A close-up shot of a Chernobyl liquidator's gas mask, filling the frame with gritty, realistic detail. The mask is worn and authentic, modeled after Soviet-era designs with rounded lenses, thick rubber seals, and heavy straps, covered in ash and grime from the reactor’s fallout. The lenses are the focal point, each glass surface slightly warped and scratched, reflecting the fierce glow of distant fires within the reactor. Flames dance across the curved lenses in shades of red, orange, and intense yellow, creating a haunting, distorted view of the fiery chaos within. Lighting and Shadow Play: The overall lighting is low and moody, with harsh shadows defining the rugged texture of the mask and highlighting its worn, weathered surface. Dim light from a flickering source to the left illuminates the mask partially, casting deep shadows across the rubber surface, creating an ominous, high-contrast look. Hazy backlighting subtly outlines the mask’s contours, adding depth and a sense of foreboding. Atmospheric Details: The air is thick with smoke and radioactive dust, faintly illuminated by the fiery reflection in the lenses. Tiny, glowing particles float through the air, adding to the toxic, dangerous atmosphere. Thin wisps of smoke drift around the mask, softening the edges and giving the scene a ghostly quality. Surface Texture and Wear: The rubber of the mask is cracked and stained, showing the toll of exposure to radiation and extreme heat. Ash and small flecks of debris cling to its surface, adding realism and a gritty feel. Around the edges, faint condensation gathers on the rubber, hinting at the liquidator’s breath inside the suit. Reflection Details in the Lenses: In the mask's lenses, we see reflections of distant fires raging inside the reactor, with structures burning and twisted metal faintly visible in the intense glow. The reflections are slightly distorted, warped by the rounded glass, as if the fires themselves are bending reality. Occasional flickers of light pulse in the reflection, conveying the flickering intensity of the flames. Mood and Composition: The close-up shot emphasizes the isolation, courage, and silent determination of the liquidator. The composition is hauntingly intimate, placing the viewer face-to-face with the mask, capturing the intensity of the task and the immense, invisible danger surrounding them. Every detail contributes to a heavy, foreboding atmosphere, evoking a sense of dread and silent resilience.
A lone liquidator in an abandoned reactor hall, covered head-to-toe in a cracked, soot-streaked green hazmat suit, stands amidst twisted metal and crumbling concrete, illuminated by an eerie, flickering blue-green light. His gas mask lenses are fogged and slightly cracked, with faint reflections of distant fires and glowing radioactive embers floating through the thick, toxic haze. In the background, collapsed pipes drip irradiated, glowing liquid that pools in small, sinister puddles on the floor. Wisps of smoke drift through the air, casting deep shadows over the scene, and tiny, ghostly particles float like radioactive dust around him, glowing faintly. The scene is shrouded in silence, save for the quiet hum of decaying machinery. A low-angle shot enhances the scale and isolation, with the crumbling reactor looming above, half-covered in darkness. The atmosphere is thick, gritty, and foreboding, capturing the sense of life-or-death duty in this abandoned, post-apocalyptic setting
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."
Hyperrealistic panoramic view of Mako Reactor 7 in Midgar, inspired by Final Fantasy VII. A wide, elevated perspective reveals a massive industrial structure built on metal platforms, surrounded by enormous pipes, steam columns, rusted walkways, and heavy machinery. The central reactor core glows with a toxic green light from the flowing mako energy, rising as luminous mist into the dark, polluted sky. In the distance, parts of Sector 7 and the support columns of Midgar’s upper plate are visible. The atmosphere is dense with smoke, sparks, flickering red and yellow warning lights, and bursts of energy from the reactor core. Everything is coated in grime, rust, and decaying steel. Cinematic style, with cold greenish hues and dramatic artificial lighting, evoking a feeling of immense scale, oppression, and decayed industrial technology.
"A professional news broadcast interrupts regular programming with a bright red 'BREAKING NEWS' banner. The screen cuts to a live aerial shot of a nuclear power plant, just as a massive explosion tears through one of the reactor buildings. A blinding white flash is followed by a fireball, shockwave, and rising mushroom cloud. The camera shakes and distorts from the blast. Cut to a news anchor in the studio, visibly shaken but trying to stay composed. He says: 'We are interrupting live to bring you urgent news: a catastrophic explosion has just occurred at the Clearwater Nuclear Facility. We repeat — a nuclear reactor has exploded. The cause is currently unknown. This footage is live.' The broadcast cuts between chaotic live footage: panicked evacuations, emergency crews, distant sirens, and ash raining from the sky. On-screen graphics show a map with a growing red contamination zone. Radiation levels scroll across the bottom ticker. Cut to a field reporter in a hazmat suit near the exclusion perimeter. She yells over the noise: 'The situation here is rapidly deteriorating — the radiation is spiking, and officials are urging all residents within 30 kilometers to evacuate immediately. I can see fire crews moving in, but—' The feed glitches out briefly, then returns with static and emergency alerts. The segment ends with the anchor solemnly saying: 'This is a developing situation. Stay indoors. Do not go outside. More updates as we get them.'*
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."
