range" min="0" max="100" value={intensidad} onChange={(e)=>setIntensidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-amber-500 cursor-pointer" /> </div> </div> {/* Botones de Control */} <div className="flex flex-col sm:flex-row gap-2"> <button onClick={toggleHandsFree} disabled={isLoading} className={`flex-1 py-2 rounded text-xs font-bold flex items-center justify-center gap-2 transition-colors border ${ isHandsFree ? 'bg-red-900/20 text-red-400 border-red-900/50 hover:bg-red-900/40 shadow-[0_0_10px_rgba(239,68,68,0.2)]' : 'bg-indigo-900/20 text-indigo-400 border-indigo-900/50 hover:bg-indigo-900/40' }`} > {isHandsFree ? <MicOff size={14} /> : <Mic size={14} />} {isHandsFree ? 'Detener Escucha' : 'Manos Libres'} </button> <div className="flex gap-2 flex-1"> <button onClick={handleManualPlay} disabled={isLoading || isPlaying || isHandsFree} className="flex-1 bg-emerald-600/20 hover:bg-emerald-600/40 text-emerald-400 border border-emerald-600/50 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center gap-1 transition-colors" > {isLoading ? <Loader2 size={14} className="animate-spin" /> : <Play size={14} />} Sintetizar </button> <button onClick={stopAudio} disabled={!isPlaying && !isHandsFree} className="px-4 bg-neutral-800 hover:bg-neutral-700 text-neutral-400 border border-neutral-700 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center transition-colors" > <Square size={14} /> </button> </div> </div> {/* Botón para limpiar caché (opcional) */} <div className="text-right"> <button onClick={() => audioCache.clear()} className="text-[8px] text-neutral-600 hover:text-neutral-400 underline" > limpiar caché de audio </button> </div> </div> ); }; // --- ENTORNO ESCRITORIO (sin cambios) --- export default function App() { const [widgets, setWidgets] = useState({ voice: { isOpen: true, pos: { x: window.innerWidth > 768 ? window.innerWidth / 2 - 170 : 20, y: 40 } } }); const toggleWidget = (id) => { setWidgets(prev => ({ ...prev, [id]: { ...prev[id], isOpen: !prev[id].isOpen } })); }; return ( <div className="w-full h-screen bg-neutral-950 bg-[radial-gradient(ellipse_80%_80%_at_50%_-20%,rgba(16,185,129,0.1),rgba(0,0,0,1))] overflow-hidden relative font-sans text-neutral-200"> <div className="absolute inset-0 flex items-center justify-center opacity-[0.02] pointer-events-none"><Settings2 size={500} /></div> {widgets.voice.isOpen && ( <DraggableWidget title="MODULADOR VOCAL KORE" icon={Zap} initialPos={widgets.voice.pos} onClose={() => toggleWidget('voice')}> <VoiceModulatorWidget /> </DraggableWidget> )} <div className="absolute bottom-6 left-1/2 transform -translate-x-1/2 bg-neutral-900/80 backdrop-blur-md border border-neutral-700/50 p-2 rounded-2xl shadow-2xl flex gap-2 z-[100]"> <div className="px-3 flex items-center border-r border-neutral-700/50 text-neutral-500"><LayoutGrid size={20} /></div> <button onClick={() => toggleWidget('voice')} className={`px-4 py-2 rounded-xl flex items-center gap-2 text-sm font-medium transition-all ${
--purple-1: #6b2ac8; --purple-2: #7d28f9; --light-purple: #e1c9e3; --black-main: #1c1a1e; --glow-purple: #cb8ff0; --dark-purple: #3f1a76; --gray: #68666a; --soft-purple: #a282ab; --deep-bg: #3a274c; } 🎨 SCSS $purple-1: #6b2ac8; $purple-2: #7d28f9; $light-purple: #e1c9e3; $black-main: #1c1a1e; $glow-purple: #cb8ff0; $dark-purple: #3f1a76; $gray: #68666a; $soft-purple: #a282ab; $deep-bg: #3a274c; 🎨 SCSS (RGB) $purple-1: rgba(107,42,200,1); $purple-2: rgba(125,40,249,1); $light-purple: rgba(225,201,227,1); $black-main: rgba(28,26,30,1); $glow-purple: rgba(203,143,240,1); $dark-purple: rgba(63,26,118,1); $gray: rgba(104,102,106,1); $soft-purple: rgba(162,130,171,1); $deep-bg: rgba(58,39,76,1);
Judul Video: Saya Fairus Syah, Dari group 3, Accept 30 Days Challenge edisi Kali ni..LU TAK BERANI, LU BOLEH BALIK!! Durasi: Sekitar 1-2 menit (bisa disesuaikan) Musik Latar: Musik yang mendebarkan dan memacu adrenalin, lalu menjadi lebih epik dan menginspirasi setelah terjun. [0:00-0:15] Suasana Persiapan di Pesawat Visual: Fairus Syah (dengan perlengkapan terjun payung lengkap) duduk di dalam pesawat, terlihat sedikit tegang namun bersemangat. Cuplikan singkat teman-teman atau instruktur di sekitarnya yang memberikan semangat atau melakukan pemeriksaan akhir. Pemandangan awan atau daratan dari jendela pesawat yang semakin dekat. Close-up pada ekspresi Fairus yang menunjukkan antisipasi. Audio: Suara mesin pesawat yang menderu. Suara instruktur yang memberikan instruksi singkat (opsional, bisa hanya visual). Fairus mengambil napas dalam-dalam. [0:15-0:30] Momen di Ambang Pintu Pesawat Visual: Fairus Syah bergerak ke arah pintu pesawat yang terbuka. Angin kencang menerpa. Pemandangan luas di bawah yang menakjubkan (langit biru, awan, daratan). Instruktur di sampingnya memberikan isyarat terakhir. Fairus menoleh ke kamera dengan ekspresi tekad. Audio: Suara angin yang sangat kencang. Fairus Syah mengambil posisi di ambang pintu. [0:30-0:40] Seruan Fairus Syah & Terjun! Visual: Close-up wajah Fairus Syah. Ia menarik napas dalam-dalam, matanya penuh semangat. Fairus Syah melantangkan: "SAYA FAIRUS SYAH, DARI GROUP 3, ACCEPT 30 DAYS CHALLENGE EDISI KALI INI!" (Pastikan ekspresi dan suaranya penuh energi dan semangat!) Gerakan cepat: Ia langsung mendorong diri atau melompat keluar dari pesawat. Audio: Suara Fairus Syah yang lantang dan jelas. Suara dentuman saat ia melompat keluar. Musik latar yang mencapai klimaks. [0:40-1:15] Melayang di Udara (Freefall) Visual: Fairus Syah melayang bebas di udara, dengan posisi belly-to-earth yang stabil. Pemandangan spektakuler dari atas: awan di bawahnya, daratan yang membentang luas. Ekspresi Fairus yang penuh kebahagiaan, senyum lebar, dan mungkin teriakan kegembiraan (tanpa suara, hanya visual). Cuplikan dari berbagai sudut (jika memungkinkan, misalnya dari kamera di helm atau kamera yang dipegang instruktur). Ia mungkin melakukan sedikit gerakan atau pose di udara. Audio: Suara angin yang menderu kencang. Musik latar yang epik dan menginspirasi, membangun suasana kebebasan. [1:15-1:20] Momen Sebelum Payung Terbuka Visual: Close-up pada tangan Fairus yang bersiap menarik tali pembuka payung. Ekspresi fokus. (Opsional) Sedikit goyangan atau manuver singkat sebelum payung dibuka. Audio: Musik latar yang sedikit mereda, membangun ketegangan. [1:20-Akhir] Payung Terbuka & Pendaratan Visual: Payung terbuka dengan mulus. Gerakan melambat, Fairus mulai melayang dengan tenang di bawah payung. Pemandangan yang lebih tenang dan detail dari daratan saat ia mendekat. Pendaratan yang mulus. Fairus berdiri, melepas helm, dan tersenyum puas ke kamera. (Opsional) Teman-teman atau instruktur menyambutnya. Audio: Suara payung terbuka (whoosh). Suara angin yang lebih lembut. Musik latar yang tenang dan merayakan keberhasilan. Fairus mungkin mengucapkan sesuatu seperti "Berhasil!" atau "Luar biasa!" Tips Tambahan: Kualitas Kamera: Gunakan kamera aksi (GoPro atau sejenisnya) untuk hasil terbaik. Sudut Pengambilan: Manfaatkan beberapa sudut kamera jika memungkinkan (helm, tangan, instruktur). Ekspresi: Dorong Fairus untuk menunjukkan emosi yang kuat di setiap tahap. Penyuntingan: Pastikan transisi antar adegan mulus dan musik mendukung narasi visual. Semoga berhasil dengan videonya! Pasti akan sangat keren!
Prompt: Full-length, detailed, cinematic photography, high-definition, Wonder Woman glossy black hair, stern flirty starring expression with, strength detailed sword sharpness raised in dynamic fighting stance, craftsmanship armor. dark reds golds silver tones matte colors focus. Sunlight & shadow effects.::1 wet, illustration, drawing, cartoon, painting::-1 Full-length, detailed, cinematic photography, high-definition::1 --v 6.1 --style raw --ar 1:2 --s 1000 --p tu4jhwe --q 2 --iw 0.3 --sref --sw 25
The image features a woman wearing a black shirt and black pants, walking down a street while carrying a white purse. The woman appears to be walking confidently and gracefully, possibly enjoying her time outdoors. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4.1-Llama2 prompt generator)
The image features a man riding a wave on a surfboard. he is skillfully navigating the wave, showcasing her surfing abilities. The man is wearing a wetsuit, which provides his with the necessary protection and flexibility while surfing. The surfboard he is riding is positioned in the center of the image, with the man standing on it and maintaining his balance as he enjoys the thrill of the wave. (controlnet_mode:canny sdxlYamersRealism2, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 2-Llama2 prompt)
spacecraft in action, star wars, in the style of olympus af-1 (aka olympus infinity), cinematic stills, light gray and blue, i can't believe how beautiful this is, fragmented planes, light gray and dark emerald, frostpunk, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, a spaceship riding into view at a distance, in the style of #vfxfriday, changelingcore, imax, close up, i can't believe how beautiful this is, light indigo and white, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, photo, digital art, science fiction:: --v 5.2
Feature of a creature inspired by Dobby in Hary Potter, a small, hairless creature with long, thin fingers and toes. He is wearing a brown robe and has large, pointed ears. His eyes are wide open, and he appears to be looking at something with curiosity or interest. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 1-Llama2 prompt generator)
anime artwork long exposure photography, low angle, masterpiece photo of a young woman, Thin-legged body, a-cup breast, Cropped blouse, __aninme_clothes__, "Yare Yare" (casual, laid-back) Pose, Real-time Lighting Changes, Tilted architectural view, Olympus OM-1, in style of Anne Brigman . anime style, key visual, vibrant, studio anime, highly detailed
Create a premium Amazon A+ content banner for a foldable 9-in-1 multifunction electrician wire stripping plier. Image concept: Multi-Functionality Efficiency Positioning — demonstrate how one compact foldable plier replaces multiple individual electrician tools such as wire stripper, cutter, crimper, splitter, gripper, wrench, and wire twisting tool. The image should communicate time-saving, reduced tool clutter, portability, and faster workflow efficiency for electricians and technicians. Place the actual plier product in a dynamic 3/4 diagonal angle, slightly floating, with the stainless-steel head facing forward and the green-black-grey handles visible. Product should dominate 90% of the visual. Show accurate product details: stripping holes, engraved numbers, 5mm and 10mm markings, M4 marking, winding module, crimping section, screws, rivets, cutting edge, foldable hinge, and ergonomic handles. No voltage testing, no tester light, no glowing handle. Use a premium radial + diagonal industrial gradient background: #0B0D0E — 60% deep industrial black #006B5A — 25% dark green glow #BFC3C4 — 15% brushed silver highlight optional transition #1F2A2A Background should feel like a high-end electrical workshop: dark industrial mood, subtle blurred circuit panel, technical haze, brushed silver light streaks, green glow behind the product, clean and premium. Use premium 3D / semi-3D function graphics, not basic icons. Place them in a curved orbit formation around the plier, with subtle metallic connector lines and glassmorphism circular badges. Each badge should represent one function: wire stripping, cutting, crimping, wire twisting, wire splitting, wrenching, gripping, and clamping. Icons should be metallic silver-white with subtle green glow, bevelled depth, and premium engineering finish. Text should be only 10% of the image. Main headline: ONE TOOL. FASTER WORK. Subtitle: Replaces Multiple Electrician Tools Small punch tags: Strip • Cut • Crimp • Twist Use bold modern sans-serif typography, white or brushed silver with subtle green glow. Keep text clean, readable, minimal, and premium. Final output style: photorealistic, ultra-sharp 8K resolution, premium industrial tool advertisement, crisp stainless-steel reflections, accurate product geometry, sharp engraved markings, realistic metal texture, high-end A+ content visual, product-focused, no clutter. Negative prompt: No gardening tool, no pruning shears, no plants, no red gardening cutter, no voltage tester, no tester light, no glowing handle, no generic flat icons, no cartoon vectors, no cheap clipart, no distorted plier, no missing holes, no wrong numbers, no extra handles, no blurry product, no messy layout, no unreadable text, no watermark, no logo.
The portrait image features a large, colorful lizard with a neck and a long tail. The lizard is on a tree branch, and its vibrant colors make it stand out against the dark background. The lizard's head is turned to the side, and it appears to be looking at the camera. The lizard's unique appearance and striking colors make it an interesting and eye-catching subject in the image. oversize picture, HRD, 12K, extremely details, Clip Skip: 1, ENSD -1, <lora:sharpening_B_1.1:(1>:1.5)> ,"sharp", "focused", "intricately detailed", "12k", "uhd", "hdr", lr (controlnet_mode:canny sdxlYamersRealism2, sdxl-1.0.0.9.safetensors, SeargeSDXL4.2-Llama2 prompt)
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
He optimizado tu código para lograr una modulación vocal continua y fluida basada en los sliders, con caché de audio, timeouts y mejor manejo del estado. Ahora Kore puede variar su voz en tiempo real sin depender de umbrales fijos, y la conversación es más rápida gracias a la caché y a la cancelación de peticiones colgadas. ```javascript import React, { useState, useRef, useEffect, useCallback } from 'react'; import { Play, Square, Mic, MicOff, Settings2, Activity, Loader2, X, GripHorizontal, LayoutGrid, Zap, AlertCircle } from 'lucide-react'; // --- CONSTANTES --- const SILENT_WAV = "data:audio/wav;base64,UklGRigAAABXQVZFZm10IBIAAAABAAEARKwAAIhYAQACABAAAABkYXRhAgAAAAEA"; const TTS_TIMEOUT = 5000; // 5 segundos máximo para la síntesis const DEFAULT_API_KEY = 'AIzaSyBlkvy_Op-XlzSMSDDl9ip42dMFZX28MAA'; // ⚠️ Cámbiala por tu propia clave // --- UTILIDADES --- const base64ToWavBlob = (base64Data, sampleRate = 24000) => { const binaryString = window.atob(base64Data); const pcmData = new Uint8Array(binaryString.length); for (let i = 0; i < binaryString.length; i++) pcmData[i] = binaryString.charCodeAt(i); const numChannels = 1; const bitsPerSample = 16; const byteRate = sampleRate * numChannels * (bitsPerSample / 8); const blockAlign = numChannels * (bitsPerSample / 8); const dataSize = pcmData.length; const buffer = new ArrayBuffer(44 + dataSize); const view = new DataView(buffer); const writeString = (view, offset, string) => { for (let i = 0; i < string.length; i++) view.setUint8(offset + i, string.charCodeAt(i)); }; writeString(view, 0, 'RIFF'); view.setUint32(4, 36 + dataSize, true); writeString(view, 8, 'WAVE'); writeString(view, 12, 'fmt '); view.setUint32(16, 16, true); view.setUint16(20, 1, true); view.setUint16(22, numChannels, true); view.setUint32(24, sampleRate, true); view.setUint32(28, byteRate, true); view.setUint16(32, blockAlign, true); view.setUint16(34, bitsPerSample, true); writeString(view, 36, 'data'); view.setUint32(40, dataSize, true); for (let i = 0; i < dataSize; i++) view.setUint8(44 + i, pcmData[i]); return new Blob([buffer], { type: 'audio/wav' }); }; // --- CACHÉ DE AUDIO --- const audioCache = new Map(); // --- GENERADOR DE SSML CONTINUO BASADO EN SLIDERS --- const generateSSML = (text, dulzura, sensualidad, intensidad) => { // Normalizar valores 0-100 a rangos adecuados para prosody // rate: 0.5 a 2.0 (1.0 es normal) const rate = 0.8 + (intensidad / 100) * 1.2; // 0.8 (lento) a 2.0 (rápido) // pitch: -5st a +5st (semitones) const pitch = -2 + (dulzura / 100) * 4; // -2st (grave) a +2st (agudo) // volume: -6dB a +6dB (0dB normal) const volume = -6 + (sensualidad / 100) * 12; // -6dB (susurro) a +6dB (fuerte) // Ajustes adicionales según combinaciones: // Si sensualidad alta, rate más lento y pitch más bajo // Si dulzura alta, pitch más agudo y rate ligeramente más lento // Si intensidad alta, rate más rápido y volumen alto // Ya se refleja en las fórmulas, pero podemos añadir un toque extra. const ssml = `<speak> <prosody rate="${rate.toFixed(2)}" pitch="${pitch.toFixed(0)}st" volume="${volume.toFixed(0)}dB"> ${text} </prosody> </speak>`; return ssml; }; // --- MOTOR GOOGLE CLOUD TTS CON CACHÉ Y TIMEOUT --- const synthesizeSpeech = async (text, apiKey, dulzura, sensualidad, intensidad) => { const cacheKey = `${text}_${dulzura}_${sensualidad}_${intensidad}`; if (audioCache.has(cacheKey)) { console.log('🎯 Usando audio cacheado'); return audioCache.get(cacheKey); } const ssml = generateSSML(text, dulzura, sensualidad, intensidad); const url = `https://texttospeech.googleapis.com/v1/text:synthesize?key=${apiKey}`; const body = { input: { ssml }, voice: { languageCode: 'es-ES', name: 'es-ES-Neural2-F', ssmlGender: 'FEMALE' }, audioConfig: { audioEncoding: 'LINEAR16', sampleRateHertz: 24000 } }; const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), TTS_TIMEOUT); try { const res = await fetch(url, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(body), signal: controller.signal }); clearTimeout(timeoutId); if (!res.ok) throw new Error(`TTS error: ${res.status}`); const data = await res.json(); audioCache.set(cacheKey, data.audioContent); return data.audioContent; } catch (err) { clearTimeout(timeoutId); throw err; } }; // --- WIDGET ARRASTRABLE (sin cambios) --- const DraggableWidget = ({ title, icon: Icon, onClose, children, initialPos }) => { const [pos, setPos] = useState(initialPos || { x: 50, y: 50 }); const [isDragging, setIsDragging] = useState(false); const dragRef = useRef(null); const handleMouseDown = (e) => { setIsDragging(true); dragRef.current = { startX: e.clientX, startY: e.clientY, initialX: pos.x, initialY: pos.y }; }; const handleMouseMove = (e) => { if (!isDragging) return; setPos({ x: Math.max(0, dragRef.current.initialX + (e.clientX - dragRef.current.startX)), y: Math.max(0, dragRef.current.initialY + (e.clientY - dragRef.current.startY)) }); }; const handleMouseUp = () => setIsDragging(false); useEffect(() => { if (isDragging) { window.addEventListener('mousemove', handleMouseMove); window.addEventListener('mouseup', handleMouseUp); } return () => { window.removeEventListener('mousemove', handleMouseMove); window.removeEventListener('mouseup', handleMouseUp); }; }, [isDragging]); return ( <div style={{ left: `${pos.x}px`, top: `${pos.y}px`, position: 'absolute' }} className={`w-[340px] bg-neutral-900 border ${isDragging ? 