Mayor’s office → 4,1–4,2 (5 m × 10 m). Vice‑Mayor office → 5,1–5,2 (5 m × 10 m). City administrator → 6,1–6,2 (5 m × 10 m). Executive secretary → 7,1–7,2 (5 m × 10 m). Executive meeting room → 5,2–6,3 (10 m × 5 m). Public‑affairs / comms office → 7,2–10,3 (15 m × 10 m). HR office → 1,2–2,3 (10 m × 10 m). Budget / finance → 1,3–2,4 (10 m × 10 m). General services / procurement → 2,3–3,4 (10 m × 10 m). IT office → 3,3–4,4 (10 m × 10 m). Legal / municipal prosecutor → 4,3–5,4 (10 m × 10 m). Internal audit → 5,3–6,4 (10 m × 10 m). Records / archives room → 10,3–10,4 (5 m × 5 m). Printer / photocopy room → 10,4 (5 m × 4 m). Staff pantry → 7,5–10,6 (15 m × 5 m). City planner / planning → 1,4–1,6 (5 m × 13 m). MPO office → 2,4–2,6 (5 m × 13 m). City engineer → 3,4–3,6 (5 m × 13 m). Building official → 4,4–4,6 (5 m × 13 m). Engineers / inspectors cluster → 1,4–3,6 (15 m × 13 m). Drafting room → 3,4–4,6 (10 m × 13 m). Environment / DRRMC → 4,4–6,6 (10 m × 13 m). Traffic / infrastructure → 6,4–10,6 (15 m × 13 m). Main central corridor → 5,1–5,6 (aligned above GF). Left side hallway → 1,2–1,6. Right side hallway → 10,2–10,6. Back circulation strip → 3,5–7,5 (back band). make it an architectural plan with dimensions, add fire exits and stairs going from first floor (this is second floor)
Produce a shelter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Produce a sheleter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Produce a shelter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Produce a sheleter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Mayor’s office → 4,1–4,2 (5 m × 10 m). Vice‑Mayor office → 5,1–5,2 (5 m × 10 m). City administrator → 6,1–6,2 (5 m × 10 m). Executive secretary → 7,1–7,2 (5 m × 10 m). Executive meeting room → 5,2–6,3 (10 m × 5 m). Public‑affairs / comms office → 7,2–10,3 (15 m × 10 m). HR office → 1,2–2,3 (10 m × 10 m). Budget / finance → 1,3–2,4 (10 m × 10 m). General services / procurement → 2,3–3,4 (10 m × 10 m). IT office → 3,3–4,4 (10 m × 10 m). Legal / municipal prosecutor → 4,3–5,4 (10 m × 10 m). Internal audit → 5,3–6,4 (10 m × 10 m). Records / archives room → 10,3–10,4 (5 m × 5 m). Printer / photocopy room → 10,4 (5 m × 4 m). Staff pantry → 7,5–10,6 (15 m × 5 m). City planner / planning → 1,4–1,6 (5 m × 13 m). MPO office → 2,4–2,6 (5 m × 13 m). City engineer → 3,4–3,6 (5 m × 13 m). Building official → 4,4–4,6 (5 m × 13 m). Engineers / inspectors cluster → 1,4–3,6 (15 m × 13 m). Drafting room → 3,4–4,6 (10 m × 13 m). Environment / DRRMC → 4,4–6,6 (10 m × 13 m). Traffic / infrastructure → 6,4–10,6 (15 m × 13 m). Main central corridor → 5,1–5,6 (aligned above GF). Left side hallway → 1,2–1,6. Right side hallway → 10,2–10,6. Back circulation strip → 3,5–7,5 (back band). make it an architectural plan with dimensions, add fire exits and stairs going from first floor (this is second floor)