Amid the chaos in the ruined Chernobyl Nuclear Station, Hours after a mysterious second explosion in the core of the Chernobyl Ruins a scavenger team known as Unit Kappa-7 infiltrates the Black Zone. The guards and remaining scavengers stumble into a restricted area deep beneath the complex: the Isolation Vaults, once used to study radiation-resistant lifeforms. Now, grotesque part-human creatures roam. The explosion has awakened them—and mutated them further. They find themselves in a. battle with (The Nucleus Host: a bloated fusion of human and reactor control hardware, surrounded by floating radiation drones:1.9), and whispering in broken alien tongues. Subtle red and white highlights. The Nucleus Host is guarding the Food Creation Laboratory where bizarre ugly animals are reared for the inhabitants of the Chernobyl Ruins. Pale strobe lighting as monsters emerge from tunnels. Gunfire and firelight reflecting off slick, mutated skin. One-on-one fights in half-submerged reactor vaults.
A lone liquidator in an abandoned reactor hall, covered head-to-toe in a cracked, soot-streaked green hazmat suit, stands amidst twisted metal and crumbling concrete, illuminated by an eerie, flickering blue-green light. His gas mask lenses are fogged and slightly cracked, with faint reflections of distant fires and glowing radioactive embers floating through the thick, toxic haze. In the background, collapsed pipes drip irradiated, glowing liquid that pools in small, sinister puddles on the floor. Wisps of smoke drift through the air, casting deep shadows over the scene, and tiny, ghostly particles float like radioactive dust around him, glowing faintly. The scene is shrouded in silence, save for the quiet hum of decaying machinery. A low-angle shot enhances the scale and isolation, with the crumbling reactor looming above, half-covered in darkness. The atmosphere is thick, gritty, and foreboding, capturing the sense of life-or-death duty in this abandoned, post-apocalyptic setting
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Hyperrealistic panoramic view of Mako Reactor 7 in Midgar, inspired by Final Fantasy VII. A wide, elevated perspective reveals a massive industrial structure built on metal platforms, surrounded by enormous pipes, steam columns, rusted walkways, and heavy machinery. The central reactor core glows with a toxic green light from the flowing mako energy, rising as luminous mist into the dark, polluted sky. In the distance, parts of Sector 7 and the support columns of Midgar’s upper plate are visible. The atmosphere is dense with smoke, sparks, flickering red and yellow warning lights, and bursts of energy from the reactor core. Everything is coated in grime, rust, and decaying steel. Cinematic style, with cold greenish hues and dramatic artificial lighting, evoking a feeling of immense scale, oppression, and decayed industrial technology.
Amid the chaos in the ruined Chernobyl Nuclear Station, Hours after a mysterious second explosion in the core of the Chernobyl Ruins a scavenger team known as Unit Kappa-7 infiltrates the Black Zone. The guards and remaining scavengers stumble into a restricted area deep beneath the complex: the Isolation Vaults, once used to study radiation-resistant lifeforms. Now, grotesque part-human creatures roam. The explosion has awakened them—and mutated them further. They find themselves in a. battle with (The Nucleus Host: a bloated fusion of human and reactor control hardware, surrounded by floating radiation drones:1.9), and whispering in broken alien tongues. Subtle red and white highlights. The Nucleus Host is guarding the Food Creation Laboratory where bizarre ugly animals are reared for the inhabitants of the Chernobyl Ruins. Pale strobe lighting as monsters emerge from tunnels. Gunfire and firelight reflecting off slick, mutated skin. One-on-one fights in half-submerged reactor vaults.
A close-up shot of a Chernobyl liquidator's gas mask, filling the frame with gritty, realistic detail. The mask is worn and authentic, modeled after Soviet-era designs with rounded lenses, thick rubber seals, and heavy straps, covered in ash and grime from the reactor’s fallout. The lenses are the focal point, each glass surface slightly warped and scratched, reflecting the fierce glow of distant fires within the reactor. Flames dance across the curved lenses in shades of red, orange, and intense yellow, creating a haunting, distorted view of the fiery chaos within. Lighting and Shadow Play: The overall lighting is low and moody, with harsh shadows defining the rugged texture of the mask and highlighting its worn, weathered surface. Dim light from a flickering source to the left illuminates the mask partially, casting deep shadows across the rubber surface, creating an ominous, high-contrast look. Hazy backlighting subtly outlines the mask’s contours, adding depth and a sense of foreboding. Atmospheric Details: The air is thick with smoke and radioactive dust, faintly illuminated by the fiery reflection in the lenses. Tiny, glowing particles float through the air, adding to the toxic, dangerous atmosphere. Thin wisps of smoke drift around the mask, softening the edges and giving the scene a ghostly quality. Surface Texture and Wear: The rubber of the mask is cracked and stained, showing the toll of exposure to radiation and extreme heat. Ash and small flecks of debris cling to its surface, adding realism and a gritty feel. Around the edges, faint condensation gathers on the rubber, hinting at the liquidator’s breath inside the suit. Reflection Details in the Lenses: In the mask's lenses, we see reflections of distant fires raging inside the reactor, with structures burning and twisted metal faintly visible in the intense glow. The reflections are slightly distorted, warped by the rounded glass, as if the fires themselves are bending reality. Occasional flickers of light pulse in the reflection, conveying the flickering intensity of the flames. Mood and Composition: The close-up shot emphasizes the isolation, courage, and silent determination of the liquidator. The composition is hauntingly intimate, placing the viewer face-to-face with the mask, capturing the intensity of the task and the immense, invisible danger surrounding them. Every detail contributes to a heavy, foreboding atmosphere, evoking a sense of dread and silent resilience.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."