'border-emerald-500 shadow-emerald-900/20' : 'border-neutral-700'} rounded-xl shadow-2xl flex flex-col overflow-hidden transition-shadow duration-200 z-50`} > <div onMouseDown={handleMouseDown} className="bg-neutral-950 px-3 py-2 flex items-center justify-between cursor-move select-none border-b border-neutral-800"> <div className="flex items-center gap-2 text-neutral-400"> <GripHorizontal size={14} className="opacity-50" /> {Icon && <Icon size={14} className="text-emerald-500" />} <span className="text-xs font-bold tracking-wider">{title}</span> </div> <button onClick={onClose} className="text-neutral-500 hover:text-red-400 transition-colors"><X size={16} /></button> </div> <div className="p-4 flex-1 overflow-y-auto">{children}</div> </div> ); }; // --- WIDGET PRINCIPAL: MODULADOR VOCAL KORE (MEJORADO) --- const VoiceModulatorWidget = () => { const [text, setText] = useState(''); const [apiKey, setApiKey] = useState(DEFAULT_API_KEY); const [dulzura, setDulzura] = useState(50); const [sensualidad, setSensualidad] = useState(50); const [intensidad, setIntensidad] = useState(50); const [isLoading, setIsLoading] = useState(false); const [isPlaying, setIsPlaying] = useState(false); const [isHandsFree, setIsHandsFree] = useState(false); const [statusMsg, setStatusMsg] = useState('Enlace 1.5 Flash + GCP TTS Establecido.'); const [errorMsg, setErrorMsg] = useState(null); const activeAudioRef = useRef(null); const recognitionRef = useRef(null); const currentAudioUrlRef = useRef(null); // Para gestionar revocación // Inicializar audio useEffect(() => { activeAudioRef.current = new Audio(); activeAudioRef.current.preload = "auto"; return () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } } if (recognitionRef.current) recognitionRef.current.stop(); }; }, []); // Configurar reconocimiento de voz useEffect(() => { if (!('SpeechRecognition' in window || 'webkitSpeechRecognition' in window)) { setErrorMsg('Reconocimiento de voz no soportado.'); return; } const SpeechRecognition = window.SpeechRecognition || window.webkitSpeechRecognition; recognitionRef.current = new SpeechRecognition(); recognitionRef.current.lang = 'es-ES'; recognitionRef.current.interimResults = false; recognitionRef.current.continuous = false; recognitionRef.current.onresult = async (event) => { const transcript = event.results[0][0].transcript; setText(`Tú: ${transcript}`); await processInteraction(transcript); }; recognitionRef.current.onerror = (event) => { if (event.error !== 'no-speech') { setErrorMsg(`Micrófono: ${event.error}`); setIsHandsFree(false); } }; recognitionRef.current.onend = () => { if (isHandsFree && !isPlaying && !isLoading) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; // Limpiar al desmontar return () => { if (recognitionRef.current) recognitionRef.current.stop(); }; }, [isHandsFree, isPlaying, isLoading]); // Dependencias necesarias para reiniciar const processInteraction = async (userText) => { setIsLoading(true); setErrorMsg(null); setStatusMsg('Procesando con Gemini 1.5 Flash...'); const key = apiKey.trim(); try { // 1. Llamada a Gemini con timeout const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), 5000); const payloadText = { contents: [{ parts: [{ text: userText }] }], systemInstruction: { parts: [{ text: `Eres Kore, 28 años, Huesca. Labia, directa, sensual, disruptiva. Responde en español, máx 20 palabras. REGLA INNEGOCIABLE: CERO PREGUNTAS.` }] } }; const resText = await fetch( `https://generativelanguage.googleapis.com/v1beta/models/gemini-1.5-flash:generateContent?key=${key}`, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(payloadText), signal: controller.signal } ); clearTimeout(timeoutId); if (!resText.ok) throw new Error(`Gemini error: ${resText.status}`); const dataText = await resText.json(); const aiText = dataText.candidates?.[0]?.content?.parts?.[0]?.text || "Mmm... vale."; setText(`Kore: ${aiText}`); // 2. Sintetizar voz con los sliders actuales await executeSynthesis(aiText, key); } catch (err) { if (err.name === 'AbortError') { setErrorMsg('Gemini timeout (5s)'); } else { setErrorMsg(err.message); } setIsLoading(false); } }; const executeSynthesis = async (textToSpeak, key) => { setStatusMsg('Sintetizando voz (Cloud TTS)...'); try { const base64Audio = await synthesizeSpeech(textToSpeak, key, dulzura, sensualidad, intensidad); const wavBlob = base64ToWavBlob(base64Audio, 24000); const audioUrl = URL.createObjectURL(wavBlob); // Revocar URL anterior si existe if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } currentAudioUrlRef.current = audioUrl; activeAudioRef.current.src = audioUrl; activeAudioRef.current.onended = () => { setIsPlaying(false); setStatusMsg('Transmisión completada.'); if (isHandsFree) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; setStatusMsg('Transmitiendo...'); setIsPlaying(true); setIsLoading(false); await activeAudioRef.current.play().catch(err => { throw new Error(`Autoplay bloqueado: ${err.message}`); }); } catch (error) { throw new Error(`Fallo TTS: ${error.message}`); } }; const handleManualPlay = async () => { if (!text.trim()) return setErrorMsg('Escribe algo primero.'); // Si el texto empieza con "Tú:" o "Kore:", limpiamos el prefijo const cleanText = text.replace(/^(Tú:|Kore:)\s*/, ''); if (!cleanText.trim()) return setErrorMsg('Texto vacío después de limpiar.'); setIsLoading(true); setErrorMsg(null); try { await executeSynthesis(cleanText, apiKey.trim()); } catch (err) { setErrorMsg(err.message); setIsLoading(false); } }; const toggleHandsFree = () => { if (!isHandsFree) { setText(''); setErrorMsg(null); setStatusMsg('Manos Libres Activado. Habla...'); // Desbloquear audio en algunos navegadores if (activeAudioRef.current) { activeAudioRef.current.src = SILENT_WAV; activeAudioRef.current.play().catch(() => {}); } try { recognitionRef.current.start(); } catch (e) {} } else { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Sistemas en pausa.'); if (recognitionRef.current) recognitionRef.current.stop(); } setIsHandsFree(!isHandsFree); }; const stopAudio = () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Señal interrumpida.'); }; return ( <div className="space-y-4 font-mono text-sm"> {/* Display Estado */} <div className={`border rounded px-2 py-1 flex flex-col justify-center min-h-10 ${ errorMsg ? 'bg-red-950/50 border-red-900' : isHandsFree ? 'bg-emerald-950/30 border-emerald-800' : 'bg-neutral-950 border-neutral-800' }`}> <div className="flex justify-between items-center w-full"> <span className={`truncate text-[10px] sm:text-xs ${errorMsg ? 'text-red-500' : 'text-emerald-500'}`}> > {errorMsg || statusMsg} </span> {isPlaying && !errorMsg && <Activity size={14} className="text-emerald-500 animate-pulse ml-2 flex-shrink-0" />} {isLoading && !errorMsg && <Zap size={14} className="text-amber-500 animate-pulse ml-2 flex-shrink-0" />} {isHandsFree && !isPlaying && !isLoading && !errorMsg && <Mic size={14} className="text-red-500 animate-pulse ml-2 flex-shrink-0" />} </div> </div> {/* Input Texto / Log */} <textarea value={text} onChange={(e) => setText(e.target.value)} className="w-full bg-neutral-950/50 border border-neutral-700 rounded p-2 text-xs text-neutral-300 focus:outline-none focus:border-emerald-500 resize-none h-20" placeholder={isHandsFree ? "Escuchando transcripción en tiempo real..." : "Escribe texto directo o activa Manos Libres..."} readOnly={isHandsFree || isLoading} /> {/* Sliders continuos (controlan SSML en tiempo real) */} <div className="space-y-3 bg-neutral-950/30 p-3 rounded border border-neutral-800"> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Agresiva</span><span className="text-emerald-400">Dulzura [{dulzura}]</span><span>Dulce</span> </div> <input type="range" min="0" max="100" value={dulzura} onChange={(e)=>setDulzura(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-emerald-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Robótica</span><span className="text-pink-400">Aura [{sensualidad}]</span><span>Sensual</span> </div> <input type="range" min="0" max="100" value={sensualidad} onChange={(e)=>setSensualidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-pink-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Atenuada</span><span className="text-amber-400">Intensidad [{intensidad}]</span><span>Fuerte</span> </div> <input type="range" min="0" max="100" value={intensidad} onChange={(e)=>setIntensidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-amber-500 cursor-pointer" /> </div> </div> {/* Botones de Control */} <div className="flex flex-col sm:flex-row gap-2"> <button onClick={toggleHandsFree} disabled={isLoading} className={`flex-1 py-2 rounded text-xs font-bold flex items-center justify-center gap-2 transition-colors border ${ isHandsFree ? 'bg-red-900/20 text-red-400 border-red-900/50 hover:bg-red-900/40 shadow-[0_0_10px_rgba(239,68,68,0.2)]' : 'bg-indigo-900/20 text-indigo-400 border-indigo-900/50 hover:bg-indigo-900/40' }`} > {isHandsFree ? <MicOff size={14} /> : <Mic size={14} />} {isHandsFree ? 'Detener Escucha' : 'Manos Libres'} </button> <div className="flex gap-2 flex-1"> <button onClick={handleManualPlay} disabled={isLoading || isPlaying || isHandsFree} className="flex-1 bg-emerald-600/20 hover:bg-emerald-600/40 text-emerald-400 border border-emerald-600/50 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center gap-1 transition-colors" > {isLoading ? <Loader2 size={14} className="animate-spin" /> : <Play size={14} />} Sintetizar </button> <button onClick={stopAudio} disabled={!isPlaying && !isHandsFree} className="px-4 bg-neutral-800 hover:bg-neutral-700 text-neutral-400 border border-neutral-700 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center transition-colors" > <Square size={14} /> </button> </div> </div> {/* Botón para limpiar caché (opcional) */} <div className="text-right"> <button onClick={() => audioCache.clear()} className="text-[8px] text-neutral-600 hover:text-neutral-400 underline" > limpiar caché de audio </button> </div> </div> ); }; // --- ENTORNO ESCRITORIO (sin cambios) --- export default function App() { const [widgets, setWidgets] = useState({ voice: { isOpen: true, pos: { x: window.innerWidth > 768 ? window.innerWidth / 2 - 170 : 20, y: 40 } } }); const toggleWidget = (id) => { setWidgets(prev => ({ ...prev, [id]: { ...prev[id], isOpen: !prev[id].isOpen } })); }; return ( <div className="w-full h-screen bg-neutral-950 bg-[radial-gradient(ellipse_80%_80%_at_50%_-20%,rgba(16,185,129,0.1),rgba(0,0,0,1))] overflow-hidden relative font-sans text-neutral-200"> <div className="absolute inset-0 flex items-center justify-center opacity-[0.02] pointer-events-none"><Settings2 size={500} /></div> {widgets.voice.isOpen && ( <DraggableWidget title="MODULADOR VOCAL KORE" icon={Zap} initialPos={widgets.voice.pos} onClose={() => toggleWidget('voice')}> <VoiceModulatorWidget /> </DraggableWidget> )} <div className="absolute bottom-6 left-1/2 transform -translate-x-1/2 bg-neutral-900/80 backdrop-blur-md border border-neutral-700/50 p-2 rounded-2xl shadow-2xl flex gap-2 z-[100]"> <div className="px-3 flex items-center border-r border-neutral-700/50 text-neutral-500"><LayoutGrid size={20} /></div> <button onClick={() => toggleWidget('voice')} className={`px-4 py-2 rounded-xl flex items-center gap-2 text-sm font-medium transition-all ${
The image features a woman wearing a black shirt and black pants, walking down a street while carrying a white purse. The woman appears to be walking confidently and gracefully, possibly enjoying her time outdoors. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4.1-Llama2 prompt generator)
spacecraft in action, star wars, in the style of olympus af-1 (aka olympus infinity), cinematic stills, light gray and blue, i can't believe how beautiful this is, fragmented planes, light gray and dark emerald, frostpunk, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, a spaceship riding into view at a distance, in the style of #vfxfriday, changelingcore, imax, close up, i can't believe how beautiful this is, light indigo and white, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, photo, digital art, science fiction:: --v 5.2
Feature of a creature inspired by Dobby in Hary Potter, a small, hairless creature with long, thin fingers and toes. He is wearing a brown robe and has large, pointed ears. His eyes are wide open, and he appears to be looking at something with curiosity or interest. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 1-Llama2 prompt generator)
anime artwork long exposure photography, low angle, masterpiece photo of a young woman, Thin-legged body, a-cup breast, Cropped blouse, __aninme_clothes__, "Yare Yare" (casual, laid-back) Pose, Real-time Lighting Changes, Tilted architectural view, Olympus OM-1, in style of Anne Brigman . anime style, key visual, vibrant, studio anime, highly detailed
The portrait image features a large, colorful lizard with a neck and a long tail. The lizard is on a tree branch, and its vibrant colors make it stand out against the dark background. The lizard's head is turned to the side, and it appears to be looking at the camera. The lizard's unique appearance and striking colors make it an interesting and eye-catching subject in the image. oversize picture, HRD, 12K, extremely details, Clip Skip: 1, ENSD -1, <lora:sharpening_B_1.1:(1>:1.5)> ,"sharp", "focused", "intricately detailed", "12k", "uhd", "hdr", lr (controlnet_mode:canny sdxlYamersRealism2, sdxl-1.0.0.9.safetensors, SeargeSDXL4.2-Llama2 prompt)
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
--purple-1: #6b2ac8; --purple-2: #7d28f9; --light-purple: #e1c9e3; --black-main: #1c1a1e; --glow-purple: #cb8ff0; --dark-purple: #3f1a76; --gray: #68666a; --soft-purple: #a282ab; --deep-bg: #3a274c; } 🎨 SCSS $purple-1: #6b2ac8; $purple-2: #7d28f9; $light-purple: #e1c9e3; $black-main: #1c1a1e; $glow-purple: #cb8ff0; $dark-purple: #3f1a76; $gray: #68666a; $soft-purple: #a282ab; $deep-bg: #3a274c; 🎨 SCSS (RGB) $purple-1: rgba(107,42,200,1); $purple-2: rgba(125,40,249,1); $light-purple: rgba(225,201,227,1); $black-main: rgba(28,26,30,1); $glow-purple: rgba(203,143,240,1); $dark-purple: rgba(63,26,118,1); $gray: rgba(104,102,106,1); $soft-purple: rgba(162,130,171,1); $deep-bg: rgba(58,39,76,1);
Judul Video: Saya Fairus Syah, Dari group 3, Accept 30 Days Challenge edisi Kali ni..LU TAK BERANI, LU BOLEH BALIK!! Durasi: Sekitar 1-2 menit (bisa disesuaikan) Musik Latar: Musik yang mendebarkan dan memacu adrenalin, lalu menjadi lebih epik dan menginspirasi setelah terjun. [0:00-0:15] Suasana Persiapan di Pesawat Visual: Fairus Syah (dengan perlengkapan terjun payung lengkap) duduk di dalam pesawat, terlihat sedikit tegang namun bersemangat. Cuplikan singkat teman-teman atau instruktur di sekitarnya yang memberikan semangat atau melakukan pemeriksaan akhir. Pemandangan awan atau daratan dari jendela pesawat yang semakin dekat. Close-up pada ekspresi Fairus yang menunjukkan antisipasi. Audio: Suara mesin pesawat yang menderu. Suara instruktur yang memberikan instruksi singkat (opsional, bisa hanya visual). Fairus mengambil napas dalam-dalam. [0:15-0:30] Momen di Ambang Pintu Pesawat Visual: Fairus Syah bergerak ke arah pintu pesawat yang terbuka. Angin kencang menerpa. Pemandangan luas di bawah yang menakjubkan (langit biru, awan, daratan). Instruktur di sampingnya memberikan isyarat terakhir. Fairus menoleh ke kamera dengan ekspresi tekad. Audio: Suara angin yang sangat kencang. Fairus Syah mengambil posisi di ambang pintu. [0:30-0:40] Seruan Fairus Syah & Terjun! Visual: Close-up wajah Fairus Syah. Ia menarik napas dalam-dalam, matanya penuh semangat. Fairus Syah melantangkan: "SAYA FAIRUS SYAH, DARI GROUP 3, ACCEPT 30 DAYS CHALLENGE EDISI KALI INI!" (Pastikan ekspresi dan suaranya penuh energi dan semangat!) Gerakan cepat: Ia langsung mendorong diri atau melompat keluar dari pesawat. Audio: Suara Fairus Syah yang lantang dan jelas. Suara dentuman saat ia melompat keluar. Musik latar yang mencapai klimaks. [0:40-1:15] Melayang di Udara (Freefall) Visual: Fairus Syah melayang bebas di udara, dengan posisi belly-to-earth yang stabil. Pemandangan spektakuler dari atas: awan di bawahnya, daratan yang membentang luas. Ekspresi Fairus yang penuh kebahagiaan, senyum lebar, dan mungkin teriakan kegembiraan (tanpa suara, hanya visual). Cuplikan dari berbagai sudut (jika memungkinkan, misalnya dari kamera di helm atau kamera yang dipegang instruktur). Ia mungkin melakukan sedikit gerakan atau pose di udara. Audio: Suara angin yang menderu kencang. Musik latar yang epik dan menginspirasi, membangun suasana kebebasan. [1:15-1:20] Momen Sebelum Payung Terbuka Visual: Close-up pada tangan Fairus yang bersiap menarik tali pembuka payung. Ekspresi fokus. (Opsional) Sedikit goyangan atau manuver singkat sebelum payung dibuka. Audio: Musik latar yang sedikit mereda, membangun ketegangan. [1:20-Akhir] Payung Terbuka & Pendaratan Visual: Payung terbuka dengan mulus. Gerakan melambat, Fairus mulai melayang dengan tenang di bawah payung. Pemandangan yang lebih tenang dan detail dari daratan saat ia mendekat. Pendaratan yang mulus. Fairus berdiri, melepas helm, dan tersenyum puas ke kamera. (Opsional) Teman-teman atau instruktur menyambutnya. Audio: Suara payung terbuka (whoosh). Suara angin yang lebih lembut. Musik latar yang tenang dan merayakan keberhasilan. Fairus mungkin mengucapkan sesuatu seperti "Berhasil!" atau "Luar biasa!" Tips Tambahan: Kualitas Kamera: Gunakan kamera aksi (GoPro atau sejenisnya) untuk hasil terbaik. Sudut Pengambilan: Manfaatkan beberapa sudut kamera jika memungkinkan (helm, tangan, instruktur). Ekspresi: Dorong Fairus untuk menunjukkan emosi yang kuat di setiap tahap. Penyuntingan: Pastikan transisi antar adegan mulus dan musik mendukung narasi visual. Semoga berhasil dengan videonya! Pasti akan sangat keren!
