A surreal image of a gasoline key, sculpted entirely out of liquid gasoline, with a thick, oily, and dark amber texture. The key retains its shape, but the gasoline appears to be flowing and dripping, with a glossy, sticky appearance. The surface of the key is reflective, showing the oily sheen typical of gasoline. The liquid looks dense and viscous, and small droplets of gasoline are splattering from the edges. The background is a blurred industrial setting, with dim, warm lighting that emphasizes the smooth, thick texture of the gasoline.
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
Unapologetic, Perfectcore, bizarre, freaky graphic poster, lust, futuristic, strong graphic, line, Behance, award - winning, extraordinary, modern, screen print, old paper background, use many shapes, no frames, surrealism matte background melting oil on canvas, dark colors, demonic in nature, parallel universe
full body front view of a 3d illustrated african american superHERO with white glowing short dreadlocks,and a reflective visor.His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging,he has a heroic smile look on his face,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy,the background is deep space,outer space lots of stars and planets,front view of a PHOTOrealistic african american superHERO with white glowing short dreadlocks,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy walking towards the camera as the ground is exploding and rocks are flying,his arms are at his side but also has lightning energy rippling up and down them,His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging through him,3d illustration,with oil gouache melting and acrylic textures.High contrast,colorful polychromatic,ultra-detailed,ultra-quality,CGSociety aesthetic, in background the word "STARBOY" is made out of electricity and energy.Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
graffiti art, street art, spray paint, oil gouache melting, acrylic, high contrast, black background, | Full Body | portrait of <lora:lowrider paintjobs:1.0>, in the style of a (Urban Fashion), colorful polychromatic, ultra detailed, ultra quality, CGSociety, highly detailed, Ultra quality masterpiece
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
A surreal image of a gasoline key, sculpted entirely out of liquid gasoline, with a thick, oily, and dark amber texture. The key retains its shape, but the gasoline appears to be flowing and dripping, with a glossy, sticky appearance. The surface of the key is reflective, showing the oily sheen typical of gasoline. The liquid looks dense and viscous, and small droplets of gasoline are splattering from the edges. The background is a blurred industrial setting, with dim, warm lighting that emphasizes the smooth, thick texture of the gasoline.
Unapologetic, Perfectcore, bizarre, freaky graphic poster, lust, futuristic, strong graphic, line, Behance, award - winning, extraordinary, modern, screen print, old paper background, use many shapes, no frames, surrealism matte background melting oil on canvas, dark colors, demonic in nature, parallel universe
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
full body front view of a 3d illustrated african american superHERO with white glowing short dreadlocks,and a reflective visor.His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging,he has a heroic smile look on his face,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy,the background is deep space,outer space lots of stars and planets,front view of a PHOTOrealistic african american superHERO with white glowing short dreadlocks,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy walking towards the camera as the ground is exploding and rocks are flying,his arms are at his side but also has lightning energy rippling up and down them,His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging through him,3d illustration,with oil gouache melting and acrylic textures.High contrast,colorful polychromatic,ultra-detailed,ultra-quality,CGSociety aesthetic, in background the word "STARBOY" is made out of electricity and energy.Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
graffiti art, street art, spray paint, oil gouache melting, acrylic, high contrast, black background, | Full Body | portrait of <lora:lowrider paintjobs:1.0>, in the style of a (Urban Fashion), colorful polychromatic, ultra detailed, ultra quality, CGSociety, highly detailed, Ultra quality masterpiece
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