Produce a sheleter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Mayor’s office → 4,1–4,2 (5 m × 10 m). Vice‑Mayor office → 5,1–5,2 (5 m × 10 m). City administrator → 6,1–6,2 (5 m × 10 m). Executive secretary → 7,1–7,2 (5 m × 10 m). Executive meeting room → 5,2–6,3 (10 m × 5 m). Public‑affairs / comms office → 7,2–10,3 (15 m × 10 m). HR office → 1,2–2,3 (10 m × 10 m). Budget / finance → 1,3–2,4 (10 m × 10 m). General services / procurement → 2,3–3,4 (10 m × 10 m). IT office → 3,3–4,4 (10 m × 10 m). Legal / municipal prosecutor → 4,3–5,4 (10 m × 10 m). Internal audit → 5,3–6,4 (10 m × 10 m). Records / archives room → 10,3–10,4 (5 m × 5 m). Printer / photocopy room → 10,4 (5 m × 4 m). Staff pantry → 7,5–10,6 (15 m × 5 m). City planner / planning → 1,4–1,6 (5 m × 13 m). MPO office → 2,4–2,6 (5 m × 13 m). City engineer → 3,4–3,6 (5 m × 13 m). Building official → 4,4–4,6 (5 m × 13 m). Engineers / inspectors cluster → 1,4–3,6 (15 m × 13 m). Drafting room → 3,4–4,6 (10 m × 13 m). Environment / DRRMC → 4,4–6,6 (10 m × 13 m). Traffic / infrastructure → 6,4–10,6 (15 m × 13 m). Main central corridor → 5,1–5,6 (aligned above GF). Left side hallway → 1,2–1,6. Right side hallway → 10,2–10,6. Back circulation strip → 3,5–7,5 (back band). make it an architectural plan with dimensions, add fire exits and stairs going from first floor (this is second floor)
Produce a shelter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Mayor’s office → 4,1–4,2 (5 m × 10 m). Vice‑Mayor office → 5,1–5,2 (5 m × 10 m). City administrator → 6,1–6,2 (5 m × 10 m). Executive secretary → 7,1–7,2 (5 m × 10 m). Executive meeting room → 5,2–6,3 (10 m × 5 m). Public‑affairs / comms office → 7,2–10,3 (15 m × 10 m). HR office → 1,2–2,3 (10 m × 10 m). Budget / finance → 1,3–2,4 (10 m × 10 m). General services / procurement → 2,3–3,4 (10 m × 10 m). IT office → 3,3–4,4 (10 m × 10 m). Legal / municipal prosecutor → 4,3–5,4 (10 m × 10 m). Internal audit → 5,3–6,4 (10 m × 10 m). Records / archives room → 10,3–10,4 (5 m × 5 m). Printer / photocopy room → 10,4 (5 m × 4 m). Staff pantry → 7,5–10,6 (15 m × 5 m). City planner / planning → 1,4–1,6 (5 m × 13 m). MPO office → 2,4–2,6 (5 m × 13 m). City engineer → 3,4–3,6 (5 m × 13 m). Building official → 4,4–4,6 (5 m × 13 m). Engineers / inspectors cluster → 1,4–3,6 (15 m × 13 m). Drafting room → 3,4–4,6 (10 m × 13 m). Environment / DRRMC → 4,4–6,6 (10 m × 13 m). Traffic / infrastructure → 6,4–10,6 (15 m × 13 m). Main central corridor → 5,1–5,6 (aligned above GF). Left side hallway → 1,2–1,6. Right side hallway → 10,2–10,6. Back circulation strip → 3,5–7,5 (back band). make it an architectural plan with dimensions, add fire exits and stairs going from first floor (this is second floor)
Produce a shelter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Produce a sheleter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Produce a sheleter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Produce a shelter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Mayor’s office → 4,1–4,2 (5 m × 10 m). Vice‑Mayor office → 5,1–5,2 (5 m × 10 m). City administrator → 6,1–6,2 (5 m × 10 m). Executive secretary → 7,1–7,2 (5 m × 10 m). Executive meeting room → 5,2–6,3 (10 m × 5 m). Public‑affairs / comms office → 7,2–10,3 (15 m × 10 m). HR