Prompt: Full-length, detailed, cinematic photography, high-definition, Wonder Woman glossy black hair, stern flirty starring expression with, strength detailed sword sharpness raised in dynamic fighting stance, craftsmanship armor. dark reds golds silver tones matte colors focus. Sunlight & shadow effects.::1 wet, illustration, drawing, cartoon, painting::-1 Full-length, detailed, cinematic photography, high-definition::1 --v 6.1 --style raw --ar 1:2 --s 1000 --p tu4jhwe --q 2 --iw 0.3 --sref --sw 25
The image features a man riding a wave on a surfboard. he is skillfully navigating the wave, showcasing her surfing abilities. The man is wearing a wetsuit, which provides his with the necessary protection and flexibility while surfing. The surfboard he is riding is positioned in the center of the image, with the man standing on it and maintaining his balance as he enjoys the thrill of the wave. (controlnet_mode:canny sdxlYamersRealism2, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 2-Llama2 prompt)
Create a premium Amazon A+ content banner for a foldable 9-in-1 multifunction electrician wire stripping plier. Image concept: Multi-Functionality Efficiency Positioning — demonstrate how one compact foldable plier replaces multiple individual electrician tools such as wire stripper, cutter, crimper, splitter, gripper, wrench, and wire twisting tool. The image should communicate time-saving, reduced tool clutter, portability, and faster workflow efficiency for electricians and technicians. Place the actual plier product in a dynamic 3/4 diagonal angle, slightly floating, with the stainless-steel head facing forward and the green-black-grey handles visible. Product should dominate 90% of the visual. Show accurate product details: stripping holes, engraved numbers, 5mm and 10mm markings, M4 marking, winding module, crimping section, screws, rivets, cutting edge, foldable hinge, and ergonomic handles. No voltage testing, no tester light, no glowing handle. Use a premium radial + diagonal industrial gradient background: #0B0D0E — 60% deep industrial black #006B5A — 25% dark green glow #BFC3C4 — 15% brushed silver highlight optional transition #1F2A2A Background should feel like a high-end electrical workshop: dark industrial mood, subtle blurred circuit panel, technical haze, brushed silver light streaks, green glow behind the product, clean and premium. Use premium 3D / semi-3D function graphics, not basic icons. Place them in a curved orbit formation around the plier, with subtle metallic connector lines and glassmorphism circular badges. Each badge should represent one function: wire stripping, cutting, crimping, wire twisting, wire splitting, wrenching, gripping, and clamping. Icons should be metallic silver-white with subtle green glow, bevelled depth, and premium engineering finish. Text should be only 10% of the image. Main headline: ONE TOOL. FASTER WORK. Subtitle: Replaces Multiple Electrician Tools Small punch tags: Strip • Cut • Crimp • Twist Use bold modern sans-serif typography, white or brushed silver with subtle green glow. Keep text clean, readable, minimal, and premium. Final output style: photorealistic, ultra-sharp 8K resolution, premium industrial tool advertisement, crisp stainless-steel reflections, accurate product geometry, sharp engraved markings, realistic metal texture, high-end A+ content visual, product-focused, no clutter. Negative prompt: No gardening tool, no pruning shears, no plants, no red gardening cutter, no voltage tester, no tester light, no glowing handle, no generic flat icons, no cartoon vectors, no cheap clipart, no distorted plier, no missing holes, no wrong numbers, no extra handles, no blurry product, no messy layout, no unreadable text, no watermark, no logo.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
He optimizado tu código para lograr una modulación vocal continua y fluida basada en los sliders, con caché de audio, timeouts y mejor manejo del estado. Ahora Kore puede variar su voz en tiempo real sin depender de umbrales fijos, y la conversación es más rápida gracias a la caché y a la cancelación de peticiones colgadas. ```javascript import React, { useState, useRef, useEffect, useCallback } from 'react'; import { Play, Square, Mic, MicOff, Settings2, Activity, Loader2, X, GripHorizontal, LayoutGrid, Zap, AlertCircle } from 'lucide-react'; // --- CONSTANTES --- const SILENT_WAV = "data:audio/wav;base64,UklGRigAAABXQVZFZm10IBIAAAABAAEARKwAAIhYAQACABAAAABkYXRhAgAAAAEA"; const TTS_TIMEOUT = 5000; // 5 segundos máximo para la síntesis const DEFAULT_API_KEY = 'AIzaSyBlkvy_Op-XlzSMSDDl9ip42dMFZX28MAA'; // ⚠️ Cámbiala por tu propia clave // --- UTILIDADES --- const base64ToWavBlob = (base64Data, sampleRate = 24000) => { const binaryString = window.atob(base64Data); const pcmData = new Uint8Array(binaryString.length); for (let i = 0; i < binaryString.length; i++) pcmData[i] = binaryString.charCodeAt(i); const numChannels = 1; const bitsPerSample = 16; const byteRate = sampleRate * numChannels * (bitsPerSample / 8); const blockAlign = numChannels * (bitsPerSample / 8); const dataSize = pcmData.length; const buffer = new ArrayBuffer(44 + dataSize); const view = new DataView(buffer); const writeString = (view, offset, string) => { for (let i = 0; i < string.length; i++) view.setUint8(offset + i, string.charCodeAt(i)); }; writeString(view, 0, 'RIFF'); view.setUint32(4, 36 + dataSize, true); writeString(view, 8, 'WAVE'); writeString(view, 12, 'fmt '); view.setUint32(16, 16, true); view.setUint16(20, 1, true); view.setUint16(22, numChannels, true); view.setUint32(24, sampleRate, true); view.setUint32(28, byteRate, true); view.setUint16(32, blockAlign, true); view.setUint16(34, bitsPerSample, true); writeString(view, 36, 'data'); view.setUint32(40, dataSize, true); for (let i = 0; i < dataSize; i++) view.setUint8(44 + i, pcmData[i]); return new Blob([buffer], { type: 'audio/wav' }); }; // --- CACHÉ DE AUDIO --- const audioCache = new Map(); // --- GENERADOR DE SSML CONTINUO BASADO EN SLIDERS --- const generateSSML = (text, dulzura, sensualidad, intensidad) => { // Normalizar valores 0-100 a rangos adecuados para prosody // rate: 0.5 a 2.0 (1.0 es normal) const rate = 0.8 + (intensidad / 100) * 1.2; // 0.8 (lento) a 2.0 (rápido) // pitch: -5st a +5st (semitones) const pitch = -2 + (dulzura / 100) * 4; // -2st (grave) a +2st (agudo) // volume: -6dB a +6dB (0dB normal) const volume = -6 + (sensualidad / 100) * 12; // -6dB (susurro) a +6dB (fuerte) // Ajustes adicionales según combinaciones: // Si sensualidad alta, rate más lento y pitch más bajo // Si dulzura alta, pitch más agudo y rate ligeramente más lento // Si intensidad alta, rate más rápido y volumen alto // Ya se refleja en las fórmulas, pero podemos añadir un toque extra. const ssml = `<speak> <prosody rate="${rate.toFixed(2)}" pitch="${pitch.toFixed(0)}st" volume="${volume.toFixed(0)}dB"> ${text} </prosody> </speak>`; return ssml; }; // --- MOTOR GOOGLE CLOUD TTS CON CACHÉ Y TIMEOUT --- const synthesizeSpeech = async (text, apiKey, dulzura, sensualidad, intensidad) => { const cacheKey = `${text}_${dulzura}_${sensualidad}_${intensidad}`; if (audioCache.has(cacheKey)) { console.log('🎯 Usando audio cacheado'); return audioCache.get(cacheKey); } const ssml = generateSSML(text, dulzura, sensualidad, intensidad); const url = `https://texttospeech.googleapis.com/v1/text:synthesize?key=${apiKey}`; const body = { input: { ssml }, voice: { languageCode: 'es-ES', name: 'es-ES-Neural2-F', ssmlGender: 'FEMALE' }, audioConfig: { audioEncoding: 'LINEAR16', sampleRateHertz: 24000 } }; const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), TTS_TIMEOUT); try { const res = await fetch(url, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(body), signal: controller.signal }); clearTimeout(timeoutId); if (!res.ok) throw new Error(`TTS error: ${res.status}`); const data = await res.json(); audioCache.set(cacheKey, data.audioContent); return data.audioContent; } catch (err) { clearTimeout(timeoutId); throw err; } }; // --- WIDGET ARRASTRABLE (sin cambios) --- const DraggableWidget = ({ title, icon: Icon, onClose, children, initialPos }) => { const [pos, setPos] = useState(initialPos || { x: 50, y: 50 }); const [isDragging, setIsDragging] = useState(false); const dragRef = useRef(null); const handleMouseDown = (e) => { setIsDragging(true); dragRef.current = { startX: e.clientX, startY: e.clientY, initialX: pos.x, initialY: pos.y }; }; const handleMouseMove = (e) => { if (!isDragging) return; setPos({ x: Math.max(0, dragRef.current.initialX + (e.clientX - dragRef.current.startX)), y: Math.max(0, dragRef.current.initialY + (e.clientY - dragRef.current.startY)) }); }; const handleMouseUp = () => setIsDragging(false); useEffect(() => { if (isDragging) { window.addEventListener('mousemove', handleMouseMove); window.addEventListener('mouseup', handleMouseUp); } return () => { window.removeEventListener('mousemove', handleMouseMove); window.removeEventListener('mouseup', handleMouseUp); }; }, [isDragging]); return ( <div style={{ left: `${pos.x}px`, top: `${pos.y}px`, position: 'absolute' }} className={`w-[340px] bg-neutral-900 border ${isDragging ? 'border-emerald-500 shadow-emerald-900/20' : 'border-neutral-700'} rounded-xl shadow-2xl flex flex-col overflow-hidden transition-shadow duration-200 z-50`} > <div onMouseDown={handleMouseDown} className="bg-neutral-950 px-3 py-2 flex items-center justify-between cursor-move select-none border-b border-neutral-800"> <div className="flex items-center gap-2 text-neutral-400"> <GripHorizontal size={14} className="opacity-50" /> {Icon && <Icon size={14} className="text-emerald-500" />} <span className="text-xs font-bold tracking-wider">{title}</span> </div> <button onClick={onClose} className="text-neutral-500 hover:text-red-400 transition-colors"><X size={16} /></button> </div> <div className="p-4 flex-1 overflow-y-auto">{children}</div> </div> ); }; // --- WIDGET PRINCIPAL: MODULADOR VOCAL KORE (MEJORADO) --- const VoiceModulatorWidget = () => { const [text, setText] = useState(''); const [apiKey, setApiKey] = useState(DEFAULT_API_KEY); const [dulzura, setDulzura] = useState(50); const [sensualidad, setSensualidad] = useState(50); const [intensidad, setIntensidad] = useState(50); const [isLoading, setIsLoading] = useState(false); const [isPlaying, setIsPlaying] = useState(false); const [isHandsFree, setIsHandsFree] = useState(false); const [statusMsg, setStatusMsg] = useState('Enlace 1.5 Flash + GCP TTS Establecido.'); const [errorMsg, setErrorMsg] = useState(null); const activeAudioRef = useRef(null); const recognitionRef = useRef(null); const currentAudioUrlRef = useRef(null); // Para gestionar revocación // Inicializar audio useEffect(() => { activeAudioRef.current = new Audio(); activeAudioRef.current.preload = "auto"; return () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } } if (recognitionRef.current) recognitionRef.current.stop(); }; }, []); // Configurar reconocimiento de voz useEffect(() => { if (!('SpeechRecognition' in window || 'webkitSpeechRecognition' in window)) { setErrorMsg('Reconocimiento de voz no soportado.'); return; } const SpeechRecognition = window.SpeechRecognition || window.webkitSpeechRecognition; recognitionRef.current = new SpeechRecognition(); recognitionRef.current.lang = 'es-ES'; recognitionRef.current.interimResults = false; recognitionRef.current.continuous = false; recognitionRef.current.onresult = async (event) => { const transcript = event.results[0][0].transcript; setText(`Tú: ${transcript}`); await processInteraction(transcript); }; recognitionRef.current.onerror = (event) => { if (event.error !== 'no-speech') { setErrorMsg(`Micrófono: ${event.error}`); setIsHandsFree(false); } }; recognitionRef.current.onend = () => { if (isHandsFree && !isPlaying && !isLoading) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; // Limpiar al desmontar return () => { if (recognitionRef.current) recognitionRef.current.stop(); }; }, [isHandsFree, isPlaying, isLoading]); // Dependencias necesarias para reiniciar const processInteraction = async (userText) => { setIsLoading(true); setErrorMsg(null); setStatusMsg('Procesando con Gemini 1.5 Flash...'); const key = apiKey.trim(); try { // 1. Llamada a Gemini con timeout const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), 5000); const payloadText = { contents: [{ parts: [{ text: userText }] }], systemInstruction: { parts: [{ text: `Eres Kore, 28 años, Huesca. Labia, directa, sensual, disruptiva. Responde en español, máx 20 palabras. REGLA INNEGOCIABLE: CERO PREGUNTAS.` }] } }; const resText = await fetch( `https://generativelanguage.googleapis.com/v1beta/models/gemini-1.5-flash:generateContent?key=${key}`, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(payloadText), signal: controller.signal } ); clearTimeout(timeoutId); if (!resText.ok) throw new Error(`Gemini error: ${resText.status}`); const dataText = await resText.json(); const aiText = dataText.candidates?.[0]?.content?.parts?.[0]?.text || "Mmm... vale."; setText(`Kore: ${aiText}`); // 2. Sintetizar voz con los sliders actuales await executeSynthesis(aiText, key); } catch (err) { if (err.name === 'AbortError') { setErrorMsg('Gemini timeout (5s)'); } else { setErrorMsg(err.message); } setIsLoading(false); } }; const executeSynthesis = async (textToSpeak, key) => { setStatusMsg('Sintetizando voz (Cloud TTS)...'); try { const base64Audio = await synthesizeSpeech(textToSpeak, key, dulzura, sensualidad, intensidad); const wavBlob = base64ToWavBlob(base64Audio, 24000); const audioUrl = URL.createObjectURL(wavBlob); // Revocar URL anterior si existe if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } currentAudioUrlRef.current = audioUrl; activeAudioRef.current.src = audioUrl; activeAudioRef.current.onended = () => { setIsPlaying(false); setStatusMsg('Transmisión completada.'); if (isHandsFree) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; setStatusMsg('Transmitiendo...'); setIsPlaying(true); setIsLoading(false); await activeAudioRef.current.play().catch(err => { throw new Error(`Autoplay bloqueado: ${err.message}`); }); } catch (error) { throw new Error(`Fallo TTS: ${error.message}`); } }; const handleManualPlay = async () => { if (!text.trim()) return setErrorMsg('Escribe algo primero.'); // Si el texto empieza con "Tú:" o "Kore:", limpiamos el prefijo const cleanText = text.replace(/^(Tú:|Kore:)\s*/, ''); if (!cleanText.trim()) return setErrorMsg('Texto vacío después de limpiar.'); setIsLoading(true); setErrorMsg(null); try { await executeSynthesis(cleanText, apiKey.trim()); } catch (err) { setErrorMsg(err.message); setIsLoading(false); } }; const toggleHandsFree = () => { if (!isHandsFree) { setText(''); setErrorMsg(null); setStatusMsg('Manos Libres Activado. Habla...'); // Desbloquear audio en algunos navegadores if (activeAudioRef.current) { activeAudioRef.current.src = SILENT_WAV; activeAudioRef.current.play().catch(() => {}); } try { recognitionRef.current.start(); } catch (e) {} } else { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Sistemas en pausa.'); if (recognitionRef.current) recognitionRef.current.stop(); } setIsHandsFree(!isHandsFree); }; const stopAudio = () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Señal interrumpida.'); }; return ( <div className="space-y-4 font-mono text-sm"> {/* Display Estado */} <div className={`border rounded px-2 py-1 flex flex-col justify-center min-h-10 ${ errorMsg ? 'bg-red-950/50 border-red-900' : isHandsFree ? 'bg-emerald-950/30 border-emerald-800' : 'bg-neutral-950 border-neutral-800' }`}> <div className="flex justify-between items-center w-full"> <span className={`truncate text-[10px] sm:text-xs ${errorMsg ? 'text-red-500' : 'text-emerald-500'}`}> > {errorMsg || statusMsg} </span> {isPlaying && !errorMsg && <Activity size={14} className="text-emerald-500 animate-pulse ml-2 flex-shrink-0" />} {isLoading && !errorMsg && <Zap size={14} className="text-amber-500 animate-pulse ml-2 flex-shrink-0" />} {isHandsFree && !isPlaying && !isLoading && !errorMsg && <Mic size={14} className="text-red-500 animate-pulse ml-2 flex-shrink-0" />} </div> </div> {/* Input Texto / Log */} <textarea value={text} onChange={(e) => setText(e.target.value)} className="w-full bg-neutral-950/50 border border-neutral-700 rounded p-2 text-xs text-neutral-300 focus:outline-none focus:border-emerald-500 resize-none h-20" placeholder={isHandsFree ? "Escuchando transcripción en tiempo real..." : "Escribe texto directo o activa Manos Libres..."} readOnly={isHandsFree || isLoading} /> {/* Sliders continuos (controlan SSML en tiempo real) */} <div className="space-y-3 bg-neutral-950/30 p-3 rounded border border-neutral-800"> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Agresiva</span><span className="text-emerald-400">Dulzura [{dulzura}]</span><span>Dulce</span> </div> <input type="range" min="0" max="100" value={dulzura} onChange={(e)=>setDulzura(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-emerald-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Robótica</span><span className="text-pink-400">Aura [{sensualidad}]</span><span>Sensual</span> </div> <input type="range" min="0" max="100" value={sensualidad} onChange={(e)=>setSensualidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-pink-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Atenuada</span><span className="text-amber-400">Intensidad [{intensidad}]</span><span>Fuerte</span> </div> <input type="range" min="0" max="100" value={intensidad} onChange={(e)=>setIntensidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-amber-500 cursor-pointer" /> </div> </div> {/* Botones de Control */} <div className="flex flex-col sm:flex-row gap-2"> <button onClick={toggleHandsFree} disabled={isLoading} className={`flex-1 py-2 rounded text-xs font-bold flex items-center justify-center gap-2 transition-colors border ${ isHandsFree ? 'bg-red-900/20 text-red-400 border-red-900/50 hover:bg-red-900/40 shadow-[0_0_10px_rgba(239,68,68,0.2)]' : 'bg-indigo-900/20 text-indigo-400 border-indigo-900/50 hover:bg-indigo-900/40' }`} > {isHandsFree ? <MicOff size={14} /> : <Mic size={14} />} {isHandsFree ? 'Detener Escucha' : 'Manos Libres'} </button> <div className="flex gap-2 flex-1"> <button onClick={handleManualPlay} disabled={isLoading || isPlaying || isHandsFree} className="flex-1 bg-emerald-600/20 hover:bg-emerald-600/40 text-emerald-400 border border-emerald-600/50 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center gap-1 transition-colors" > {isLoading ? <Loader2 size={14} className="animate-spin" /> : <Play size={14} />} Sintetizar </button> <button onClick={stopAudio} disabled={!isPlaying && !isHandsFree} className="px-4 bg-neutral-800 hover:bg-neutral-700 text-neutral-400 border border-neutral-700 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center transition-colors" > <Square size={14} /> </button> </div> </div> {/* Botón para limpiar caché (opcional) */} <div className="text-right"> <button onClick={() => audioCache.clear()} className="text-[8px] text-neutral-600 hover:text-neutral-400 underline" > limpiar caché de audio </button> </div> </div> ); }; // --- ENTORNO ESCRITORIO (sin cambios) --- export default function App() { const [widgets, setWidgets] = useState({ voice: { isOpen: true, pos: { x: window.innerWidth > 768 ? window.innerWidth / 2 - 170 : 20, y: 40 } } }); const toggleWidget = (id) => { setWidgets(prev => ({ ...prev, [id]: { ...prev[id], isOpen: !prev[id].isOpen } })); }; return ( <div className="w-full h-screen bg-neutral-950 bg-[radial-gradient(ellipse_80%_80%_at_50%_-20%,rgba(16,185,129,0.1),rgba(0,0,0,1))] overflow-hidden relative font-sans text-neutral-200"> <div className="absolute inset-0 flex items-center justify-center opacity-[0.02] pointer-events-none"><Settings2 size={500} /></div> {widgets.voice.isOpen && ( <DraggableWidget title="MODULADOR VOCAL KORE" icon={Zap} initialPos={widgets.voice.pos} onClose={() => toggleWidget('voice')}> <VoiceModulatorWidget /> </DraggableWidget> )} <div className="absolute bottom-6 left-1/2 transform -translate-x-1/2 bg-neutral-900/80 backdrop-blur-md border border-neutral-700/50 p-2 rounded-2xl shadow-2xl flex gap-2 z-[100]"> <div className="px-3 flex items-center border-r border-neutral-700/50 text-neutral-500"><LayoutGrid size={20} /></div> <button onClick={() => toggleWidget('voice')} className={`px-4 py-2 rounded-xl flex items-center gap-2 text-sm font-medium transition-all ${
Judul Video: Saya Fairus Syah, Dari group 3, Accept 30 Days Challenge edisi Kali ni..LU TAK BERANI, LU BOLEH BALIK!! Durasi: Sekitar 1-2 menit (bisa disesuaikan) Musik Latar: Musik yang mendebarkan dan memacu adrenalin, lalu menjadi lebih epik dan menginspirasi setelah terjun. [0:00-0:15] Suasana Persiapan di Pesawat Visual: Fairus Syah (dengan perlengkapan terjun payung lengkap) duduk di dalam pesawat, terlihat sedikit tegang namun bersemangat. Cuplikan singkat teman-teman atau instruktur di sekitarnya yang memberikan semangat atau melakukan pemeriksaan akhir. Pemandangan awan atau daratan dari jendela pesawat yang semakin dekat. Close-up pada ekspresi Fairus yang menunjukkan antisipasi. Audio: Suara mesin pesawat yang menderu. Suara instruktur yang memberikan instruksi singkat (opsional, bisa hanya visual). Fairus mengambil napas dalam-dalam. [0:15-0:30] Momen di Ambang Pintu Pesawat Visual: Fairus Syah bergerak ke arah pintu pesawat yang terbuka. Angin kencang menerpa. Pemandangan luas di bawah yang menakjubkan (langit biru, awan, daratan). Instruktur di sampingnya memberikan isyarat terakhir. Fairus menoleh ke kamera dengan ekspresi tekad. Audio: Suara angin yang sangat kencang. Fairus Syah mengambil posisi di ambang pintu. [0:30-0:40] Seruan Fairus Syah & Terjun! Visual: Close-up wajah Fairus Syah. Ia menarik napas dalam-dalam, matanya penuh semangat. Fairus Syah melantangkan: "SAYA FAIRUS SYAH, DARI GROUP 3, ACCEPT 30 DAYS CHALLENGE EDISI KALI INI!" (Pastikan ekspresi dan suaranya penuh energi dan semangat!) Gerakan cepat: Ia langsung mendorong diri atau melompat keluar dari pesawat. Audio: Suara Fairus Syah yang lantang dan jelas. Suara dentuman saat ia melompat keluar. Musik latar yang mencapai klimaks. [0:40-1:15] Melayang di Udara (Freefall) Visual: Fairus Syah melayang bebas di udara, dengan posisi belly-to-earth yang stabil. Pemandangan spektakuler dari atas: awan di bawahnya, daratan yang membentang luas. Ekspresi Fairus yang penuh kebahagiaan, senyum lebar, dan mungkin teriakan kegembiraan (tanpa suara, hanya visual). Cuplikan dari berbagai sudut (jika memungkinkan, misalnya dari kamera di helm atau kamera yang dipegang instruktur). Ia mungkin melakukan sedikit gerakan atau pose di udara. Audio: Suara angin yang menderu kencang. Musik latar yang epik dan menginspirasi, membangun suasana kebebasan. [1:15-1:20] Momen Sebelum Payung Terbuka Visual: Close-up pada tangan Fairus yang bersiap menarik tali pembuka payung. Ekspresi fokus. (Opsional) Sedikit goyangan atau manuver singkat sebelum payung dibuka. Audio: Musik latar yang sedikit mereda, membangun ketegangan. [1:20-Akhir] Payung Terbuka & Pendaratan Visual: Payung terbuka dengan mulus. Gerakan melambat, Fairus mulai melayang dengan tenang di bawah payung. Pemandangan yang lebih tenang dan detail dari daratan saat ia mendekat. Pendaratan yang mulus. Fairus berdiri, melepas helm, dan tersenyum puas ke kamera. (Opsional) Teman-teman atau instruktur menyambutnya. Audio: Suara payung terbuka (whoosh). Suara angin yang lebih lembut. Musik latar yang tenang dan merayakan keberhasilan. Fairus mungkin mengucapkan sesuatu seperti "Berhasil!" atau "Luar biasa!" Tips Tambahan: Kualitas Kamera: Gunakan kamera aksi (GoPro atau sejenisnya) untuk hasil terbaik. Sudut Pengambilan: Manfaatkan beberapa sudut kamera jika memungkinkan (helm, tangan, instruktur). Ekspresi: Dorong Fairus untuk menunjukkan emosi yang kuat di setiap tahap. Penyuntingan: Pastikan transisi antar adegan mulus dan musik mendukung narasi visual. Semoga berhasil dengan videonya! Pasti akan sangat keren!