"A professional news broadcast interrupts regular programming with a bright red 'BREAKING NEWS' banner. The screen cuts to a live aerial shot of a nuclear power plant, just as a massive explosion tears through one of the reactor buildings. A blinding white flash is followed by a fireball, shockwave, and rising mushroom cloud. The camera shakes and distorts from the blast. Cut to a news anchor in the studio, visibly shaken but trying to stay composed. He says: 'We are interrupting live to bring you urgent news: a catastrophic explosion has just occurred at the Clearwater Nuclear Facility. We repeat — a nuclear reactor has exploded. The cause is currently unknown. This footage is live.' The broadcast cuts between chaotic live footage: panicked evacuations, emergency crews, distant sirens, and ash raining from the sky. On-screen graphics show a map with a growing red contamination zone. Radiation levels scroll across the bottom ticker. Cut to a field reporter in a hazmat suit near the exclusion perimeter. She yells over the noise: 'The situation here is rapidly deteriorating — the radiation is spiking, and officials are urging all residents within 30 kilometers to evacuate immediately. I can see fire crews moving in, but—' The feed glitches out briefly, then returns with static and emergency alerts. The segment ends with the anchor solemnly saying: 'This is a developing situation. Stay indoors. Do not go outside. More updates as we get them.'*
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."
A lone liquidator in an abandoned reactor hall, covered head-to-toe in a cracked, soot-streaked green hazmat suit, stands amidst twisted metal and crumbling concrete, illuminated by an eerie, flickering blue-green light. His gas mask lenses are fogged and slightly cracked, with faint reflections of distant fires and glowing radioactive embers floating through the thick, toxic haze. In the background, collapsed pipes drip irradiated, glowing liquid that pools in small, sinister puddles on the floor. Wisps of smoke drift through the air, casting deep shadows over the scene, and tiny, ghostly particles float like radioactive dust around him, glowing faintly. The scene is shrouded in silence, save for the quiet hum of decaying machinery. A low-angle shot enhances the scale and isolation, with the crumbling reactor looming above, half-covered in darkness. The atmosphere is thick, gritty, and foreboding, capturing the sense of life-or-death duty in this abandoned, post-apocalyptic setting
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."
"A professional news broadcast interrupts regular programming with a bright red 'BREAKING NEWS' banner. The screen cuts to a live aerial shot of a nuclear power plant, just as a massive explosion tears through one of the reactor buildings. A blinding white flash is followed by a fireball, shockwave, and rising mushroom cloud. The camera shakes and distorts from the blast. Cut to a news anchor in the studio, visibly shaken but trying to stay composed. He says: 'We are interrupting live to bring you urgent news: a catastrophic explosion has just occurred at the Clearwater Nuclear Facility. We repeat — a nuclear reactor has exploded. The cause is currently unknown. This footage is live.' The broadcast cuts between chaotic live footage: panicked evacuations, emergency crews, distant sirens, and ash raining from the sky. On-screen graphics show a map with a growing red contamination zone. Radiation levels scroll across the bottom ticker. Cut to a field reporter in a hazmat suit near the exclusion perimeter. She yells over the noise: 'The situation here is rapidly deteriorating — the radiation is spiking, and officials are urging all residents within 30 kilometers to evacuate immediately. I can see fire crews moving in, but—' The feed glitches out briefly, then returns with static and emergency alerts. The segment ends with the anchor solemnly saying: 'This is a developing situation. Stay indoors. Do not go outside. More updates as we get them.'*
A close-up shot of a Chernobyl liquidator's gas mask, filling the frame with gritty, realistic detail. The mask is worn and authentic, modeled after Soviet-era designs with rounded lenses, thick rubber seals, and heavy straps, covered in ash and grime from the reactor’s fallout. The lenses are the focal point, each glass surface slightly warped and scratched, reflecting the fierce glow of distant fires within the reactor. Flames dance across the curved lenses in shades of red, orange, and intense yellow, creating a haunting, distorted view of the fiery chaos within. Lighting and Shadow Play: The overall lighting is low and moody, with harsh shadows defining the rugged texture of the mask and highlighting its worn, weathered surface. Dim light from a flickering source to the left illuminates the mask partially, casting deep shadows across the rubber surface, creating an ominous, high-contrast look. Hazy backlighting subtly outlines the mask’s contours, adding depth and a sense of foreboding. Atmospheric Details: The air is thick with smoke and radioactive dust, faintly illuminated by the fiery reflection in the lenses. Tiny, glowing particles float through the air, adding to the toxic, dangerous atmosphere. Thin wisps of smoke drift around the mask, softening the edges and giving the scene a ghostly quality. Surface Texture and Wear: The rubber of the mask is cracked and stained, showing the toll of exposure to radiation and extreme heat. Ash and small flecks of debris cling to its surface, adding realism and a gritty feel. Around the edges, faint condensation gathers on the rubber, hinting at the liquidator’s breath inside the suit. Reflection Details in the Lenses: In the mask's lenses, we see reflections of distant fires raging inside the reactor, with structures burning and twisted metal faintly visible in the intense glow. The reflections are slightly distorted, warped by the rounded glass, as if the fires themselves are bending reality. Occasional flickers of light pulse in the reflection, conveying the flickering intensity of the flames. Mood and Composition: The close-up shot emphasizes the isolation, courage, and silent determination of the liquidator. The composition is hauntingly intimate, placing the viewer face-to-face with the mask, capturing the intensity of the task and the immense, invisible danger surrounding them. Every detail contributes to a heavy, foreboding atmosphere, evoking a sense of dread and silent resilience.