full body front view of a 3d illustrated african american superHERO with white glowing short dreadlocks,and a reflective visor.His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging,he has a heroic smile look on his face,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy,the background is deep space,outer space lots of stars and planets,front view of a PHOTOrealistic african american superHERO with white glowing short dreadlocks,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy walking towards the camera as the ground is exploding and rocks are flying,his arms are at his side but also has lightning energy rippling up and down them,His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging through him,3d illustration,with oil gouache melting and acrylic textures.High contrast,colorful polychromatic,ultra-detailed,ultra-quality,CGSociety aesthetic, in background the word "STARBOY" is made out of electricity and energy.Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
graffiti art, street art, spray paint, oil gouache melting, acrylic, high contrast, black background, | Full Body | portrait of <lora:lowrider paintjobs:1.0>, in the style of a (Urban Fashion), colorful polychromatic, ultra detailed, ultra quality, CGSociety, highly detailed, Ultra quality masterpiece
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
A surreal image of a gasoline key, sculpted entirely out of liquid gasoline, with a thick, oily, and dark amber texture. The key retains its shape, but the gasoline appears to be flowing and dripping, with a glossy, sticky appearance. The surface of the key is reflective, showing the oily sheen typical of gasoline. The liquid looks dense and viscous, and small droplets of gasoline are splattering from the edges. The background is a blurred industrial setting, with dim, warm lighting that emphasizes the smooth, thick texture of the gasoline.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
Unapologetic, Perfectcore, bizarre, freaky graphic poster, lust, futuristic, strong graphic, line, Behance, award - winning, extraordinary, modern, screen print, old paper background, use many shapes, no frames, surrealism matte background melting oil on canvas, dark colors, demonic in nature, parallel universe
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
Unapologetic, Perfectcore, bizarre, freaky graphic poster, lust, futuristic, strong graphic, line, Behance, award - winning, extraordinary, modern, screen print, old paper background, use many shapes, no frames, surrealism matte background melting oil on canvas, dark colors, demonic in nature, parallel universe
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
full body front view of a 3d illustrated african american superHERO with white glowing short dreadlocks,and a reflective visor.His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging,he has a heroic smile look on his face,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy,the background is deep space,outer space lots of stars and planets,front view of a PHOTOrealistic african american superHERO with white glowing short dreadlocks,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy walking towards the camera as the ground is exploding and rocks are flying,his arms are at his side but also has lightning energy rippling up and down them,His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging through him,3d illustration,with oil gouache melting and acrylic textures.High contrast,colorful polychromatic,ultra-detailed,ultra-quality,CGSociety aesthetic, in background the word "STARBOY" is made out of electricity and energy.Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
graffiti art, street art, spray paint, oil gouache melting, acrylic, high contrast, black background, | Full Body | portrait of <lora:lowrider paintjobs:1.0>, in the style of a (Urban Fashion), colorful polychromatic, ultra detailed, ultra quality, CGSociety, highly detailed, Ultra quality masterpiece
A surreal image of a gasoline key, sculpted entirely out of liquid gasoline, with a thick, oily, and dark amber texture. The key retains its shape, but the gasoline appears to be flowing and dripping, with a glossy, sticky appearance. The surface of the key is reflective, showing the oily sheen typical of gasoline. The liquid looks dense and viscous, and small droplets of gasoline are splattering from the edges. The background is a blurred industrial setting, with dim, warm lighting that emphasizes the smooth, thick texture of the gasoline.
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
A surreal image of a gasoline key, sculpted entirely out of liquid gasoline, with a thick, oily, and dark amber texture. The key retains its shape, but the gasoline appears to be flowing and dripping, with a glossy, sticky appearance. The surface of the key is reflective, showing the oily sheen typical of gasoline. The liquid looks dense and viscous, and small droplets of gasoline are splattering from the edges. The background is a blurred industrial setting, with dim, warm lighting that emphasizes the smooth, thick texture of the gasoline.