Prompt: Full-length, detailed, cinematic photography, high-definition, Wonder Woman glossy black hair, stern flirty starring expression with, strength detailed sword sharpness raised in dynamic fighting stance, craftsmanship armor. dark reds golds silver tones matte colors focus. Sunlight & shadow effects.::1 wet, illustration, drawing, cartoon, painting::-1 Full-length, detailed, cinematic photography, high-definition::1 --v 6.1 --style raw --ar 1:2 --s 1000 --p tu4jhwe --q 2 --iw 0.3 --sref --sw 25
spacecraft in action, star wars, in the style of olympus af-1 (aka olympus infinity), cinematic stills, light gray and blue, i can't believe how beautiful this is, fragmented planes, light gray and dark emerald, frostpunk, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, a spaceship riding into view at a distance, in the style of #vfxfriday, changelingcore, imax, close up, i can't believe how beautiful this is, light indigo and white, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, photo, digital art, science fiction:: --v 5.2
anime artwork long exposure photography, low angle, masterpiece photo of a young woman, Thin-legged body, a-cup breast, Cropped blouse, __aninme_clothes__, "Yare Yare" (casual, laid-back) Pose, Real-time Lighting Changes, Tilted architectural view, Olympus OM-1, in style of Anne Brigman . anime style, key visual, vibrant, studio anime, highly detailed
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
--purple-1: #6b2ac8; --purple-2: #7d28f9; --light-purple: #e1c9e3; --black-main: #1c1a1e; --glow-purple: #cb8ff0; --dark-purple: #3f1a76; --gray: #68666a; --soft-purple: #a282ab; --deep-bg: #3a274c; } 🎨 SCSS $purple-1: #6b2ac8; $purple-2: #7d28f9; $light-purple: #e1c9e3; $black-main: #1c1a1e; $glow-purple: #cb8ff0; $dark-purple: #3f1a76; $gray: #68666a; $soft-purple: #a282ab; $deep-bg: #3a274c; 🎨 SCSS (RGB) $purple-1: rgba(107,42,200,1); $purple-2: rgba(125,40,249,1); $light-purple: rgba(225,201,227,1); $black-main: rgba(28,26,30,1); $glow-purple: rgba(203,143,240,1); $dark-purple: rgba(63,26,118,1); $gray: rgba(104,102,106,1); $soft-purple: rgba(162,130,171,1); $deep-bg: rgba(58,39,76,1);
The image features a woman wearing a black shirt and black pants, walking down a street while carrying a white purse. The woman appears to be walking confidently and gracefully, possibly enjoying her time outdoors. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4.1-Llama2 prompt generator)
Feature of a creature inspired by Dobby in Hary Potter, a small, hairless creature with long, thin fingers and toes. He is wearing a brown robe and has large, pointed ears. His eyes are wide open, and he appears to be looking at something with curiosity or interest. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 1-Llama2 prompt generator)
Create a premium Amazon A+ content banner for a foldable 9-in-1 multifunction electrician wire stripping plier. Image concept: Multi-Functionality Efficiency Positioning — demonstrate how one compact foldable plier replaces multiple individual electrician tools such as wire stripper, cutter, crimper, splitter, gripper, wrench, and wire twisting tool. The image should communicate time-saving, reduced tool clutter, portability, and faster workflow efficiency for electricians and technicians. Place the actual plier product in a dynamic 3/4 diagonal angle, slightly floating, with the stainless-steel head facing forward and the green-black-grey handles visible. Product should dominate 90% of the visual. Show accurate product details: stripping holes, engraved numbers, 5mm and 10mm markings, M4 marking, winding module, crimping section, screws, rivets, cutting edge, foldable hinge, and ergonomic handles. No voltage testing, no tester light, no glowing handle. Use a premium radial + diagonal industrial gradient background: #0B0D0E — 60% deep industrial black #006B5A — 25% dark green glow #BFC3C4 — 15% brushed silver highlight optional transition #1F2A2A Background should feel like a high-end electrical workshop: dark industrial mood, subtle blurred circuit panel, technical haze, brushed silver light streaks, green glow behind the product, clean and premium. Use premium 3D / semi-3D function graphics, not basic icons. Place them in a curved orbit formation around the plier, with subtle metallic connector lines and glassmorphism circular badges. Each badge should represent one function: wire stripping, cutting, crimping, wire twisting, wire splitting, wrenching, gripping, and clamping. Icons should be metallic silver-white with subtle green glow, bevelled depth, and premium engineering finish. Text should be only 10% of the image. Main headline: ONE TOOL. FASTER WORK. Subtitle: Replaces Multiple Electrician Tools Small punch tags: Strip • Cut • Crimp • Twist Use bold modern sans-serif typography, white or brushed silver with subtle green glow. Keep text clean, readable, minimal, and premium. Final output style: photorealistic, ultra-sharp 8K resolution, premium industrial tool advertisement, crisp stainless-steel reflections, accurate product geometry, sharp engraved markings, realistic metal texture, high-end A+ content visual, product-focused, no clutter. Negative prompt: No gardening tool, no pruning shears, no plants, no red gardening cutter, no voltage tester, no tester light, no glowing handle, no generic flat icons, no cartoon vectors, no cheap clipart, no distorted plier, no missing holes, no wrong numbers, no extra handles, no blurry product, no messy layout, no unreadable text, no watermark, no logo.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
The image features a man riding a wave on a surfboard. he is skillfully navigating the wave, showcasing her surfing abilities. The man is wearing a wetsuit, which provides his with the necessary protection and flexibility while surfing. The surfboard he is riding is positioned in the center of the image, with the man standing on it and maintaining his balance as he enjoys the thrill of the wave. (controlnet_mode:canny sdxlYamersRealism2, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 2-Llama2 prompt)
The portrait image features a large, colorful lizard with a neck and a long tail. The lizard is on a tree branch, and its vibrant colors make it stand out against the dark background. The lizard's head is turned to the side, and it appears to be looking at the camera. The lizard's unique appearance and striking colors make it an interesting and eye-catching subject in the image. oversize picture, HRD, 12K, extremely details, Clip Skip: 1, ENSD -1, <lora:sharpening_B_1.1:(1>:1.5)> ,"sharp", "focused", "intricately detailed", "12k", "uhd", "hdr", lr (controlnet_mode:canny sdxlYamersRealism2, sdxl-1.0.0.9.safetensors, SeargeSDXL4.2-Llama2 prompt)
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
The image features a man riding a wave on a surfboard. he is skillfully navigating the wave, showcasing her surfing abilities. The man is wearing a wetsuit, which provides his with the necessary protection and flexibility while surfing. The surfboard he is riding is positioned in the center of the image, with the man standing on it and maintaining his balance as he enjoys the thrill of the wave. (controlnet_mode:canny sdxlYamersRealism2, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 2-Llama2 prompt)
anime artwork long exposure photography, low angle, masterpiece photo of a young woman, Thin-legged body, a-cup breast, Cropped blouse, __aninme_clothes__, "Yare Yare" (casual, laid-back) Pose, Real-time Lighting Changes, Tilted architectural view, Olympus OM-1, in style of Anne Brigman . anime style, key visual, vibrant, studio anime, highly detailed
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Judul Video: Saya Fairus Syah, Dari group 3, Accept 30 Days Challenge edisi Kali ni..LU TAK BERANI, LU BOLEH BALIK!! Durasi: Sekitar 1-2 menit (bisa disesuaikan) Musik Latar: Musik yang mendebarkan dan memacu adrenalin, lalu menjadi lebih epik dan menginspirasi setelah terjun. [0:00-0:15] Suasana Persiapan di Pesawat Visual: Fairus Syah (dengan perlengkapan terjun payung lengkap) duduk di dalam pesawat, terlihat sedikit tegang namun bersemangat. Cuplikan singkat teman-teman atau instruktur di sekitarnya yang memberikan semangat atau melakukan pemeriksaan akhir. Pemandangan awan atau daratan dari jendela pesawat yang semakin dekat. Close-up pada ekspresi Fairus yang menunjukkan antisipasi. Audio: Suara mesin pesawat yang menderu. Suara instruktur yang memberikan instruksi singkat (opsional, bisa hanya visual). Fairus mengambil napas dalam-dalam. [0:15-0:30] Momen di Ambang Pintu Pesawat Visual: Fairus Syah bergerak ke arah pintu pesawat yang terbuka. Angin kencang menerpa. Pemandangan luas di bawah yang menakjubkan (langit biru, awan, daratan). Instruktur di sampingnya memberikan isyarat terakhir. Fairus menoleh ke kamera dengan ekspresi tekad. Audio: Suara angin yang sangat kencang. Fairus Syah mengambil posisi di ambang pintu. [0:30-0:40] Seruan Fairus Syah & Terjun! Visual: Close-up wajah Fairus Syah. Ia menarik napas dalam-dalam, matanya penuh semangat. Fairus Syah melantangkan: "SAYA FAIRUS SYAH, DARI GROUP 3, ACCEPT 30 DAYS CHALLENGE EDISI KALI INI!" (Pastikan ekspresi dan suaranya penuh energi dan semangat!) Gerakan cepat: Ia langsung mendorong diri atau melompat keluar dari pesawat. Audio: Suara Fairus Syah yang lantang dan jelas. Suara dentuman saat ia melompat keluar. Musik latar yang mencapai klimaks. [0:40-1:15] Melayang di Udara (Freefall) Visual: Fairus Syah melayang bebas di udara, dengan posisi belly-to-earth yang stabil. Pemandangan spektakuler dari atas: awan di bawahnya, daratan yang membentang luas. Ekspresi Fairus yang penuh kebahagiaan, senyum lebar, dan mungkin teriakan kegembiraan (tanpa suara, hanya visual). Cuplikan dari berbagai sudut (jika memungkinkan, misalnya dari kamera di helm atau kamera yang dipegang instruktur). Ia mungkin melakukan sedikit gerakan atau pose di udara. Audio: Suara angin yang menderu kencang. Musik latar yang epik dan menginspirasi, membangun suasana kebebasan. [1:15-1:20] Momen Sebelum Payung Terbuka Visual: Close-up pada tangan Fairus yang bersiap menarik tali pembuka payung. Ekspresi fokus. (Opsional) Sedikit goyangan atau manuver singkat sebelum payung dibuka. Audio: Musik latar yang sedikit mereda, membangun ketegangan. [1:20-Akhir] Payung Terbuka & Pendaratan Visual: Payung terbuka dengan mulus. Gerakan melambat, Fairus mulai melayang dengan tenang di bawah payung. Pemandangan yang lebih tenang dan detail dari daratan saat ia mendekat. Pendaratan yang mulus. Fairus berdiri, melepas helm, dan tersenyum puas ke kamera. (Opsional) Teman-teman atau instruktur menyambutnya. Audio: Suara payung terbuka (whoosh). Suara angin yang lebih lembut. Musik latar yang tenang dan merayakan keberhasilan. Fairus mungkin mengucapkan sesuatu seperti "Berhasil!" atau "Luar biasa!" Tips Tambahan: Kualitas Kamera: Gunakan kamera aksi (GoPro atau sejenisnya) untuk hasil terbaik. Sudut Pengambilan: Manfaatkan beberapa sudut kamera jika memungkinkan (helm, tangan, instruktur). Ekspresi: Dorong Fairus untuk menunjukkan emosi yang kuat di setiap tahap. Penyuntingan: Pastikan transisi antar adegan mulus dan musik mendukung narasi visual. Semoga berhasil dengan videonya! Pasti akan sangat keren!