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Hyperrealistic panoramic view of Mako Reactor 7 in Midgar, inspired by Final Fantasy VII. A wide, elevated perspective reveals a massive industrial structure built on metal platforms, surrounded by enormous pipes, steam columns, rusted walkways, and heavy machinery. The central reactor core glows with a toxic green light from the flowing mako energy, rising as luminous mist into the dark, polluted sky. In the distance, parts of Sector 7 and the support columns of Midgar’s upper plate are visible. The atmosphere is dense with smoke, sparks, flickering red and yellow warning lights, and bursts of energy from the reactor core. Everything is coated in grime, rust, and decaying steel. Cinematic style, with cold greenish hues and dramatic artificial lighting, evoking a feeling of immense scale, oppression, and decayed industrial technology.
Amid the chaos in the ruined Chernobyl Nuclear Station, Hours after a mysterious second explosion in the core of the Chernobyl Ruins a scavenger team known as Unit Kappa-7 infiltrates the Black Zone. The guards and remaining scavengers stumble into a restricted area deep beneath the complex: the Isolation Vaults, once used to study radiation-resistant lifeforms. Now, grotesque part-human creatures roam. The explosion has awakened them—and mutated them further. They find themselves in a. battle with (The Nucleus Host: a bloated fusion of human and reactor control hardware, surrounded by floating radiation drones:1.9), and whispering in broken alien tongues. Subtle red and white highlights. The Nucleus Host is guarding the Food Creation Laboratory where bizarre ugly animals are reared for the inhabitants of the Chernobyl Ruins. Pale strobe lighting as monsters emerge from tunnels. Gunfire and firelight reflecting off slick, mutated skin. One-on-one fights in half-submerged reactor vaults.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
A close-up shot of a Chernobyl liquidator's gas mask, filling the frame with gritty, realistic detail. The mask is worn and authentic, modeled after Soviet-era designs with rounded lenses, thick rubber seals, and heavy straps, covered in ash and grime from the reactor’s fallout. The lenses are the focal point, each glass surface slightly warped and scratched, reflecting the fierce glow of distant fires within the reactor. Flames dance across the curved lenses in shades of red, orange, and intense yellow, creating a haunting, distorted view of the fiery chaos within. Lighting and Shadow Play: The overall lighting is low and moody, with harsh shadows defining the rugged texture of the mask and highlighting its worn, weathered surface. Dim light from a flickering source to the left illuminates the mask partially, casting deep shadows across the rubber surface, creating an ominous, high-contrast look. Hazy backlighting subtly outlines the mask’s contours, adding depth and a sense of foreboding. Atmospheric Details: The air is thick with smoke and radioactive dust, faintly illuminated by the fiery reflection in the lenses. Tiny, glowing particles float through the air, adding to the toxic, dangerous atmosphere. Thin wisps of smoke drift around the mask, softening the edges and giving the scene a ghostly quality. Surface Texture and Wear: The rubber of the mask is cracked and stained, showing the toll of exposure to radiation and extreme heat. Ash and small flecks of debris cling to its surface, adding realism and a gritty feel. Around the edges, faint condensation gathers on the rubber, hinting at the liquidator’s breath inside the suit. Reflection Details in the Lenses: In the mask's lenses, we see reflections of distant fires raging inside the reactor, with structures burning and twisted metal faintly visible in the intense glow. The reflections are slightly distorted, warped by the rounded glass, as if the fires themselves are bending reality. Occasional flickers of light pulse in the reflection, conveying the flickering intensity of the flames. Mood and Composition: The close-up shot emphasizes the isolation, courage, and silent determination of the liquidator. The composition is hauntingly intimate, placing the viewer face-to-face with the mask, capturing the intensity of the task and the immense, invisible danger surrounding them. Every detail contributes to a heavy, foreboding atmosphere, evoking a sense of dread and silent resilience.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Hyperrealistic panoramic view of Mako Reactor 7 in Midgar, inspired by Final Fantasy VII. A wide, elevated perspective reveals a massive industrial structure built on metal platforms, surrounded by enormous pipes, steam columns, rusted walkways, and heavy machinery. The central reactor core glows with a toxic green light from the flowing mako energy, rising as luminous mist into the dark, polluted sky. In the distance, parts of Sector 7 and the support columns of Midgar’s upper plate are visible. The atmosphere is dense with smoke, sparks, flickering red and yellow warning lights, and bursts of energy from the reactor core. Everything is coated in grime, rust, and decaying steel. Cinematic style, with cold greenish hues and dramatic artificial lighting, evoking a feeling of immense scale, oppression, and decayed industrial technology.