office → 1,2–2,3 (10 m × 10 m). Budget / finance → 1,3–2,4 (10 m × 10 m). General services / procurement → 2,3–3,4 (10 m × 10 m). IT office → 3,3–4,4 (10 m × 10 m). Legal / municipal prosecutor → 4,3–5,4 (10 m × 10 m). Internal audit → 5,3–6,4 (10 m × 10 m). Records / archives room → 10,3–10,4 (5 m × 5 m). Printer / photocopy room → 10,4 (5 m × 4 m). Staff pantry → 7,5–10,6 (15 m × 5 m). City planner / planning → 1,4–1,6 (5 m × 13 m). MPO office → 2,4–2,6 (5 m × 13 m). City engineer → 3,4–3,6 (5 m × 13 m). Building official → 4,4–4,6 (5 m × 13 m). Engineers / inspectors cluster → 1,4–3,6 (15 m × 13 m). Drafting room → 3,4–4,6 (10 m × 13 m). Environment / DRRMC → 4,4–6,6 (10 m × 13 m). Traffic / infrastructure → 6,4–10,6 (15 m × 13 m). Main central corridor → 5,1–5,6 (aligned above GF). Left side hallway → 1,2–1,6. Right side hallway → 10,2–10,6. Back circulation strip → 3,5–7,5 (back band). make it an architectural plan with dimensions, add fire exits and stairs going from first floor (this is second floor)
Produce a sheleter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Produce a shelter is a 6-meter long, 2.4-meter wide, and 2.6-meter high cube equipped with hydraulic extension arms at each of its four corners for expansion and height adjustment. The interior of the cube is utilized as a testing laboratory. Inside the laboratory, there is a central aisle, with the floor marked with safety signage. Experimental benches are placed on both sides of the aisle. The overall interior design of the laboratory features a primary color scheme of tech white. On the right side of the cube, there is an automatic sensor-operated door. Adjacent to this door, there is a window measuring 2 meters in length and 1 meter in height, constructed with double-layered glass.
Mayor’s office → 4,1–4,2 (5 m × 10 m). Vice‑Mayor office → 5,1–5,2 (5 m × 10 m). City administrator → 6,1–6,2 (5 m × 10 m). Executive secretary → 7,1–7,2 (5 m × 10 m). Executive meeting room → 5,2–6,3 (10 m × 5 m). Public‑affairs / comms office → 7,2–10,3 (15 m × 10 m). HR office → 1,2–2,3 (10 m × 10 m). Budget / finance → 1,3–2,4 (10 m × 10 m). General services / procurement → 2,3–3,4 (10 m × 10 m). IT office → 3,3–4,4 (10 m × 10 m). Legal / municipal prosecutor → 4,3–5,4 (10 m × 10 m). Internal audit → 5,3–6,4 (10 m × 10 m). Records / archives room → 10,3–10,4 (5 m × 5 m). Printer / photocopy room → 10,4 (5 m × 4 m). Staff pantry → 7,5–10,6 (15 m × 5 m). City planner / planning → 1,4–1,6 (5 m × 13 m). MPO office → 2,4–2,6 (5 m × 13 m). City engineer → 3,4–3,6 (5 m × 13 m). Building official → 4,4–4,6 (5 m × 13 m). Engineers / inspectors cluster → 1,4–3,6 (15 m × 13 m). Drafting room → 3,4–4,6 (10 m × 13 m). Environment / DRRMC → 4,4–6,6 (10 m × 13 m). Traffic / infrastructure → 6,4–10,6 (15 m × 13 m). Main central corridor → 5,1–5,6 (aligned above GF). Left side hallway → 1,2–1,6. Right side hallway → 10,2–10,6. Back circulation strip → 3,5–7,5 (back band). make it an architectural plan with dimensions, add fire exits and stairs going from first floor (this is second floor)