Prompt: Full-length, detailed, cinematic photography, high-definition, Wonder Woman glossy black hair, stern flirty starring expression with, strength detailed sword sharpness raised in dynamic fighting stance, craftsmanship armor. dark reds golds silver tones matte colors focus. Sunlight & shadow effects.::1 wet, illustration, drawing, cartoon, painting::-1 Full-length, detailed, cinematic photography, high-definition::1 --v 6.1 --style raw --ar 1:2 --s 1000 --p tu4jhwe --q 2 --iw 0.3 --sref --sw 25
Create a premium Amazon A+ content banner for a foldable 9-in-1 multifunction electrician wire stripping plier. Image concept: Multi-Functionality Efficiency Positioning — demonstrate how one compact foldable plier replaces multiple individual electrician tools such as wire stripper, cutter, crimper, splitter, gripper, wrench, and wire twisting tool. The image should communicate time-saving, reduced tool clutter, portability, and faster workflow efficiency for electricians and technicians. Place the actual plier product in a dynamic 3/4 diagonal angle, slightly floating, with the stainless-steel head facing forward and the green-black-grey handles visible. Product should dominate 90% of the visual. Show accurate product details: stripping holes, engraved numbers, 5mm and 10mm markings, M4 marking, winding module, crimping section, screws, rivets, cutting edge, foldable hinge, and ergonomic handles. No voltage testing, no tester light, no glowing handle. Use a premium radial + diagonal industrial gradient background: #0B0D0E — 60% deep industrial black #006B5A — 25% dark green glow #BFC3C4 — 15% brushed silver highlight optional transition #1F2A2A Background should feel like a high-end electrical workshop: dark industrial mood, subtle blurred circuit panel, technical haze, brushed silver light streaks, green glow behind the product, clean and premium. Use premium 3D / semi-3D function graphics, not basic icons. Place them in a curved orbit formation around the plier, with subtle metallic connector lines and glassmorphism circular badges. Each badge should represent one function: wire stripping, cutting, crimping, wire twisting, wire splitting, wrenching, gripping, and clamping. Icons should be metallic silver-white with subtle green glow, bevelled depth, and premium engineering finish. Text should be only 10% of the image. Main headline: ONE TOOL. FASTER WORK. Subtitle: Replaces Multiple Electrician Tools Small punch tags: Strip • Cut • Crimp • Twist Use bold modern sans-serif typography, white or brushed silver with subtle green glow. Keep text clean, readable, minimal, and premium. Final output style: photorealistic, ultra-sharp 8K resolution, premium industrial tool advertisement, crisp stainless-steel reflections, accurate product geometry, sharp engraved markings, realistic metal texture, high-end A+ content visual, product-focused, no clutter. Negative prompt: No gardening tool, no pruning shears, no plants, no red gardening cutter, no voltage tester, no tester light, no glowing handle, no generic flat icons, no cartoon vectors, no cheap clipart, no distorted plier, no missing holes, no wrong numbers, no extra handles, no blurry product, no messy layout, no unreadable text, no watermark, no logo.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
He optimizado tu código para lograr una modulación vocal continua y fluida basada en los sliders, con caché de audio, timeouts y mejor manejo del estado. Ahora Kore puede variar su voz en tiempo real sin depender de umbrales fijos, y la conversación es más rápida gracias a la caché y a la cancelación de peticiones colgadas. ```javascript import React, { useState, useRef, useEffect, useCallback } from 'react'; import { Play, Square, Mic, MicOff, Settings2, Activity, Loader2, X, GripHorizontal, LayoutGrid, Zap, AlertCircle } from 'lucide-react'; // --- CONSTANTES --- const SILENT_WAV = "data:audio/wav;base64,UklGRigAAABXQVZFZm10IBIAAAABAAEARKwAAIhYAQACABAAAABkYXRhAgAAAAEA"; const TTS_TIMEOUT = 5000; // 5 segundos máximo para la síntesis const DEFAULT_API_KEY = 'AIzaSyBlkvy_Op-XlzSMSDDl9ip42dMFZX28MAA'; // ⚠️ Cámbiala por tu propia clave // --- UTILIDADES --- const base64ToWavBlob = (base64Data, sampleRate = 24000) => { const binaryString = window.atob(base64Data); const pcmData = new Uint8Array(binaryString.length); for (let i = 0; i < binaryString.length; i++) pcmData[i] = binaryString.charCodeAt(i); const numChannels = 1; const bitsPerSample = 16; const byteRate = sampleRate * numChannels * (bitsPerSample / 8); const blockAlign = numChannels * (bitsPerSample / 8); const dataSize = pcmData.length; const buffer = new ArrayBuffer(44 + dataSize); const view = new DataView(buffer); const writeString = (view, offset, string) => { for (let i = 0; i < string.length; i++) view.setUint8(offset + i, string.charCodeAt(i)); }; writeString(view, 0, 'RIFF'); view.setUint32(4, 36 + dataSize, true); writeString(view, 8, 'WAVE'); writeString(view, 12, 'fmt '); view.setUint32(16, 16, true); view.setUint16(20, 1, true); view.setUint16(22, numChannels, true); view.setUint32(24, sampleRate, true); view.setUint32(28, byteRate, true); view.setUint16(32, blockAlign, true); view.setUint16(34, bitsPerSample, true); writeString(view, 36, 'data'); view.setUint32(40, dataSize, true); for (let i = 0; i < dataSize; i++) view.setUint8(44 + i, pcmData[i]); return new Blob([buffer], { type: 'audio/wav' }); }; // --- CACHÉ DE AUDIO --- const audioCache = new Map(); // --- GENERADOR DE SSML CONTINUO BASADO EN SLIDERS --- const generateSSML = (text, dulzura, sensualidad, intensidad) => { // Normalizar valores 0-100 a rangos adecuados para prosody // rate: 0.5 a 2.0 (1.0 es normal) const rate = 0.8 + (intensidad / 100) * 1.2; // 0.8 (lento) a 2.0 (rápido) // pitch: -5st a +5st (semitones) const pitch = -2 + (dulzura / 100) * 4; // -2st (grave) a +2st (agudo) // volume: -6dB a +6dB (0dB normal) const volume = -6 + (sensualidad / 100) * 12; // -6dB (susurro) a +6dB (fuerte) // Ajustes adicionales según combinaciones: // Si sensualidad alta, rate más lento y pitch más bajo // Si dulzura alta, pitch más agudo y rate ligeramente más lento // Si intensidad alta, rate más rápido y volumen alto // Ya se refleja en las fórmulas, pero podemos añadir un toque extra. const ssml = `<speak> <prosody rate="${rate.toFixed(2)}" pitch="${pitch.toFixed(0)}st" volume="${volume.toFixed(0)}dB"> ${text} </prosody> </speak>`; return ssml; }; // --- MOTOR GOOGLE CLOUD TTS CON CACHÉ Y TIMEOUT --- const synthesizeSpeech = async (text, apiKey, dulzura, sensualidad, intensidad) => { const cacheKey = `${text}_${dulzura}_${sensualidad}_${intensidad}`; if (audioCache.has(cacheKey)) { console.log('🎯 Usando audio cacheado'); return audioCache.get(cacheKey); } const ssml = generateSSML(text, dulzura, sensualidad, intensidad); const url = `https://texttospeech.googleapis.com/v1/text:synthesize?key=${apiKey}`; const body = { input: { ssml }, voice: { languageCode: 'es-ES', name: 'es-ES-Neural2-F', ssmlGender: 'FEMALE' }, audioConfig: { audioEncoding: 'LINEAR16', sampleRateHertz: 24000 } }; const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), TTS_TIMEOUT); try { const res = await fetch(url, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(body), signal: controller.signal }); clearTimeout(timeoutId); if (!res.ok) throw new Error(`TTS error: ${res.status}`); const data = await res.json(); audioCache.set(cacheKey, data.audioContent); return data.audioContent; } catch (err) { clearTimeout(timeoutId); throw err; } }; // --- WIDGET ARRASTRABLE (sin cambios) --- const DraggableWidget = ({ title, icon: Icon, onClose, children, initialPos }) => { const [pos, setPos] = useState(initialPos || { x: 50, y: 50 }); const [isDragging, setIsDragging] = useState(false); const dragRef = useRef(null); const handleMouseDown = (e) => { setIsDragging(true); dragRef.current = { startX: e.clientX, startY: e.clientY, initialX: pos.x, initialY: pos.y }; }; const handleMouseMove = (e) => { if (!isDragging) return; setPos({ x: Math.max(0, dragRef.current.initialX + (e.clientX - dragRef.current.startX)), y: Math.max(0, dragRef.current.initialY + (e.clientY - dragRef.current.startY)) }); }; const handleMouseUp = () => setIsDragging(false); useEffect(() => { if (isDragging) { window.addEventListener('mousemove', handleMouseMove); window.addEventListener('mouseup', handleMouseUp); } return () => { window.removeEventListener('mousemove', handleMouseMove); window.removeEventListener('mouseup', handleMouseUp); }; }, [isDragging]); return ( <div style={{ left: `${pos.x}px`, top: `${pos.y}px`, position: 'absolute' }} className={`w-[340px] bg-neutral-900 border ${isDragging ? 'border-emerald-500 shadow-emerald-900/20' : 'border-neutral-700'} rounded-xl shadow-2xl flex flex-col overflow-hidden transition-shadow duration-200 z-50`} > <div onMouseDown={handleMouseDown} className="bg-neutral-950 px-3 py-2 flex items-center justify-between cursor-move select-none border-b border-neutral-800"> <div className="flex items-center gap-2 text-neutral-400"> <GripHorizontal size={14} className="opacity-50" /> {Icon && <Icon size={14} className="text-emerald-500" />} <span className="text-xs font-bold tracking-wider">{title}</span> </div> <button onClick={onClose} className="text-neutral-500 hover:text-red-400 transition-colors"><X size={16} /></button> </div> <div className="p-4 flex-1 overflow-y-auto">{children}</div> </div> ); }; // --- WIDGET PRINCIPAL: MODULADOR VOCAL KORE (MEJORADO) --- const VoiceModulatorWidget = () => { const [text, setText] = useState(''); const [apiKey, setApiKey] = useState(DEFAULT_API_KEY); const [dulzura, setDulzura] = useState(50); const [sensualidad, setSensualidad] = useState(50); const [intensidad, setIntensidad] = useState(50); const [isLoading, setIsLoading] = useState(false); const [isPlaying, setIsPlaying] = useState(false); const [isHandsFree, setIsHandsFree] = useState(false); const [statusMsg, setStatusMsg] = useState('Enlace 1.5 Flash + GCP TTS Establecido.'); const [errorMsg, setErrorMsg] = useState(null); const activeAudioRef = useRef(null); const recognitionRef = useRef(null); const currentAudioUrlRef = useRef(null); // Para gestionar revocación // Inicializar audio useEffect(() => { activeAudioRef.current = new Audio(); activeAudioRef.current.preload = "auto"; return () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } } if (recognitionRef.current) recognitionRef.current.stop(); }; }, []); // Configurar reconocimiento de voz useEffect(() => { if (!('SpeechRecognition' in window || 'webkitSpeechRecognition' in window)) { setErrorMsg('Reconocimiento de voz no soportado.'); return; } const SpeechRecognition = window.SpeechRecognition || window.webkitSpeechRecognition; recognitionRef.current = new SpeechRecognition(); recognitionRef.current.lang = 'es-ES'; recognitionRef.current.interimResults = false; recognitionRef.current.continuous = false; recognitionRef.current.onresult = async (event) => { const transcript = event.results[0][0].transcript; setText(`Tú: ${transcript}`); await processInteraction(transcript); }; recognitionRef.current.onerror = (event) => { if (event.error !== 'no-speech') { setErrorMsg(`Micrófono: ${event.error}`); setIsHandsFree(false); } }; recognitionRef.current.onend = () => { if (isHandsFree && !isPlaying && !isLoading) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; // Limpiar al desmontar return () => { if (recognitionRef.current) recognitionRef.current.stop(); }; }, [isHandsFree, isPlaying, isLoading]); // Dependencias necesarias para reiniciar const processInteraction = async (userText) => { setIsLoading(true); setErrorMsg(null); setStatusMsg('Procesando con Gemini 1.5 Flash...'); const key = apiKey.trim(); try { // 1. Llamada a Gemini con timeout const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), 5000); const payloadText = { contents: [{ parts: [{ text: userText }] }], systemInstruction: { parts: [{ text: `Eres Kore, 28 años, Huesca. Labia, directa, sensual, disruptiva. Responde en español, máx 20 palabras. REGLA INNEGOCIABLE: CERO PREGUNTAS.` }] } }; const resText = await fetch( `https://generativelanguage.googleapis.com/v1beta/models/gemini-1.5-flash:generateContent?key=${key}`, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(payloadText), signal: controller.signal } ); clearTimeout(timeoutId); if (!resText.ok) throw new Error(`Gemini error: ${resText.status}`); const dataText = await resText.json(); const aiText = dataText.candidates?.[0]?.content?.parts?.[0]?.text || "Mmm... vale."; setText(`Kore: ${aiText}`); // 2. Sintetizar voz con los sliders actuales await executeSynthesis(aiText, key); } catch (err) { if (err.name === 'AbortError') { setErrorMsg('Gemini timeout (5s)'); } else { setErrorMsg(err.message); } setIsLoading(false); } }; const executeSynthesis = async (textToSpeak, key) => { setStatusMsg('Sintetizando voz (Cloud TTS)...'); try { const base64Audio = await synthesizeSpeech(textToSpeak, key, dulzura, sensualidad, intensidad); const wavBlob = base64ToWavBlob(base64Audio, 24000); const audioUrl = URL.createObjectURL(wavBlob); // Revocar URL anterior si existe if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } currentAudioUrlRef.current = audioUrl; activeAudioRef.current.src = audioUrl; activeAudioRef.current.onended = () => { setIsPlaying(false); setStatusMsg('Transmisión completada.'); if (isHandsFree) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; setStatusMsg('Transmitiendo...'); setIsPlaying(true); setIsLoading(false); await activeAudioRef.current.play().catch(err => { throw new Error(`Autoplay bloqueado: ${err.message}`); }); } catch (error) { throw new Error(`Fallo TTS: ${error.message}`); } }; const handleManualPlay = async () => { if (!text.trim()) return setErrorMsg('Escribe algo primero.'); // Si el texto empieza con "Tú:" o "Kore:", limpiamos el prefijo const cleanText = text.replace(/^(Tú:|Kore:)\s*/, ''); if (!cleanText.trim()) return setErrorMsg('Texto vacío después de limpiar.'); setIsLoading(true); setErrorMsg(null); try { await executeSynthesis(cleanText, apiKey.trim()); } catch (err) { setErrorMsg(err.message); setIsLoading(false); } }; const toggleHandsFree = () => { if (!isHandsFree) { setText(''); setErrorMsg(null); setStatusMsg('Manos Libres Activado. Habla...'); // Desbloquear audio en algunos navegadores if (activeAudioRef.current) { activeAudioRef.current.src = SILENT_WAV; activeAudioRef.current.play().catch(() => {}); } try { recognitionRef.current.start(); } catch (e) {} } else { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Sistemas en pausa.'); if (recognitionRef.current) recognitionRef.current.stop(); } setIsHandsFree(!isHandsFree); }; const stopAudio = () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Señal interrumpida.'); }; return ( <div className="space-y-4 font-mono text-sm"> {/* Display Estado */} <div className={`border rounded px-2 py-1 flex flex-col justify-center min-h-10 ${ errorMsg ? 'bg-red-950/50 border-red-900' : isHandsFree ? 'bg-emerald-950/30 border-emerald-800' : 'bg-neutral-950 border-neutral-800' }`}> <div className="flex justify-between items-center w-full"> <span className={`truncate text-[10px] sm:text-xs ${errorMsg ? 'text-red-500' : 'text-emerald-500'}`}> > {errorMsg || statusMsg} </span> {isPlaying && !errorMsg && <Activity size={14} className="text-emerald-500 animate-pulse ml-2 flex-shrink-0" />} {isLoading && !errorMsg && <Zap size={14} className="text-amber-500 animate-pulse ml-2 flex-shrink-0" />} {isHandsFree && !isPlaying && !isLoading && !errorMsg && <Mic size={14} className="text-red-500 animate-pulse ml-2 flex-shrink-0" />} </div> </div> {/* Input Texto / Log */} <textarea value={text} onChange={(e) => setText(e.target.value)} className="w-full bg-neutral-950/50 border border-neutral-700 rounded p-2 text-xs text-neutral-300 focus:outline-none focus:border-emerald-500 resize-none h-20" placeholder={isHandsFree ? "Escuchando transcripción en tiempo real..." : "Escribe texto directo o activa Manos Libres..."} readOnly={isHandsFree || isLoading} /> {/* Sliders continuos (controlan SSML en tiempo real) */} <div className="space-y-3 bg-neutral-950/30 p-3 rounded border border-neutral-800"> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Agresiva</span><span className="text-emerald-400">Dulzura [{dulzura}]</span><span>Dulce</span> </div> <input type="range" min="0" max="100" value={dulzura} onChange={(e)=>setDulzura(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-emerald-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Robótica</span><span className="text-pink-400">Aura [{sensualidad}]</span><span>Sensual</span> </div> <input type="range" min="0" max="100" value={sensualidad} onChange={(e)=>setSensualidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-pink-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Atenuada</span><span className="text-amber-400">Intensidad [{intensidad}]</span><span>Fuerte</span> </div> <input type="range" min="0" max="100" value={intensidad} onChange={(e)=>setIntensidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-amber-500 cursor-pointer" /> </div> </div> {/* Botones de Control */} <div className="flex flex-col sm:flex-row gap-2"> <button onClick={toggleHandsFree} disabled={isLoading} className={`flex-1 py-2 rounded text-xs font-bold flex items-center justify-center gap-2 transition-colors border ${ isHandsFree ? 'bg-red-900/20 text-red-400 border-red-900/50 hover:bg-red-900/40 shadow-[0_0_10px_rgba(239,68,68,0.2)]' : 'bg-indigo-900/20 text-indigo-400 border-indigo-900/50 hover:bg-indigo-900/40' }`} > {isHandsFree ? <MicOff size={14} /> : <Mic size={14} />} {isHandsFree ? 'Detener Escucha' : 'Manos Libres'} </button> <div className="flex gap-2 flex-1"> <button onClick={handleManualPlay} disabled={isLoading || isPlaying || isHandsFree} className="flex-1 bg-emerald-600/20 hover:bg-emerald-600/40 text-emerald-400 border border-emerald-600/50 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center gap-1 transition-colors" > {isLoading ? <Loader2 size={14} className="animate-spin" /> : <Play size={14} />} Sintetizar </button> <button onClick={stopAudio} disabled={!isPlaying && !isHandsFree} className="px-4 bg-neutral-800 hover:bg-neutral-700 text-neutral-400 border border-neutral-700 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center transition-colors" > <Square size={14} /> </button> </div> </div> {/* Botón para limpiar caché (opcional) */} <div className="text-right"> <button onClick={() => audioCache.clear()} className="text-[8px] text-neutral-600 hover:text-neutral-400 underline" > limpiar caché de audio </button> </div> </div> ); }; // --- ENTORNO ESCRITORIO (sin cambios) --- export default function App() { const [widgets, setWidgets] = useState({ voice: { isOpen: true, pos: { x: window.innerWidth > 768 ? window.innerWidth / 2 - 170 : 20, y: 40 } } }); const toggleWidget = (id) => { setWidgets(prev => ({ ...prev, [id]: { ...prev[id], isOpen: !prev[id].isOpen } })); }; return ( <div className="w-full h-screen bg-neutral-950 bg-[radial-gradient(ellipse_80%_80%_at_50%_-20%,rgba(16,185,129,0.1),rgba(0,0,0,1))] overflow-hidden relative font-sans text-neutral-200"> <div className="absolute inset-0 flex items-center justify-center opacity-[0.02] pointer-events-none"><Settings2 size={500} /></div> {widgets.voice.isOpen && ( <DraggableWidget title="MODULADOR VOCAL KORE" icon={Zap} initialPos={widgets.voice.pos} onClose={() => toggleWidget('voice')}> <VoiceModulatorWidget /> </DraggableWidget> )} <div className="absolute bottom-6 left-1/2 transform -translate-x-1/2 bg-neutral-900/80 backdrop-blur-md border border-neutral-700/50 p-2 rounded-2xl shadow-2xl flex gap-2 z-[100]"> <div className="px-3 flex items-center border-r border-neutral-700/50 text-neutral-500"><LayoutGrid size={20} /></div> <button onClick={() => toggleWidget('voice')} className={`px-4 py-2 rounded-xl flex items-center gap-2 text-sm font-medium transition-all ${