A lone liquidator in an abandoned reactor hall, covered head-to-toe in a cracked, soot-streaked green hazmat suit, stands amidst twisted metal and crumbling concrete, illuminated by an eerie, flickering blue-green light. His gas mask lenses are fogged and slightly cracked, with faint reflections of distant fires and glowing radioactive embers floating through the thick, toxic haze. In the background, collapsed pipes drip irradiated, glowing liquid that pools in small, sinister puddles on the floor. Wisps of smoke drift through the air, casting deep shadows over the scene, and tiny, ghostly particles float like radioactive dust around him, glowing faintly. The scene is shrouded in silence, save for the quiet hum of decaying machinery. A low-angle shot enhances the scale and isolation, with the crumbling reactor looming above, half-covered in darkness. The atmosphere is thick, gritty, and foreboding, capturing the sense of life-or-death duty in this abandoned, post-apocalyptic setting
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."
Amid the chaos in the ruined Chernobyl Nuclear Station, Hours after a mysterious second explosion in the core of the Chernobyl Ruins a scavenger team known as Unit Kappa-7 infiltrates the Black Zone. The guards and remaining scavengers stumble into a restricted area deep beneath the complex: the Isolation Vaults, once used to study radiation-resistant lifeforms. Now, grotesque part-human creatures roam. The explosion has awakened them—and mutated them further. They find themselves in a. battle with (The Nucleus Host: a bloated fusion of human and reactor control hardware, surrounded by floating radiation drones:1.9), and whispering in broken alien tongues. Subtle red and white highlights. The Nucleus Host is guarding the Food Creation Laboratory where bizarre ugly animals are reared for the inhabitants of the Chernobyl Ruins. Pale strobe lighting as monsters emerge from tunnels. Gunfire and firelight reflecting off slick, mutated skin. One-on-one fights in half-submerged reactor vaults.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
"A professional news broadcast interrupts regular programming with a bright red 'BREAKING NEWS' banner. The screen cuts to a live aerial shot of a nuclear power plant, just as a massive explosion tears through one of the reactor buildings. A blinding white flash is followed by a fireball, shockwave, and rising mushroom cloud. The camera shakes and distorts from the blast. Cut to a news anchor in the studio, visibly shaken but trying to stay composed. He says: 'We are interrupting live to bring you urgent news: a catastrophic explosion has just occurred at the Clearwater Nuclear Facility. We repeat — a nuclear reactor has exploded. The cause is currently unknown. This footage is live.' The broadcast cuts between chaotic live footage: panicked evacuations, emergency crews, distant sirens, and ash raining from the sky. On-screen graphics show a map with a growing red contamination zone. Radiation levels scroll across the bottom ticker. Cut to a field reporter in a hazmat suit near the exclusion perimeter. She yells over the noise: 'The situation here is rapidly deteriorating — the radiation is spiking, and officials are urging all residents within 30 kilometers to evacuate immediately. I can see fire crews moving in, but—' The feed glitches out briefly, then returns with static and emergency alerts. The segment ends with the anchor solemnly saying: 'This is a developing situation. Stay indoors. Do not go outside. More updates as we get them.'*
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
"A professional news broadcast interrupts regular programming with a bright red 'BREAKING NEWS' banner. The screen cuts to a live aerial shot of a nuclear power plant, just as a massive explosion tears through one of the reactor buildings. A blinding white flash is followed by a fireball, shockwave, and rising mushroom cloud. The camera shakes and distorts from the blast. Cut to a news anchor in the studio, visibly shaken but trying to stay composed. He says: 'We are interrupting live to bring you urgent news: a catastrophic explosion has just occurred at the Clearwater Nuclear Facility. We repeat — a nuclear reactor has exploded. The cause is currently unknown. This footage is live.' The broadcast cuts between chaotic live footage: panicked evacuations, emergency crews, distant sirens, and ash raining from the sky. On-screen graphics show a map with a growing red contamination zone. Radiation levels scroll across the bottom ticker. Cut to a field reporter in a hazmat suit near the exclusion perimeter. She yells over the noise: 'The situation here is rapidly deteriorating — the radiation is spiking, and officials are urging all residents within 30 kilometers to evacuate immediately. I can see fire crews moving in, but—' The feed glitches out briefly, then returns with static and emergency alerts. The segment ends with the anchor solemnly saying: 'This is a developing situation. Stay indoors. Do not go outside. More updates as we get them.'*