Unapologetic, Perfectcore, bizarre, freaky graphic poster, lust, futuristic, strong graphic, line, Behance, award - winning, extraordinary, modern, screen print, old paper background, use many shapes, no frames, surrealism matte background melting oil on canvas, dark colors, demonic in nature, parallel universe
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
graffiti art, street art, spray paint, oil gouache melting, acrylic, high contrast, black background, | Full Body | portrait of <lora:lowrider paintjobs:1.0>, in the style of a (Urban Fashion), colorful polychromatic, ultra detailed, ultra quality, CGSociety, highly detailed, Ultra quality masterpiece
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
full body front view of a 3d illustrated african american superHERO with white glowing short dreadlocks,and a reflective visor.His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging,he has a heroic smile look on his face,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy,the background is deep space,outer space lots of stars and planets,front view of a PHOTOrealistic african american superHERO with white glowing short dreadlocks,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy walking towards the camera as the ground is exploding and rocks are flying,his arms are at his side but also has lightning energy rippling up and down them,His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging through him,3d illustration,with oil gouache melting and acrylic textures.High contrast,colorful polychromatic,ultra-detailed,ultra-quality,CGSociety aesthetic, in background the word "STARBOY" is made out of electricity and energy.Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Unapologetic, Perfectcore, bizarre, freaky graphic poster, lust, futuristic, strong graphic, line, Behance, award - winning, extraordinary, modern, screen print, old paper background, use many shapes, no frames, surrealism matte background melting oil on canvas, dark colors, demonic in nature, parallel universe
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
A surreal image of a gasoline key, sculpted entirely out of liquid gasoline, with a thick, oily, and dark amber texture. The key retains its shape, but the gasoline appears to be flowing and dripping, with a glossy, sticky appearance. The surface of the key is reflective, showing the oily sheen typical of gasoline. The liquid looks dense and viscous, and small droplets of gasoline are splattering from the edges. The background is a blurred industrial setting, with dim, warm lighting that emphasizes the smooth, thick texture of the gasoline.
full body front view of a 3d illustrated african american superHERO with white glowing short dreadlocks,and a reflective visor.His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging,he has a heroic smile look on his face,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy,the background is deep space,outer space lots of stars and planets,front view of a PHOTOrealistic african american superHERO with white glowing short dreadlocks,his body is covered in dark shadows and the shadows are filled with outer space and the galaxy walking towards the camera as the ground is exploding and rocks are flying,his arms are at his side but also has lightning energy rippling up and down them,His dreads are are white with a slight glow to them but look like they're being electrified by all the energy surging through him,3d illustration,with oil gouache melting and acrylic textures.High contrast,colorful polychromatic,ultra-detailed,ultra-quality,CGSociety aesthetic, in background the word "STARBOY" is made out of electricity and energy.Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
realistic 3d super saiyan prince reimagined as a drill rapper sitting on stacks of money and his yellow super saiyan hair is burning white hot, EYES SLIGHTLY GLOWING EVIL GRIN ON HIS FACE, royal saiyan streetwear, luxury battle armor inspired puffer vest, alien gold chains, royal blue and gold details, aggressive confident pose counting huge stacks of money, massive wildstyle graffiti behind him reading "HU$TLR", neon blue aura, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety, intricate details, HDR, beautifully shot, hyperrealistic, sharp focus, 64 megapixels, perfect composition, high contrast, cinematic, atmospheric, moody
front view of a full body 3d illustration of an angry hip hop super saiyan warrior wearing vegeta armor,his saiyan black costume is covered in pitch black dark shadows and the shadows are filled with outer space and his yellow super saiyan hair is burning white hot, HE IS in a kneeling position with one knee down and the other foot planted down in the open palm of a large giant metallic hand similar to galactus open wide, the open hand's point of view is open towards us as blue electrical energy surges along his arms, rocks are flying in the air and blue electrical energy surges along his arms, focal image is of a superhero kneeling in the open palm of a giant metallic galactus hand with energy surging, Style: 3d illustrated,dark,cinematic concept art,dramatic lighting,high detail,graffiti art,splash art,street art,spray paint,oil gouache melting,acrylic,high contrast,colorful polychromatic,ultra detailed,ultra quality,CGSociety, graffiti art, splash art, street art, spray paint, oil gouache melting, acrylic, high contrast, colorful polychromatic, ultra detailed, ultra quality, CGSociety
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
graffiti art, street art, spray paint, oil gouache melting, acrylic, high contrast, black background, | Full Body | portrait of <lora:lowrider paintjobs:1.0>, in the style of a (Urban Fashion), colorful polychromatic, ultra detailed, ultra quality, CGSociety, highly detailed, Ultra quality masterpiece