spacecraft in action, star wars, in the style of olympus af-1 (aka olympus infinity), cinematic stills, light gray and blue, i can't believe how beautiful this is, fragmented planes, light gray and dark emerald, frostpunk, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, a spaceship riding into view at a distance, in the style of #vfxfriday, changelingcore, imax, close up, i can't believe how beautiful this is, light indigo and white, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, photo, digital art, science fiction:: --v 5.2
Feature of a creature inspired by Dobby in Hary Potter, a small, hairless creature with long, thin fingers and toes. He is wearing a brown robe and has large, pointed ears. His eyes are wide open, and he appears to be looking at something with curiosity or interest. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 1-Llama2 prompt generator)
The portrait image features a large, colorful lizard with a neck and a long tail. The lizard is on a tree branch, and its vibrant colors make it stand out against the dark background. The lizard's head is turned to the side, and it appears to be looking at the camera. The lizard's unique appearance and striking colors make it an interesting and eye-catching subject in the image. oversize picture, HRD, 12K, extremely details, Clip Skip: 1, ENSD -1, <lora:sharpening_B_1.1:(1>:1.5)> ,"sharp", "focused", "intricately detailed", "12k", "uhd", "hdr", lr (controlnet_mode:canny sdxlYamersRealism2, sdxl-1.0.0.9.safetensors, SeargeSDXL4.2-Llama2 prompt)
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
--purple-1: #6b2ac8; --purple-2: #7d28f9; --light-purple: #e1c9e3; --black-main: #1c1a1e; --glow-purple: #cb8ff0; --dark-purple: #3f1a76; --gray: #68666a; --soft-purple: #a282ab; --deep-bg: #3a274c; } 🎨 SCSS $purple-1: #6b2ac8; $purple-2: #7d28f9; $light-purple: #e1c9e3; $black-main: #1c1a1e; $glow-purple: #cb8ff0; $dark-purple: #3f1a76; $gray: #68666a; $soft-purple: #a282ab; $deep-bg: #3a274c; 🎨 SCSS (RGB) $purple-1: rgba(107,42,200,1); $purple-2: rgba(125,40,249,1); $light-purple: rgba(225,201,227,1); $black-main: rgba(28,26,30,1); $glow-purple: rgba(203,143,240,1); $dark-purple: rgba(63,26,118,1); $gray: rgba(104,102,106,1); $soft-purple: rgba(162,130,171,1); $deep-bg: rgba(58,39,76,1);
The image features a woman wearing a black shirt and black pants, walking down a street while carrying a white purse. The woman appears to be walking confidently and gracefully, possibly enjoying her time outdoors. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4.1-Llama2 prompt generator)
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
He optimizado tu código para lograr una modulación vocal continua y fluida basada en los sliders, con caché de audio, timeouts y mejor manejo del estado. Ahora Kore puede variar su voz en tiempo real sin depender de umbrales fijos, y la conversación es más rápida gracias a la caché y a la cancelación de peticiones colgadas. ```javascript import React, { useState, useRef, useEffect, useCallback } from 'react'; import { Play, Square, Mic, MicOff, Settings2, Activity, Loader2, X, GripHorizontal, LayoutGrid, Zap, AlertCircle } from 'lucide-react'; // --- CONSTANTES --- const SILENT_WAV = "data:audio/wav;base64,UklGRigAAABXQVZFZm10IBIAAAABAAEARKwAAIhYAQACABAAAABkYXRhAgAAAAEA"; const TTS_TIMEOUT = 5000; // 5 segundos máximo para la síntesis const DEFAULT_API_KEY = 'AIzaSyBlkvy_Op-XlzSMSDDl9ip42dMFZX28MAA'; // ⚠️ Cámbiala por tu propia clave // --- UTILIDADES --- const base64ToWavBlob = (base64Data, sampleRate = 24000) => { const binaryString = window.atob(base64Data); const pcmData = new Uint8Array(binaryString.length); for (let i = 0; i < binaryString.length; i++) pcmData[i] = binaryString.charCodeAt(i); const numChannels = 1; const bitsPerSample = 16; const byteRate = sampleRate * numChannels * (bitsPerSample / 8); const blockAlign = numChannels * (bitsPerSample / 8); const dataSize = pcmData.length; const buffer = new ArrayBuffer(44 + dataSize); const view = new DataView(buffer); const writeString = (view, offset, string) => { for (let i = 0; i < string.length; i++) view.setUint8(offset + i, string.charCodeAt(i)); }; writeString(view, 0, 'RIFF'); view.setUint32(4, 36 + dataSize, true); writeString(view, 8, 'WAVE'); writeString(view, 12, 'fmt '); view.setUint32(16, 16, true); view.setUint16(20, 1, true); view.setUint16(22, numChannels, true); view.setUint32(24, sampleRate, true); view.setUint32(28, byteRate, true); view.setUint16(32, blockAlign, true); view.setUint16(34, bitsPerSample, true); writeString(view, 36, 'data'); view.setUint32(40, dataSize, true); for (let i = 0; i < dataSize; i++) view.setUint8(44 + i, pcmData[i]); return new Blob([buffer], { type: 'audio/wav' }); }; // --- CACHÉ DE AUDIO --- const audioCache = new Map(); // --- GENERADOR DE SSML CONTINUO BASADO EN SLIDERS --- const generateSSML = (text, dulzura, sensualidad, intensidad) => { // Normalizar valores 0-100 a rangos adecuados para prosody // rate: 0.5 a 2.0 (1.0 es normal) const rate = 0.8 + (intensidad / 100) * 1.2; // 0.8 (lento) a 2.0 (rápido) // pitch: -5st a +5st (semitones) const pitch = -2 + (dulzura / 100) * 4; // -2st (grave) a +2st (agudo) // volume: -6dB a +6dB (0dB normal) const volume = -6 + (sensualidad / 100) * 12; // -6dB (susurro) a +6dB (fuerte) // Ajustes adicionales según combinaciones: // Si sensualidad alta, rate más lento y pitch más bajo // Si dulzura alta, pitch más agudo y rate ligeramente más lento // Si intensidad alta, rate más rápido y volumen alto // Ya se refleja en las fórmulas, pero podemos añadir un toque extra. const ssml = `<speak> <prosody rate="${rate.toFixed(2)}" pitch="${pitch.toFixed(0)}st" volume="${volume.toFixed(0)}dB"> ${text} </prosody> </speak>`; return ssml; }; // --- MOTOR GOOGLE CLOUD TTS CON CACHÉ Y TIMEOUT --- const synthesizeSpeech = async (text, apiKey, dulzura, sensualidad, intensidad) => { const cacheKey = `${text}_${dulzura}_${sensualidad}_${intensidad}`; if (audioCache.has(cacheKey)) { console.log('🎯 Usando audio cacheado'); return audioCache.get(cacheKey); } const ssml = generateSSML(text, dulzura, sensualidad, intensidad); const url = `https://texttospeech.googleapis.com/v1/text:synthesize?key=${apiKey}`; const body = { input: { ssml }, voice: { languageCode: 'es-ES', name: 'es-ES-Neural2-F', ssmlGender: 'FEMALE' }, audioConfig: { audioEncoding: 'LINEAR16', sampleRateHertz: 24000 } }; const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), TTS_TIMEOUT); try { const res = await fetch(url, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(body), signal: controller.signal }); clearTimeout(timeoutId); if (!res.ok) throw new Error(`TTS error: ${res.status}`); const data = await res.json(); audioCache.set(cacheKey, data.audioContent); return data.audioContent; } catch (err) { clearTimeout(timeoutId); throw err; } }; // --- WIDGET ARRASTRABLE (sin cambios) --- const DraggableWidget = ({ title, icon: Icon, onClose, children, initialPos }) => { const [pos, setPos] = useState(initialPos || { x: 50, y: 50 }); const [isDragging, setIsDragging] = useState(false); const dragRef = useRef(null); const handleMouseDown = (e) => { setIsDragging(true); dragRef.current = { startX: e.clientX, startY: e.clientY, initialX: pos.x, initialY: pos.y }; }; const handleMouseMove = (e) => { if (!isDragging) return; setPos({ x: Math.max(0, dragRef.current.initialX + (e.clientX - dragRef.current.startX)), y: Math.max(0, dragRef.current.initialY + (e.clientY - dragRef.current.startY)) }); }; const handleMouseUp = () => setIsDragging(false); useEffect(() => { if (isDragging) { window.addEventListener('mousemove', handleMouseMove); window.addEventListener('mouseup', handleMouseUp); } return () => { window.removeEventListener('mousemove', handleMouseMove); window.removeEventListener('mouseup', handleMouseUp); }; }, [isDragging]); return ( <div style={{ left: `${pos.x}px`, top: `${pos.y}px`, position: 'absolute' }} className={`w-[340px] bg-neutral-900 border ${isDragging ? 'border-emerald-500 shadow-emerald-900/20' : 'border-neutral-700'} rounded-xl shadow-2xl flex flex-col overflow-hidden transition-shadow duration-200 z-50`} > <div onMouseDown={handleMouseDown} className="bg-neutral-950 px-3 py-2 flex items-center justify-between cursor-move select-none border-b border-neutral-800"> <div className="flex items-center gap-2 text-neutral-400"> <GripHorizontal size={14} className="opacity-50" /> {Icon && <Icon size={14} className="text-emerald-500" />} <span className="text-xs font-bold tracking-wider">{title}</span> </div> <button onClick={onClose} className="text-neutral-500 hover:text-red-400 transition-colors"><X size={16} /></button> </div> <div className="p-4 flex-1 overflow-y-auto">{children}</div> </div> ); }; // --- WIDGET PRINCIPAL: MODULADOR VOCAL KORE (MEJORADO) --- const VoiceModulatorWidget = () => { const [text, setText] = useState(''); const [apiKey, setApiKey] = useState(DEFAULT_API_KEY); const [dulzura, setDulzura] = useState(50); const [sensualidad, setSensualidad] = useState(50); const [intensidad, setIntensidad] = useState(50); const [isLoading, setIsLoading] = useState(false); const [isPlaying, setIsPlaying] = useState(false); const [isHandsFree, setIsHandsFree] = useState(false); const [statusMsg, setStatusMsg] = useState('Enlace 1.5 Flash + GCP TTS Establecido.'); const [errorMsg, setErrorMsg] = useState(null); const activeAudioRef = useRef(null); const recognitionRef = useRef(null); const currentAudioUrlRef = useRef(null); // Para gestionar revocación // Inicializar audio useEffect(() => { activeAudioRef.current = new Audio(); activeAudioRef.current.preload = "auto"; return () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } } if (recognitionRef.current) recognitionRef.current.stop(); }; }, []); // Configurar reconocimiento de voz useEffect(() => { if (!('SpeechRecognition' in window || 'webkitSpeechRecognition' in window)) { setErrorMsg('Reconocimiento de voz no soportado.'); return; } const SpeechRecognition = window.SpeechRecognition || window.webkitSpeechRecognition; recognitionRef.current = new SpeechRecognition(); recognitionRef.current.lang = 'es-ES'; recognitionRef.current.interimResults = false; recognitionRef.current.continuous = false; recognitionRef.current.onresult = async (event) => { const transcript = event.results[0][0].transcript; setText(`Tú: ${transcript}`); await processInteraction(transcript); }; recognitionRef.current.onerror = (event) => { if (event.error !== 'no-speech') { setErrorMsg(`Micrófono: ${event.error}`); setIsHandsFree(false); } }; recognitionRef.current.onend = () => { if (isHandsFree && !isPlaying && !isLoading) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; // Limpiar al desmontar return () => { if (recognitionRef.current) recognitionRef.current.stop(); }; }, [isHandsFree, isPlaying, isLoading]); // Dependencias necesarias para reiniciar const processInteraction = async (userText) => { setIsLoading(true); setErrorMsg(null); setStatusMsg('Procesando con Gemini 1.5 Flash...'); const key = apiKey.trim(); try { // 1. Llamada a Gemini con timeout const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), 5000); const payloadText = { contents: [{ parts: [{ text: userText }] }], systemInstruction: { parts: [{ text: `Eres Kore, 28 años, Huesca. Labia, directa, sensual, disruptiva. Responde en español, máx 20 palabras. REGLA INNEGOCIABLE: CERO PREGUNTAS.` }] } }; const resText = await fetch( `https://generativelanguage.googleapis.com/v1beta/models/gemini-1.5-flash:generateContent?key=${key}`, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(payloadText), signal: controller.signal } ); clearTimeout(timeoutId); if (!resText.ok) throw new Error(`Gemini error: ${resText.status}`); const dataText = await resText.json(); const aiText = dataText.candidates?.[0]?.content?.parts?.[0]?.text || "Mmm... vale."; setText(`Kore: ${aiText}`); // 2. Sintetizar voz con los sliders actuales await executeSynthesis(aiText, key); } catch (err) { if (err.name === 'AbortError') { setErrorMsg('Gemini timeout (5s)'); } else { setErrorMsg(err.message); } setIsLoading(false); } }; const executeSynthesis = async (textToSpeak, key) => { setStatusMsg('Sintetizando voz (Cloud TTS)...'); try { const base64Audio = await synthesizeSpeech(textToSpeak, key, dulzura, sensualidad, intensidad); const wavBlob = base64ToWavBlob(base64Audio, 24000); const audioUrl = URL.createObjectURL(wavBlob); // Revocar URL anterior si existe if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } currentAudioUrlRef.current = audioUrl; activeAudioRef.current.src = audioUrl; activeAudioRef.current.onended = () => { setIsPlaying(false); setStatusMsg('Transmisión completada.'); if (isHandsFree) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; setStatusMsg('Transmitiendo...'); setIsPlaying(true); setIsLoading(false); await activeAudioRef.current.play().catch(err => { throw new Error(`Autoplay bloqueado: ${err.message}`); }); } catch (error) { throw new Error(`Fallo TTS: ${error.message}`); } }; const handleManualPlay = async () => { if (!text.trim()) return setErrorMsg('Escribe algo primero.'); // Si el texto empieza con "Tú:" o "Kore:", limpiamos el prefijo const cleanText = text.replace(/^(Tú:|Kore:)\s*/, ''); if (!cleanText.trim()) return setErrorMsg('Texto vacío después de limpiar.'); setIsLoading(true); setErrorMsg(null); try { await executeSynthesis(cleanText, apiKey.trim()); } catch (err) { setErrorMsg(err.message); setIsLoading(false); } }; const toggleHandsFree = () => { if (!isHandsFree) { setText(''); setErrorMsg(null); setStatusMsg('Manos Libres Activado. Habla...'); // Desbloquear audio en algunos navegadores if (activeAudioRef.current) { activeAudioRef.current.src = SILENT_WAV; activeAudioRef.current.play().catch(() => {}); } try { recognitionRef.current.start(); } catch (e) {} } else { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Sistemas en pausa.'); if (recognitionRef.current) recognitionRef.current.stop(); } setIsHandsFree(!isHandsFree); }; const stopAudio = () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Señal interrumpida.'); }; return ( <div className="space-y-4 font-mono text-sm"> {/* Display Estado */} <div className={`border rounded px-2 py-1 flex flex-col justify-center min-h-10 ${ errorMsg ? 'bg-red-950/50 border-red-900' : isHandsFree ? 'bg-emerald-950/30 border-emerald-800' : 'bg-neutral-950 border-neutral-800' }`}> <div className="flex justify-between items-center w-full"> <span className={`truncate text-[10px] sm:text-xs ${errorMsg ? 'text-red-500' : 'text-emerald-500'}`}> > {errorMsg || statusMsg} </span> {isPlaying && !errorMsg && <Activity size={14} className="text-emerald-500 animate-pulse ml-2 flex-shrink-0" />} {isLoading && !errorMsg && <Zap size={14} className="text-amber-500 animate-pulse ml-2 flex-shrink-0" />} {isHandsFree && !isPlaying && !isLoading && !errorMsg && <Mic size={14} className="text-red-500 animate-pulse ml-2 flex-shrink-0" />} </div> </div> {/* Input Texto / Log */} <textarea value={text} onChange={(e) => setText(e.target.value)} className="w-full bg-neutral-950/50 border border-neutral-700 rounded p-2 text-xs text-neutral-300 focus:outline-none focus:border-emerald-500 resize-none h-20" placeholder={isHandsFree ? "Escuchando transcripción en tiempo real..." : "Escribe texto directo o activa Manos Libres..."} readOnly={isHandsFree || isLoading} /> {/* Sliders continuos (controlan SSML en tiempo real) */} <div className="space-y-3 bg-neutral-950/30 p-3 rounded border border-neutral-800"> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Agresiva</span><span className="text-emerald-400">Dulzura [{dulzura}]</span><span>Dulce</span> </div> <input type="range" min="0" max="100" value={dulzura} onChange={(e)=>setDulzura(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-emerald-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Robótica</span><span className="text-pink-400">Aura [{sensualidad}]</span><span>Sensual</span> </div> <input type="range" min="0" max="100" value={sensualidad} onChange={(e)=>setSensualidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-pink-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Atenuada</span><span className="text-amber-400">Intensidad [{intensidad}]</span><span>Fuerte</span> </div> <input type="range" min="0" max="100" value={intensidad} onChange={(e)=>setIntensidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-amber-500 cursor-pointer" /> </div> </div> {/* Botones de Control */} <div className="flex flex-col sm:flex-row gap-2"> <button onClick={toggleHandsFree} disabled={isLoading} className={`flex-1 py-2 rounded text-xs font-bold flex items-center justify-center gap-2 transition-colors border ${ isHandsFree ? 'bg-red-900/20 text-red-400 border-red-900/50 hover:bg-red-900/40 shadow-[0_0_10px_rgba(239,68,68,0.2)]' : 'bg-indigo-900/20 text-indigo-400 border-indigo-900/50 hover:bg-indigo-900/40' }`} > {isHandsFree ? <MicOff size={14} /> : <Mic size={14} />} {isHandsFree ? 'Detener Escucha' : 'Manos Libres'} </button> <div className="flex gap-2 flex-1"> <button onClick={handleManualPlay} disabled={isLoading || isPlaying || isHandsFree} className="flex-1 bg-emerald-600/20 hover:bg-emerald-600/40 text-emerald-400 border border-emerald-600/50 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center gap-1 transition-colors" > {isLoading ? <Loader2 size={14} className="animate-spin" /> : <Play size={14} />} Sintetizar </button> <button onClick={stopAudio} disabled={!isPlaying && !isHandsFree} className="px-4 bg-neutral-800 hover:bg-neutral-700 text-neutral-400 border border-neutral-700 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center transition-colors" > <Square size={14} /> </button> </div> </div> {/* Botón para limpiar caché (opcional) */} <div className="text-right"> <button onClick={() => audioCache.clear()} className="text-[8px] text-neutral-600 hover:text-neutral-400 underline" > limpiar caché de audio </button> </div> </div> ); }; // --- ENTORNO ESCRITORIO (sin cambios) --- export default function App() { const [widgets, setWidgets] = useState({ voice: { isOpen: true, pos: { x: window.innerWidth > 768 ? window.innerWidth / 2 - 170 : 20, y: 40 } } }); const toggleWidget = (id) => { setWidgets(prev => ({ ...prev, [id]: { ...prev[id], isOpen: !prev[id].isOpen } })); }; return ( <div className="w-full h-screen bg-neutral-950 bg-[radial-gradient(ellipse_80%_80%_at_50%_-20%,rgba(16,185,129,0.1),rgba(0,0,0,1))] overflow-hidden relative font-sans text-neutral-200"> <div className="absolute inset-0 flex items-center justify-center opacity-[0.02] pointer-events-none"><Settings2 size={500} /></div> {widgets.voice.isOpen && ( <DraggableWidget title="MODULADOR VOCAL KORE" icon={Zap} initialPos={widgets.voice.pos} onClose={() => toggleWidget('voice')}> <VoiceModulatorWidget /> </DraggableWidget> )} <div className="absolute bottom-6 left-1/2 transform -translate-x-1/2 bg-neutral-900/80 backdrop-blur-md border border-neutral-700/50 p-2 rounded-2xl shadow-2xl flex gap-2 z-[100]"> <div className="px-3 flex items-center border-r border-neutral-700/50 text-neutral-500"><LayoutGrid size={20} /></div> <button onClick={() => toggleWidget('voice')} className={`px-4 py-2 rounded-xl flex items-center gap-2 text-sm font-medium transition-all ${