A close-up shot of a Chernobyl liquidator's gas mask, filling the frame with gritty, realistic detail. The mask is worn and authentic, modeled after Soviet-era designs with rounded lenses, thick rubber seals, and heavy straps, covered in ash and grime from the reactor’s fallout. The lenses are the focal point, each glass surface slightly warped and scratched, reflecting the fierce glow of distant fires within the reactor. Flames dance across the curved lenses in shades of red, orange, and intense yellow, creating a haunting, distorted view of the fiery chaos within. Lighting and Shadow Play: The overall lighting is low and moody, with harsh shadows defining the rugged texture of the mask and highlighting its worn, weathered surface. Dim light from a flickering source to the left illuminates the mask partially, casting deep shadows across the rubber surface, creating an ominous, high-contrast look. Hazy backlighting subtly outlines the mask’s contours, adding depth and a sense of foreboding. Atmospheric Details: The air is thick with smoke and radioactive dust, faintly illuminated by the fiery reflection in the lenses. Tiny, glowing particles float through the air, adding to the toxic, dangerous atmosphere. Thin wisps of smoke drift around the mask, softening the edges and giving the scene a ghostly quality. Surface Texture and Wear: The rubber of the mask is cracked and stained, showing the toll of exposure to radiation and extreme heat. Ash and small flecks of debris cling to its surface, adding realism and a gritty feel. Around the edges, faint condensation gathers on the rubber, hinting at the liquidator’s breath inside the suit. Reflection Details in the Lenses: In the mask's lenses, we see reflections of distant fires raging inside the reactor, with structures burning and twisted metal faintly visible in the intense glow. The reflections are slightly distorted, warped by the rounded glass, as if the fires themselves are bending reality. Occasional flickers of light pulse in the reflection, conveying the flickering intensity of the flames. Mood and Composition: The close-up shot emphasizes the isolation, courage, and silent determination of the liquidator. The composition is hauntingly intimate, placing the viewer face-to-face with the mask, capturing the intensity of the task and the immense, invisible danger surrounding them. Every detail contributes to a heavy, foreboding atmosphere, evoking a sense of dread and silent resilience.
A lone liquidator in an abandoned reactor hall, covered head-to-toe in a cracked, soot-streaked green hazmat suit, stands amidst twisted metal and crumbling concrete, illuminated by an eerie, flickering blue-green light. His gas mask lenses are fogged and slightly cracked, with faint reflections of distant fires and glowing radioactive embers floating through the thick, toxic haze. In the background, collapsed pipes drip irradiated, glowing liquid that pools in small, sinister puddles on the floor. Wisps of smoke drift through the air, casting deep shadows over the scene, and tiny, ghostly particles float like radioactive dust around him, glowing faintly. The scene is shrouded in silence, save for the quiet hum of decaying machinery. A low-angle shot enhances the scale and isolation, with the crumbling reactor looming above, half-covered in darkness. The atmosphere is thick, gritty, and foreboding, capturing the sense of life-or-death duty in this abandoned, post-apocalyptic setting
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."
Amid the chaos in the ruined Chernobyl Nuclear Station, Hours after a mysterious second explosion in the core of the Chernobyl Ruins a scavenger team known as Unit Kappa-7 infiltrates the Black Zone. The guards and remaining scavengers stumble into a restricted area deep beneath the complex: the Isolation Vaults, once used to study radiation-resistant lifeforms. Now, grotesque part-human creatures roam. The explosion has awakened them—and mutated them further. They find themselves in a. battle with (The Nucleus Host: a bloated fusion of human and reactor control hardware, surrounded by floating radiation drones:1.9), and whispering in broken alien tongues. Subtle red and white highlights. The Nucleus Host is guarding the Food Creation Laboratory where bizarre ugly animals are reared for the inhabitants of the Chernobyl Ruins. Pale strobe lighting as monsters emerge from tunnels. Gunfire and firelight reflecting off slick, mutated skin. One-on-one fights in half-submerged reactor vaults.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Hyperrealistic panoramic view of Mako Reactor 7 in Midgar, inspired by Final Fantasy VII. A wide, elevated perspective reveals a massive industrial structure built on metal platforms, surrounded by enormous pipes, steam columns, rusted walkways, and heavy machinery. The central reactor core glows with a toxic green light from the flowing mako energy, rising as luminous mist into the dark, polluted sky. In the distance, parts of Sector 7 and the support columns of Midgar’s upper plate are visible. The atmosphere is dense with smoke, sparks, flickering red and yellow warning lights, and bursts of energy from the reactor core. Everything is coated in grime, rust, and decaying steel. Cinematic style, with cold greenish hues and dramatic artificial lighting, evoking a feeling of immense scale, oppression, and decayed industrial technology.
A lone liquidator in an abandoned reactor hall, covered head-to-toe in a cracked, soot-streaked green hazmat suit, stands amidst twisted metal and crumbling concrete, illuminated by an eerie, flickering blue-green light. His gas mask lenses are fogged and slightly cracked, with faint reflections of distant fires and glowing radioactive embers floating through the thick, toxic haze. In the background, collapsed pipes drip irradiated, glowing liquid that pools in small, sinister puddles on the floor. Wisps of smoke drift through the air, casting deep shadows over the scene, and tiny, ghostly particles float like radioactive dust around him, glowing faintly. The scene is shrouded in silence, save for the quiet hum of decaying machinery. A low-angle shot enhances the scale and isolation, with the crumbling reactor looming above, half-covered in darkness. The atmosphere is thick, gritty, and foreboding, capturing the sense of life-or-death duty in this abandoned, post-apocalyptic setting
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Hyperrealistic panoramic view of Mako Reactor 7 in Midgar, inspired by Final Fantasy VII. A wide, elevated perspective reveals a massive industrial structure built on metal platforms, surrounded by enormous pipes, steam columns, rusted walkways, and heavy machinery. The central reactor core glows with a toxic green light from the flowing mako energy, rising as luminous mist into the dark, polluted sky. In the distance, parts of Sector 7 and the support columns of Midgar’s upper plate are visible. The atmosphere is dense with smoke, sparks, flickering red and yellow warning lights, and bursts of energy from the reactor core. Everything is coated in grime, rust, and decaying steel. Cinematic style, with cold greenish hues and dramatic artificial lighting, evoking a feeling of immense scale, oppression, and decayed industrial technology.
A close-up shot of a Chernobyl liquidator's gas mask, filling the frame with gritty, realistic detail. The mask is worn and authentic, modeled after Soviet-era designs with rounded lenses, thick rubber seals, and heavy straps, covered in ash and grime from the reactor’s fallout. The lenses are the focal point, each glass surface slightly warped and scratched, reflecting the fierce glow of distant fires within the reactor. Flames dance across the curved lenses in shades of red, orange, and intense yellow, creating a haunting, distorted view of the fiery chaos within. Lighting and Shadow Play: The overall lighting is low and moody, with harsh shadows defining the rugged texture of the mask and highlighting its worn, weathered surface. Dim light from a flickering source to the left illuminates the mask partially, casting deep shadows across the rubber surface, creating an ominous, high-contrast look. Hazy backlighting subtly outlines the mask’s contours, adding depth and a sense of foreboding. Atmospheric Details: The air is thick with smoke and radioactive dust, faintly illuminated by the fiery reflection in the lenses. Tiny, glowing particles float through the air, adding to the toxic, dangerous atmosphere. Thin wisps of smoke drift around the mask, softening the edges and giving the scene a ghostly quality. Surface Texture and Wear: The rubber of the mask is cracked and stained, showing the toll of exposure to radiation and extreme heat. Ash and small flecks of debris cling to its surface, adding realism and a gritty feel. Around the edges, faint condensation gathers on the rubber, hinting at the liquidator’s breath inside the suit. Reflection Details in the Lenses: In the mask's lenses, we see reflections of distant fires raging inside the reactor, with structures burning and twisted metal faintly visible in the intense glow. The reflections are slightly distorted, warped by the rounded glass, as if the fires themselves are bending reality. Occasional flickers of light pulse in the reflection, conveying the flickering intensity of the flames. Mood and Composition: The close-up shot emphasizes the isolation, courage, and silent determination of the liquidator. The composition is hauntingly intimate, placing the viewer face-to-face with the mask, capturing the intensity of the task and the immense, invisible danger surrounding them. Every detail contributes to a heavy, foreboding atmosphere, evoking a sense of dread and silent resilience.
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."
"A professional news broadcast interrupts regular programming with a bright red 'BREAKING NEWS' banner. The screen cuts to a live aerial shot of a nuclear power plant, just as a massive explosion tears through one of the reactor buildings. A blinding white flash is followed by a fireball, shockwave, and rising mushroom cloud. The camera shakes and distorts from the blast. Cut to a news anchor in the studio, visibly shaken but trying to stay composed. He says: 'We are interrupting live to bring you urgent news: a catastrophic explosion has just occurred at the Clearwater Nuclear Facility. We repeat — a nuclear reactor has exploded. The cause is currently unknown. This footage is live.' The broadcast cuts between chaotic live footage: panicked evacuations, emergency crews, distant sirens, and ash raining from the sky. On-screen graphics show a map with a growing red contamination zone. Radiation levels scroll across the bottom ticker. Cut to a field reporter in a hazmat suit near the exclusion perimeter. She yells over the noise: 'The situation here is rapidly deteriorating — the radiation is spiking, and officials are urging all residents within 30 kilometers to evacuate immediately. I can see fire crews moving in, but—' The feed glitches out briefly, then returns with static and emergency alerts. The segment ends with the anchor solemnly saying: 'This is a developing situation. Stay indoors. Do not go outside. More updates as we get them.'*