The portrait image features a large, colorful lizard with a neck and a long tail. The lizard is on a tree branch, and its vibrant colors make it stand out against the dark background. The lizard's head is turned to the side, and it appears to be looking at the camera. The lizard's unique appearance and striking colors make it an interesting and eye-catching subject in the image. oversize picture, HRD, 12K, extremely details, Clip Skip: 1, ENSD -1, <lora:sharpening_B_1.1:(1>:1.5)> ,"sharp", "focused", "intricately detailed", "12k", "uhd", "hdr", lr (controlnet_mode:canny sdxlYamersRealism2, sdxl-1.0.0.9.safetensors, SeargeSDXL4.2-Llama2 prompt)
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
--purple-1: #6b2ac8; --purple-2: #7d28f9; --light-purple: #e1c9e3; --black-main: #1c1a1e; --glow-purple: #cb8ff0; --dark-purple: #3f1a76; --gray: #68666a; --soft-purple: #a282ab; --deep-bg: #3a274c; } 🎨 SCSS $purple-1: #6b2ac8; $purple-2: #7d28f9; $light-purple: #e1c9e3; $black-main: #1c1a1e; $glow-purple: #cb8ff0; $dark-purple: #3f1a76; $gray: #68666a; $soft-purple: #a282ab; $deep-bg: #3a274c; 🎨 SCSS (RGB) $purple-1: rgba(107,42,200,1); $purple-2: rgba(125,40,249,1); $light-purple: rgba(225,201,227,1); $black-main: rgba(28,26,30,1); $glow-purple: rgba(203,143,240,1); $dark-purple: rgba(63,26,118,1); $gray: rgba(104,102,106,1); $soft-purple: rgba(162,130,171,1); $deep-bg: rgba(58,39,76,1);
Prompt: Full-length, detailed, cinematic photography, high-definition, Wonder Woman glossy black hair, stern flirty starring expression with, strength detailed sword sharpness raised in dynamic fighting stance, craftsmanship armor. dark reds golds silver tones matte colors focus. Sunlight & shadow effects.::1 wet, illustration, drawing, cartoon, painting::-1 Full-length, detailed, cinematic photography, high-definition::1 --v 6.1 --style raw --ar 1:2 --s 1000 --p tu4jhwe --q 2 --iw 0.3 --sref --sw 25
spacecraft in action, star wars, in the style of olympus af-1 (aka olympus infinity), cinematic stills, light gray and blue, i can't believe how beautiful this is, fragmented planes, light gray and dark emerald, frostpunk, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, a spaceship riding into view at a distance, in the style of #vfxfriday, changelingcore, imax, close up, i can't believe how beautiful this is, light indigo and white, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, photo, digital art, science fiction:: --v 5.2
Create a premium Amazon A+ content banner for a foldable 9-in-1 multifunction electrician wire stripping plier. Image concept: Multi-Functionality Efficiency Positioning — demonstrate how one compact foldable plier replaces multiple individual electrician tools such as wire stripper, cutter, crimper, splitter, gripper, wrench, and wire twisting tool. The image should communicate time-saving, reduced tool clutter, portability, and faster workflow efficiency for electricians and technicians. Place the actual plier product in a dynamic 3/4 diagonal angle, slightly floating, with the stainless-steel head facing forward and the green-black-grey handles visible. Product should dominate 90% of the visual. Show accurate product details: stripping holes, engraved numbers, 5mm and 10mm markings, M4 marking, winding module, crimping section, screws, rivets, cutting edge, foldable hinge, and ergonomic handles. No voltage testing, no tester light, no glowing handle. Use a premium radial + diagonal industrial gradient background: #0B0D0E — 60% deep industrial black #006B5A — 25% dark green glow #BFC3C4 — 15% brushed silver highlight optional transition #1F2A2A Background should feel like a high-end electrical workshop: dark industrial mood, subtle blurred circuit panel, technical haze, brushed silver light streaks, green glow behind the product, clean and premium. Use premium 3D / semi-3D function graphics, not basic icons. Place them in a curved orbit formation around the plier, with subtle metallic connector lines and glassmorphism circular badges. Each badge should represent one function: wire stripping, cutting, crimping, wire twisting, wire splitting, wrenching, gripping, and clamping. Icons should be metallic silver-white with subtle green glow, bevelled depth, and premium engineering finish. Text should be only 10% of the image. Main headline: ONE TOOL. FASTER WORK. Subtitle: Replaces Multiple Electrician Tools Small punch tags: Strip • Cut • Crimp • Twist Use bold modern sans-serif typography, white or brushed silver with subtle green glow. Keep text clean, readable, minimal, and premium. Final output style: photorealistic, ultra-sharp 8K resolution, premium industrial tool advertisement, crisp stainless-steel reflections, accurate product geometry, sharp engraved markings, realistic metal texture, high-end A+ content visual, product-focused, no clutter. Negative prompt: No gardening tool, no pruning shears, no plants, no red gardening cutter, no voltage tester, no tester light, no glowing handle, no generic flat icons, no cartoon vectors, no cheap clipart, no distorted plier, no missing holes, no wrong numbers, no extra handles, no blurry product, no messy layout, no unreadable text, no watermark, no logo.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
The image features a man riding a wave on a surfboard. he is skillfully navigating the wave, showcasing her surfing abilities. The man is wearing a wetsuit, which provides his with the necessary protection and flexibility while surfing. The surfboard he is riding is positioned in the center of the image, with the man standing on it and maintaining his balance as he enjoys the thrill of the wave. (controlnet_mode:canny sdxlYamersRealism2, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 2-Llama2 prompt)
anime artwork long exposure photography, low angle, masterpiece photo of a young woman, Thin-legged body, a-cup breast, Cropped blouse, __aninme_clothes__, "Yare Yare" (casual, laid-back) Pose, Real-time Lighting Changes, Tilted architectural view, Olympus OM-1, in style of Anne Brigman . anime style, key visual, vibrant, studio anime, highly detailed
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Judul Video: Saya Fairus Syah, Dari group 3, Accept 30 Days Challenge edisi Kali ni..LU TAK BERANI, LU BOLEH BALIK!! Durasi: Sekitar 1-2 menit (bisa disesuaikan) Musik Latar: Musik yang mendebarkan dan memacu adrenalin, lalu menjadi lebih epik dan menginspirasi setelah terjun. [0:00-0:15] Suasana Persiapan di Pesawat Visual: Fairus Syah (dengan perlengkapan terjun payung lengkap) duduk di dalam pesawat, terlihat sedikit tegang namun bersemangat. Cuplikan singkat teman-teman atau instruktur di sekitarnya yang memberikan semangat atau melakukan pemeriksaan akhir. Pemandangan awan atau daratan dari jendela pesawat yang semakin dekat. Close-up pada ekspresi Fairus yang menunjukkan antisipasi. Audio: Suara mesin pesawat yang menderu. Suara instruktur yang memberikan instruksi singkat (opsional, bisa hanya visual). Fairus mengambil napas dalam-dalam. [0:15-0:30] Momen di Ambang Pintu Pesawat Visual: Fairus Syah bergerak ke arah pintu pesawat yang terbuka. Angin kencang menerpa. Pemandangan luas di bawah yang menakjubkan (langit biru, awan, daratan). Instruktur di sampingnya memberikan isyarat terakhir. Fairus menoleh ke kamera dengan ekspresi tekad. Audio: Suara angin yang sangat kencang. Fairus Syah mengambil posisi di ambang pintu. [0:30-0:40] Seruan Fairus Syah & Terjun! Visual: Close-up wajah Fairus Syah. Ia menarik napas dalam-dalam, matanya penuh semangat. Fairus Syah melantangkan: "SAYA FAIRUS SYAH, DARI GROUP 3, ACCEPT 30 DAYS CHALLENGE EDISI KALI INI!" (Pastikan ekspresi dan suaranya penuh energi dan semangat!) Gerakan cepat: Ia langsung mendorong diri atau melompat keluar dari pesawat. Audio: Suara Fairus Syah yang lantang dan jelas. Suara dentuman saat ia melompat keluar. Musik latar yang mencapai klimaks. [0:40-1:15] Melayang di Udara (Freefall) Visual: Fairus Syah melayang bebas di udara, dengan posisi belly-to-earth yang stabil. Pemandangan spektakuler dari atas: awan di bawahnya, daratan yang membentang luas. Ekspresi Fairus yang penuh kebahagiaan, senyum lebar, dan mungkin teriakan kegembiraan (tanpa suara, hanya visual). Cuplikan dari berbagai sudut (jika memungkinkan, misalnya dari kamera di helm atau kamera yang dipegang instruktur). Ia mungkin melakukan sedikit gerakan atau pose di udara. Audio: Suara angin yang menderu kencang. Musik latar yang epik dan menginspirasi, membangun suasana kebebasan. [1:15-1:20] Momen Sebelum Payung Terbuka Visual: Close-up pada tangan Fairus yang bersiap menarik tali pembuka payung. Ekspresi fokus. (Opsional) Sedikit goyangan atau manuver singkat sebelum payung dibuka. Audio: Musik latar yang sedikit mereda, membangun ketegangan. [1:20-Akhir] Payung Terbuka & Pendaratan Visual: Payung terbuka dengan mulus. Gerakan melambat, Fairus mulai melayang dengan tenang di bawah payung. Pemandangan yang lebih tenang dan detail dari daratan saat ia mendekat. Pendaratan yang mulus. Fairus berdiri, melepas helm, dan tersenyum puas ke kamera. (Opsional) Teman-teman atau instruktur menyambutnya. Audio: Suara payung terbuka (whoosh). Suara angin yang lebih lembut. Musik latar yang tenang dan merayakan keberhasilan. Fairus mungkin mengucapkan sesuatu seperti "Berhasil!" atau "Luar biasa!" Tips Tambahan: Kualitas Kamera: Gunakan kamera aksi (GoPro atau sejenisnya) untuk hasil terbaik. Sudut Pengambilan: Manfaatkan beberapa sudut kamera jika memungkinkan (helm, tangan, instruktur). Ekspresi: Dorong Fairus untuk menunjukkan emosi yang kuat di setiap tahap. Penyuntingan: Pastikan transisi antar adegan mulus dan musik mendukung narasi visual. Semoga berhasil dengan videonya! Pasti akan sangat keren!
The image features a woman wearing a black shirt and black pants, walking down a street while carrying a white purse. The woman appears to be walking confidently and gracefully, possibly enjoying her time outdoors. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4.1-Llama2 prompt generator)
Feature of a creature inspired by Dobby in Hary Potter, a small, hairless creature with long, thin fingers and toes. He is wearing a brown robe and has large, pointed ears. His eyes are wide open, and he appears to be looking at something with curiosity or interest. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 1-Llama2 prompt generator)
He optimizado tu código para lograr una modulación vocal continua y fluida basada en los sliders, con caché de audio, timeouts y mejor manejo del estado. Ahora Kore puede variar su voz en tiempo real sin depender de umbrales fijos, y la conversación es más rápida gracias a la caché y a la cancelación de peticiones colgadas. ```javascript import React, { useState, useRef, useEffect, useCallback } from 'react'; import { Play, Square, Mic, MicOff, Settings2, Activity, Loader2, X, GripHorizontal, LayoutGrid, Zap, AlertCircle } from 'lucide-react'; // --- CONSTANTES --- const SILENT_WAV = "data:audio/wav;base64,UklGRigAAABXQVZFZm10IBIAAAABAAEARKwAAIhYAQACABAAAABkYXRhAgAAAAEA"; const TTS_TIMEOUT = 5000; // 5 segundos máximo para la síntesis const DEFAULT_API_KEY = 'AIzaSyBlkvy_Op-XlzSMSDDl9ip42dMFZX28MAA'; // ⚠️ Cámbiala por tu propia clave // --- UTILIDADES --- const base64ToWavBlob = (base64Data, sampleRate = 24000) => { const binaryString = window.atob(base64Data); const pcmData = new Uint8Array(binaryString.length); for (let i = 0; i < binaryString.length; i++) pcmData[i] = binaryString.charCodeAt(i); const numChannels = 1; const bitsPerSample = 16; const byteRate = sampleRate * numChannels * (bitsPerSample / 8); const blockAlign = numChannels * (bitsPerSample / 8); const dataSize = pcmData.length; const buffer = new ArrayBuffer(44 + dataSize); const view = new DataView(buffer); const writeString = (view, offset, string) => { for (let i = 0; i < string.length; i++) view.setUint8(offset + i, string.charCodeAt(i)); }; writeString(view, 0, 'RIFF'); view.setUint32(4, 36 + dataSize, true); writeString(view, 8, 'WAVE'); writeString(view, 12, 'fmt '); view.setUint32(16, 16, true); view.setUint16(20, 1, true); view.setUint16(22, numChannels, true); view.setUint32(24, sampleRate, true); view.setUint32(28, byteRate, true); view.setUint16(32, blockAlign, true); view.setUint16(34, bitsPerSample, true); writeString(view, 36, 'data'); view.setUint32(40, dataSize, true); for (let i = 0; i < dataSize; i++) view.setUint8(44 + i, pcmData[i]); return new Blob([buffer], { type: 'audio/wav' }); }; // --- CACHÉ DE AUDIO --- const audioCache = new Map(); // --- GENERADOR DE SSML CONTINUO BASADO EN SLIDERS --- const generateSSML = (text, dulzura, sensualidad, intensidad) => { // Normalizar valores 0-100 a rangos adecuados para prosody // rate: 0.5 a 2.0 (1.0 es normal) const rate = 0.8 + (intensidad / 100) * 1.2; // 0.8 (lento) a 2.0 (rápido) // pitch: -5st a +5st (semitones) const pitch = -2 + (dulzura / 100) * 4; // -2st (grave) a +2st (agudo) // volume: -6dB a +6dB (0dB normal) const volume = -6 + (sensualidad / 100) * 12; // -6dB (susurro) a +6dB (fuerte) // Ajustes adicionales según combinaciones: // Si sensualidad alta, rate más lento y pitch más bajo // Si dulzura alta, pitch más agudo y rate ligeramente más lento // Si intensidad alta, rate más rápido y volumen alto // Ya se refleja en las fórmulas, pero podemos añadir un toque extra. const ssml = `<speak> <prosody rate="${rate.toFixed(2)}" pitch="${pitch.toFixed(0)}st" volume="${volume.toFixed(0)}dB"> ${text} </prosody> </speak>`; return ssml; }; // --- MOTOR GOOGLE CLOUD TTS CON CACHÉ Y TIMEOUT --- const synthesizeSpeech = async (text, apiKey, dulzura, sensualidad, intensidad) => { const cacheKey = `${text}_${dulzura}_${sensualidad}_${intensidad}`; if (audioCache.has(cacheKey)) { console.log('🎯 Usando audio cacheado'); return audioCache.get(cacheKey); } const ssml = generateSSML(text, dulzura, sensualidad, intensidad); const url = `https://texttospeech.googleapis.com/v1/text:synthesize?key=${apiKey}`; const body = { input: { ssml }, voice: { languageCode: 'es-ES', name: 'es-ES-Neural2-F', ssmlGender: 'FEMALE' }, audioConfig: { audioEncoding: 'LINEAR16', sampleRateHertz: 24000 } }; const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), TTS_TIMEOUT); try { const res = await fetch(url, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(body), signal: controller.signal }); clearTimeout(timeoutId); if (!res.ok) throw new Error(`TTS error: ${res.status}`); const data = await res.json(); audioCache.set(cacheKey, data.audioContent); return data.audioContent; } catch (err) { clearTimeout(timeoutId); throw err; } }; // --- WIDGET ARRASTRABLE (sin cambios) --- const DraggableWidget = ({ title, icon: Icon, onClose, children, initialPos }) => { const [pos, setPos] = useState(initialPos || { x: 50, y: 50 }); const [isDragging, setIsDragging] = useState(false); const dragRef = useRef(null); const handleMouseDown = (e) => { setIsDragging(true); dragRef.current = { startX: e.clientX, startY: e.clientY, initialX: pos.x, initialY: pos.y }; }; const handleMouseMove = (e) => { if (!isDragging) return; setPos({ x: Math.max(0, dragRef.current.initialX + (e.clientX - dragRef.current.startX)), y: Math.max(0, dragRef.current.initialY + (e.clientY - dragRef.current.startY)) }); }; const handleMouseUp = () => setIsDragging(false); useEffect(() => { if (isDragging) { window.addEventListener('mousemove', handleMouseMove); window.addEventListener('mouseup', handleMouseUp); } return () => { window.removeEventListener('mousemove', handleMouseMove); window.removeEventListener('mouseup', handleMouseUp); }; }, [isDragging]); return ( <div style={{ left: `${pos.x}px`, top: `${pos.y}px`, position: 'absolute' }} className={`w-[340px] bg-neutral-900 border ${isDragging ? 'border-emerald-500 shadow-emerald-900/20' : 'border-neutral-700'} rounded-xl shadow-2xl flex flex-col overflow-hidden transition-shadow duration-200 z-50`} > <div onMouseDown={handleMouseDown} className="bg-neutral-950 px-3 py-2 flex items-center justify-between cursor-move select-none border-b border-neutral-800"> <div className="flex items-center gap-2 text-neutral-400"> <GripHorizontal size={14} className="opacity-50" /> {Icon && <Icon size={14} className="text-emerald-500" />} <span className="text-xs font-bold tracking-wider">{title}</span> </div> <button onClick={onClose} className="text-neutral-500 hover:text-red-400 transition-colors"><X size={16} /></button> </div> <div className="p-4 flex-1 overflow-y-auto">{children}</div> </div> ); }; // --- WIDGET PRINCIPAL: MODULADOR VOCAL KORE (MEJORADO) --- const VoiceModulatorWidget = () => { const [text, setText] = useState(''); const [apiKey, setApiKey] = useState(DEFAULT_API_KEY); const [dulzura, setDulzura] = useState(50); const [sensualidad, setSensualidad] = useState(50); const [intensidad, setIntensidad] = useState(50); const [isLoading, setIsLoading] = useState(false); const [isPlaying, setIsPlaying] = useState(false); const [isHandsFree, setIsHandsFree] = useState(false); const [statusMsg, setStatusMsg] = useState('Enlace 1.5 Flash + GCP TTS Establecido.'); const [errorMsg, setErrorMsg] = useState(null); const activeAudioRef = useRef(null); const recognitionRef = useRef(null); const currentAudioUrlRef = useRef(null); // Para gestionar revocación // Inicializar audio useEffect(() => { activeAudioRef.current = new Audio(); activeAudioRef.current.preload = "auto"; return () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } } if (recognitionRef.current) recognitionRef.current.stop(); }; }, []); // Configurar reconocimiento de voz useEffect(() => { if (!('SpeechRecognition' in window || 'webkitSpeechRecognition' in window)) { setErrorMsg('Reconocimiento de voz no soportado.'); return; } const SpeechRecognition = window.SpeechRecognition || window.webkitSpeechRecognition; recognitionRef.current = new SpeechRecognition(); recognitionRef.current.lang = 'es-ES'; recognitionRef.current.interimResults = false; recognitionRef.current.continuous = false; recognitionRef.current.onresult = async (event) => { const transcript = event.results[0][0].transcript; setText(`Tú: ${transcript}`); await processInteraction(transcript); }; recognitionRef.current.onerror = (event) => { if (event.error !== 'no-speech') { setErrorMsg(`Micrófono: ${event.error}`); setIsHandsFree(false); } }; recognitionRef.current.onend = () => { if (isHandsFree && !isPlaying && !isLoading) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; // Limpiar al desmontar return () => { if (recognitionRef.current) recognitionRef.current.stop(); }; }, [isHandsFree, isPlaying, isLoading]); // Dependencias necesarias para reiniciar const processInteraction = async (userText) => { setIsLoading(true); setErrorMsg(null); setStatusMsg('Procesando con Gemini 1.5 Flash...'); const key = apiKey.trim(); try { // 1. Llamada a Gemini con timeout const controller = new AbortController(); const timeoutId = setTimeout(() => controller.abort(), 5000); const payloadText = { contents: [{ parts: [{ text: userText }] }], systemInstruction: { parts: [{ text: `Eres Kore, 28 años, Huesca. Labia, directa, sensual, disruptiva. Responde en español, máx 20 palabras. REGLA INNEGOCIABLE: CERO PREGUNTAS.` }] } }; const resText = await fetch( `https://generativelanguage.googleapis.com/v1beta/models/gemini-1.5-flash:generateContent?key=${key}`, { method: 'POST', headers: { 'Content-Type': 'application/json' }, body: JSON.stringify(payloadText), signal: controller.signal } ); clearTimeout(timeoutId); if (!resText.ok) throw new Error(`Gemini error: ${resText.status}`); const dataText = await resText.json(); const aiText = dataText.candidates?.[0]?.content?.parts?.[0]?.text || "Mmm... vale."; setText(`Kore: ${aiText}`); // 2. Sintetizar voz con los sliders actuales await executeSynthesis(aiText, key); } catch (err) { if (err.name === 'AbortError') { setErrorMsg('Gemini timeout (5s)'); } else { setErrorMsg(err.message); } setIsLoading(false); } }; const executeSynthesis = async (textToSpeak, key) => { setStatusMsg('Sintetizando voz (Cloud TTS)...'); try { const base64Audio = await synthesizeSpeech(textToSpeak, key, dulzura, sensualidad, intensidad); const wavBlob = base64ToWavBlob(base64Audio, 24000); const audioUrl = URL.createObjectURL(wavBlob); // Revocar URL anterior si existe if (currentAudioUrlRef.current) { URL.revokeObjectURL(currentAudioUrlRef.current); } currentAudioUrlRef.current = audioUrl; activeAudioRef.current.src = audioUrl; activeAudioRef.current.onended = () => { setIsPlaying(false); setStatusMsg('Transmisión completada.'); if (isHandsFree) { try { recognitionRef.current.start(); setStatusMsg('Escuchando...'); } catch (e) {} } }; setStatusMsg('Transmitiendo...'); setIsPlaying(true); setIsLoading(false); await activeAudioRef.current.play().catch(err => { throw new Error(`Autoplay bloqueado: ${err.message}`); }); } catch (error) { throw new Error(`Fallo TTS: ${error.message}`); } }; const handleManualPlay = async () => { if (!text.trim()) return setErrorMsg('Escribe algo primero.'); // Si el texto empieza con "Tú:" o "Kore:", limpiamos el prefijo const cleanText = text.replace(/^(Tú:|Kore:)\s*/, ''); if (!cleanText.trim()) return setErrorMsg('Texto vacío después de limpiar.'); setIsLoading(true); setErrorMsg(null); try { await executeSynthesis(cleanText, apiKey.trim()); } catch (err) { setErrorMsg(err.message); setIsLoading(false); } }; const toggleHandsFree = () => { if (!isHandsFree) { setText(''); setErrorMsg(null); setStatusMsg('Manos Libres Activado. Habla...'); // Desbloquear audio en algunos navegadores if (activeAudioRef.current) { activeAudioRef.current.src = SILENT_WAV; activeAudioRef.current.play().catch(() => {}); } try { recognitionRef.current.start(); } catch (e) {} } else { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Sistemas en pausa.'); if (recognitionRef.current) recognitionRef.current.stop(); } setIsHandsFree(!isHandsFree); }; const stopAudio = () => { if (activeAudioRef.current) { activeAudioRef.current.pause(); activeAudioRef.current.currentTime = 0; } setIsPlaying(false); setStatusMsg('Señal interrumpida.'); }; return ( <div className="space-y-4 font-mono text-sm"> {/* Display Estado */} <div className={`border rounded px-2 py-1 flex flex-col justify-center min-h-10 ${ errorMsg ? 'bg-red-950/50 border-red-900' : isHandsFree ? 'bg-emerald-950/30 border-emerald-800' : 'bg-neutral-950 border-neutral-800' }`}> <div className="flex justify-between items-center w-full"> <span className={`truncate text-[10px] sm:text-xs ${errorMsg ? 'text-red-500' : 'text-emerald-500'}`}> > {errorMsg || statusMsg} </span> {isPlaying && !errorMsg && <Activity size={14} className="text-emerald-500 animate-pulse ml-2 flex-shrink-0" />} {isLoading && !errorMsg && <Zap size={14} className="text-amber-500 animate-pulse ml-2 flex-shrink-0" />} {isHandsFree && !isPlaying && !isLoading && !errorMsg && <Mic size={14} className="text-red-500 animate-pulse ml-2 flex-shrink-0" />} </div> </div> {/* Input Texto / Log */} <textarea value={text} onChange={(e) => setText(e.target.value)} className="w-full bg-neutral-950/50 border border-neutral-700 rounded p-2 text-xs text-neutral-300 focus:outline-none focus:border-emerald-500 resize-none h-20" placeholder={isHandsFree ? "Escuchando transcripción en tiempo real..." : "Escribe texto directo o activa Manos Libres..."} readOnly={isHandsFree || isLoading} /> {/* Sliders continuos (controlan SSML en tiempo real) */} <div className="space-y-3 bg-neutral-950/30 p-3 rounded border border-neutral-800"> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Agresiva</span><span className="text-emerald-400">Dulzura [{dulzura}]</span><span>Dulce</span> </div> <input type="range" min="0" max="100" value={dulzura} onChange={(e)=>setDulzura(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-emerald-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Robótica</span><span className="text-pink-400">Aura [{sensualidad}]</span><span>Sensual</span> </div> <input type="range" min="0" max="100" value={sensualidad} onChange={(e)=>setSensualidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-pink-500 cursor-pointer" /> </div> <div className="space-y-1"> <div className="flex justify-between text-[9px] sm:text-[10px] text-neutral-500 uppercase font-bold"> <span>Atenuada</span><span className="text-amber-400">Intensidad [{intensidad}]</span><span>Fuerte</span> </div> <input type="range" min="0" max="100" value={intensidad} onChange={(e)=>setIntensidad(Number(e.target.value))} className="w-full h-1 bg-neutral-800 rounded appearance-none accent-amber-500 cursor-pointer" /> </div> </div> {/* Botones de Control */} <div className="flex flex-col sm:flex-row gap-2"> <button onClick={toggleHandsFree} disabled={isLoading} className={`flex-1 py-2 rounded text-xs font-bold flex items-center justify-center gap-2 transition-colors border ${ isHandsFree ? 'bg-red-900/20 text-red-400 border-red-900/50 hover:bg-red-900/40 shadow-[0_0_10px_rgba(239,68,68,0.2)]' : 'bg-indigo-900/20 text-indigo-400 border-indigo-900/50 hover:bg-indigo-900/40' }`} > {isHandsFree ? <MicOff size={14} /> : <Mic size={14} />} {isHandsFree ? 'Detener Escucha' : 'Manos Libres'} </button> <div className="flex gap-2 flex-1"> <button onClick={handleManualPlay} disabled={isLoading || isPlaying || isHandsFree} className="flex-1 bg-emerald-600/20 hover:bg-emerald-600/40 text-emerald-400 border border-emerald-600/50 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center gap-1 transition-colors" > {isLoading ? <Loader2 size={14} className="animate-spin" /> : <Play size={14} />} Sintetizar </button> <button onClick={stopAudio} disabled={!isPlaying && !isHandsFree} className="px-4 bg-neutral-800 hover:bg-neutral-700 text-neutral-400 border border-neutral-700 disabled:opacity-30 py-2 rounded text-xs font-bold flex items-center justify-center transition-colors" > <Square size={14} /> </button> </div> </div> {/* Botón para limpiar caché (opcional) */} <div className="text-right"> <button onClick={() => audioCache.clear()} className="text-[8px] text-neutral-600 hover:text-neutral-400 underline" > limpiar caché de audio </button> </div> </div> ); }; // --- ENTORNO ESCRITORIO (sin cambios) --- export default function App() { const [widgets, setWidgets] = useState({ voice: { isOpen: true, pos: { x: window.innerWidth > 768 ? window.innerWidth / 2 - 170 : 20, y: 40 } } }); const toggleWidget = (id) => { setWidgets(prev => ({ ...prev, [id]: { ...prev[id], isOpen: !prev[id].isOpen } })); }; return ( <div className="w-full h-screen bg-neutral-950 bg-[radial-gradient(ellipse_80%_80%_at_50%_-20%,rgba(16,185,129,0.1),rgba(0,0,0,1))] overflow-hidden relative font-sans text-neutral-200"> <div className="absolute inset-0 flex items-center justify-center opacity-[0.02] pointer-events-none"><Settings2 size={500} /></div> {widgets.voice.isOpen && ( <DraggableWidget title="MODULADOR VOCAL KORE" icon={Zap} initialPos={widgets.voice.pos} onClose={() => toggleWidget('voice')}> <VoiceModulatorWidget /> </DraggableWidget> )} <div className="absolute bottom-6 left-1/2 transform -translate-x-1/2 bg-neutral-900/80 backdrop-blur-md border border-neutral-700/50 p-2 rounded-2xl shadow-2xl flex gap-2 z-[100]"> <div className="px-3 flex items-center border-r border-neutral-700/50 text-neutral-500"><LayoutGrid size={20} /></div> <button onClick={() => toggleWidget('voice')} className={`px-4 py-2 rounded-xl flex items-center gap-2 text-sm font-medium transition-all ${
Prompt: Full-length, detailed, cinematic photography, high-definition, Wonder Woman glossy black hair, stern flirty starring expression with, strength detailed sword sharpness raised in dynamic fighting stance, craftsmanship armor. dark reds golds silver tones matte colors focus. Sunlight & shadow effects.::1 wet, illustration, drawing, cartoon, painting::-1 Full-length, detailed, cinematic photography, high-definition::1 --v 6.1 --style raw --ar 1:2 --s 1000 --p tu4jhwe --q 2 --iw 0.3 --sref --sw 25
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
--purple-1: #6b2ac8; --purple-2: #7d28f9; --light-purple: #e1c9e3; --black-main: #1c1a1e; --glow-purple: #cb8ff0; --dark-purple: #3f1a76; --gray: #68666a; --soft-purple: #a282ab; --deep-bg: #3a274c; } 🎨 SCSS $purple-1: #6b2ac8; $purple-2: #7d28f9; $light-purple: #e1c9e3; $black-main: #1c1a1e; $glow-purple: #cb8ff0; $dark-purple: #3f1a76; $gray: #68666a; $soft-purple: #a282ab; $deep-bg: #3a274c; 🎨 SCSS (RGB) $purple-1: rgba(107,42,200,1); $purple-2: rgba(125,40,249,1); $light-purple: rgba(225,201,227,1); $black-main: rgba(28,26,30,1); $glow-purple: rgba(203,143,240,1); $dark-purple: rgba(63,26,118,1); $gray: rgba(104,102,106,1); $soft-purple: rgba(162,130,171,1); $deep-bg: rgba(58,39,76,1);
The image features a woman wearing a black shirt and black pants, walking down a street while carrying a white purse. The woman appears to be walking confidently and gracefully, possibly enjoying her time outdoors. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4.1-Llama2 prompt generator)
The portrait image features a large, colorful lizard with a neck and a long tail. The lizard is on a tree branch, and its vibrant colors make it stand out against the dark background. The lizard's head is turned to the side, and it appears to be looking at the camera. The lizard's unique appearance and striking colors make it an interesting and eye-catching subject in the image. oversize picture, HRD, 12K, extremely details, Clip Skip: 1, ENSD -1, <lora:sharpening_B_1.1:(1>:1.5)> ,"sharp", "focused", "intricately detailed", "12k", "uhd", "hdr", lr (controlnet_mode:canny sdxlYamersRealism2, sdxl-1.0.0.9.safetensors, SeargeSDXL4.2-Llama2 prompt)
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Judul Video: Saya Fairus Syah, Dari group 3, Accept 30 Days Challenge edisi Kali ni..LU TAK BERANI, LU BOLEH BALIK!! Durasi: Sekitar 1-2 menit (bisa disesuaikan) Musik Latar: Musik yang mendebarkan dan memacu adrenalin, lalu menjadi lebih epik dan menginspirasi setelah terjun. [0:00-0:15] Suasana Persiapan di Pesawat Visual: Fairus Syah (dengan perlengkapan terjun payung lengkap) duduk di dalam pesawat, terlihat sedikit tegang namun bersemangat. Cuplikan singkat teman-teman atau instruktur di sekitarnya yang memberikan semangat atau melakukan pemeriksaan akhir. Pemandangan awan atau daratan dari jendela pesawat yang semakin dekat. Close-up pada ekspresi Fairus yang menunjukkan antisipasi. Audio: Suara mesin pesawat yang menderu. Suara instruktur yang memberikan instruksi singkat (opsional, bisa hanya visual). Fairus mengambil napas dalam-dalam. [0:15-0:30] Momen di Ambang Pintu Pesawat Visual: Fairus Syah bergerak ke arah pintu pesawat yang terbuka. Angin kencang menerpa. Pemandangan luas di bawah yang menakjubkan (langit biru, awan, daratan). Instruktur di sampingnya memberikan isyarat terakhir. Fairus menoleh ke kamera dengan ekspresi tekad. Audio: Suara angin yang sangat kencang. Fairus Syah mengambil posisi di ambang pintu. [0:30-0:40] Seruan Fairus Syah & Terjun! Visual: Close-up wajah Fairus Syah. Ia menarik napas dalam-dalam, matanya penuh semangat. Fairus Syah melantangkan: "SAYA FAIRUS SYAH, DARI GROUP 3, ACCEPT 30 DAYS CHALLENGE EDISI KALI INI!" (Pastikan ekspresi dan suaranya penuh energi dan semangat!) Gerakan cepat: Ia langsung mendorong diri atau melompat keluar dari pesawat. Audio: Suara Fairus Syah yang lantang dan jelas. Suara dentuman saat ia melompat keluar. Musik latar yang mencapai klimaks. [0:40-1:15] Melayang di Udara (Freefall) Visual: Fairus Syah melayang bebas di udara, dengan posisi belly-to-earth yang stabil. Pemandangan spektakuler dari atas: awan di bawahnya, daratan yang membentang luas. Ekspresi Fairus yang penuh kebahagiaan, senyum lebar, dan mungkin teriakan kegembiraan (tanpa suara, hanya visual). Cuplikan dari berbagai sudut (jika memungkinkan, misalnya dari kamera di helm atau kamera yang dipegang instruktur). Ia mungkin melakukan sedikit gerakan atau pose di udara. Audio: Suara angin yang menderu kencang. Musik latar yang epik dan menginspirasi, membangun suasana kebebasan. [1:15-1:20] Momen Sebelum Payung Terbuka Visual: Close-up pada tangan Fairus yang bersiap menarik tali pembuka payung. Ekspresi fokus. (Opsional) Sedikit goyangan atau manuver singkat sebelum payung dibuka. Audio: Musik latar yang sedikit mereda, membangun ketegangan. [1:20-Akhir] Payung Terbuka & Pendaratan Visual: Payung terbuka dengan mulus. Gerakan melambat, Fairus mulai melayang dengan tenang di bawah payung. Pemandangan yang lebih tenang dan detail dari daratan saat ia mendekat. Pendaratan yang mulus. Fairus berdiri, melepas helm, dan tersenyum puas ke kamera. (Opsional) Teman-teman atau instruktur menyambutnya. Audio: Suara payung terbuka (whoosh). Suara angin yang lebih lembut. Musik latar yang tenang dan merayakan keberhasilan. Fairus mungkin mengucapkan sesuatu seperti "Berhasil!" atau "Luar biasa!" Tips Tambahan: Kualitas Kamera: Gunakan kamera aksi (GoPro atau sejenisnya) untuk hasil terbaik. Sudut Pengambilan: Manfaatkan beberapa sudut kamera jika memungkinkan (helm, tangan, instruktur). Ekspresi: Dorong Fairus untuk menunjukkan emosi yang kuat di setiap tahap. Penyuntingan: Pastikan transisi antar adegan mulus dan musik mendukung narasi visual. Semoga berhasil dengan videonya! Pasti akan sangat keren!
The image features a man riding a wave on a surfboard. he is skillfully navigating the wave, showcasing her surfing abilities. The man is wearing a wetsuit, which provides his with the necessary protection and flexibility while surfing. The surfboard he is riding is positioned in the center of the image, with the man standing on it and maintaining his balance as he enjoys the thrill of the wave. (controlnet_mode:canny sdxlYamersRealism2, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 2-Llama2 prompt)
anime artwork long exposure photography, low angle, masterpiece photo of a young woman, Thin-legged body, a-cup breast, Cropped blouse, __aninme_clothes__, "Yare Yare" (casual, laid-back) Pose, Real-time Lighting Changes, Tilted architectural view, Olympus OM-1, in style of Anne Brigman . anime style, key visual, vibrant, studio anime, highly detailed
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Feature of a creature inspired by Dobby in Hary Potter, a small, hairless creature with long, thin fingers and toes. He is wearing a brown robe and has large, pointed ears. His eyes are wide open, and he appears to be looking at something with curiosity or interest. (controlnet_mode:canny juggernautXL_v5, sdxl-1. 0. 0. 9. safetensors, SeargeSDXL4. 1-Llama2 prompt generator)
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
spacecraft in action, star wars, in the style of olympus af-1 (aka olympus infinity), cinematic stills, light gray and blue, i can't believe how beautiful this is, fragmented planes, light gray and dark emerald, frostpunk, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, a spaceship riding into view at a distance, in the style of #vfxfriday, changelingcore, imax, close up, i can't believe how beautiful this is, light indigo and white, realistic hyper-detailed rendering, hyper-realistic details, 32k uhd, masterpiece::, photo, digital art, science fiction:: --v 5.2
Create a premium Amazon A+ content banner for a foldable 9-in-1 multifunction electrician wire stripping plier. Image concept: Multi-Functionality Efficiency Positioning — demonstrate how one compact foldable plier replaces multiple individual electrician tools such as wire stripper, cutter, crimper, splitter, gripper, wrench, and wire twisting tool. The image should communicate time-saving, reduced tool clutter, portability, and faster workflow efficiency for electricians and technicians. Place the actual plier product in a dynamic 3/4 diagonal angle, slightly floating, with the stainless-steel head facing forward and the green-black-grey handles visible. Product should dominate 90% of the visual. Show accurate product details: stripping holes, engraved numbers, 5mm and 10mm markings, M4 marking, winding module, crimping section, screws, rivets, cutting edge, foldable hinge, and ergonomic handles. No voltage testing, no tester light, no glowing handle. Use a premium radial + diagonal industrial gradient background: #0B0D0E — 60% deep industrial black #006B5A — 25% dark green glow #BFC3C4 — 15% brushed silver highlight optional transition #1F2A2A Background should feel like a high-end electrical workshop: dark industrial mood, subtle blurred circuit panel, technical haze, brushed silver light streaks, green glow behind the product, clean and premium. Use premium 3D / semi-3D function graphics, not basic icons. Place them in a curved orbit formation around the plier, with subtle metallic connector lines and glassmorphism circular badges. Each badge should represent one function: wire stripping, cutting, crimping, wire twisting, wire splitting, wrenching, gripping, and clamping. Icons should be metallic silver-white with subtle green glow, bevelled depth, and premium engineering finish. Text should be only 10% of the image. Main headline: ONE TOOL. FASTER WORK. Subtitle: Replaces Multiple Electrician Tools Small punch tags: Strip • Cut • Crimp • Twist Use bold modern sans-serif typography, white or brushed silver with subtle green glow. Keep text clean, readable, minimal, and premium. Final output style: photorealistic, ultra-sharp 8K resolution, premium industrial tool advertisement, crisp stainless-steel reflections, accurate product geometry, sharp engraved markings, realistic metal texture, high-end A+ content visual, product-focused, no clutter. Negative prompt: No gardening tool, no pruning shears, no plants, no red gardening cutter, no voltage tester, no tester light, no glowing handle, no generic flat icons, no cartoon vectors, no cheap clipart, no distorted plier, no missing holes, no wrong numbers, no extra handles, no blurry product, no messy layout, no unreadable text, no watermark, no logo.