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Amid the chaos in the ruined Chernobyl Nuclear Station, Hours after a mysterious second explosion in the core of the Chernobyl Ruins a scavenger team known as Unit Kappa-7 infiltrates the Black Zone. The guards and remaining scavengers stumble into a restricted area deep beneath the complex: the Isolation Vaults, once used to study radiation-resistant lifeforms. Now, grotesque part-human creatures roam. The explosion has awakened them—and mutated them further. They find themselves in a. battle with (The Nucleus Host: a bloated fusion of human and reactor control hardware, surrounded by floating radiation drones:1.9), and whispering in broken alien tongues. Subtle red and white highlights. The Nucleus Host is guarding the Food Creation Laboratory where bizarre ugly animals are reared for the inhabitants of the Chernobyl Ruins. Pale strobe lighting as monsters emerge from tunnels. Gunfire and firelight reflecting off slick, mutated skin. One-on-one fights in half-submerged reactor vaults.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
Specialized Bitumen Refining Plant Governorate: Anbar / Hit District Production Capacity: ( ) Tons/Day The city of Hit in the Anbar Governorate is considered one of the most famous areas in the world for its natural "bitumen springs," which have been used for thousands of years (dating back to the Babylonian and Assyrian eras). However, processing this bitumen for modern use requires technical steps to transform it from a raw material into a viable product for construction or industrial applications. Bitumen emerges from these springs as a highly viscous liquid mixed with sulfurous water, salts, and mud impurities. This "Natural Asphalt" differs from petroleum bitumen produced in refineries, and it can also appear in the form of rocky or spongy blocks mixed with mud. To obtain industrially usable products from this bitumen, specifically for: 1. Waterproofing (Felt/Membranes): Considered one of the best coating materials for building foundations to prevent moisture leakage due to its high resistance to hydrolysis. 2. Road Paving: Mixed with gravel and sand to produce asphalt concrete. It is characterized by exceptionally high cohesive strength compared to industrial bitumen. The natural bitumen from these springs must undergo several fundamental processing stages to become industrially viable: 1. Collection and Sedimentation: Bitumen is collected from the springs or quarry sites and left in designated basins to allow the sulfurous water to naturally separate (due to density differences). 2. Primary Heating: The raw bitumen is placed in large boilers to: a. Evaporate the remaining water. b. Reduce viscosity for easier handling. 3. Filtration and Purification: The heated bitumen is screened to remove solid impurities such as gravel, dirt, and suspended organic matter. 4. Secondary Heating and Cooking: The temperature of the bitumen is raised, improving agents are added, and it is prepared for the vacuum distillation process. 5. Vacuum Distillation: The distillation process is conducted under low pressure (vacuum pressure), which allows for: a. The separation of light oils and volatile substances at lower temperatures. b. The production of highly pure "Hard Asphalt," which is highly demanded in the construction industry. ________________________________________ Plant Components and Operational Stages The specialized bitumen plant for processing raw natural bitumen (in both liquid and solid states) consists of a range of specialized equipment designed according to the latest international standards. This equipment aligns with the technical and engineering requirements for bitumen products, complies with Iraqi standard specifications, and adheres to environmental considerations in the Anbar Governorate. 1. Extraction Stage The raw material (solid or liquid) is extracted from quarries designated by the Geological Survey Authority using specialized mechanical equipment. It is stored in stocks or special basins for solid materials, then transported to the refinery site using specialized transport vehicles of various capacities. 2. Storage Stage The raw materials are stored in designated yards to ensure a sufficient inventory for continuous, uninterrupted production for no less than 7 working days. 3. Raw Material Preparation and Primary Heating Stage Raw materials are fed into the plant via hydraulic lifts. This stage includes: • 3-1: Crushing and Digestion: Solid raw materials from the quarries are broken down and digested using a digester (SH-01) equipped with double blades driven by hydraulic motors (22.5 kW capacity). The digester is 5 meters long and 1.80 meters in diameter, made of carbon steel, with Stainless Steel 304 blades. It includes a Stainless Steel piston driven by a 7.5 kW electric motor. • 3-2: Primary Heating: This melts the bitumen and improves pumpability through pipes and pumps. • 3-3: Efficiency Enhancement: To increase melting efficiency, Gas Oil is added to the primary heating basin at a ratio of 1:5 per ton of solid raw material entering the basin (this ratio decreases when using liquid raw bitumen). o 3-2-1: Primary Melting Basin (TK-01): Raw material is heated in a concrete tank (25m L x 5m W x 3m H) with a maximum storage capacity of 300 tons. Heating pipes circulate thermal fluid (oil) at 125°C, with a retention time of 4-6 hours. The tank is internally lined with 6-8 mm carbon steel plates to protect the heating pipes from corrosion. It contains 8 Stainless Steel 304 mixers (MX-01 A/B/C/D/E/F) driven by 7.5 kW electric motors (50 RPM) and gearboxes (1:60 ratio) to mix the material, increase heating efficiency, reduce retention time, and circulate the melted bitumen to eliminate dissolved water, resulting in a homogeneous melt. Covered with a carbon steel roof with service hatches, it connects to an air duct (30x60 cm) linked to 2 air blowers (AB-01A/B) (one operating, one standby) at 22.5 kW / 1500 RPM. These extract water vapor and sulfur fumes, sending them to a scrubber before atmospheric release and water recycling. o 3-2-2: Primary Collection Tank (V-01): A carbon steel tank (12-14 mm thick) with a maximum capacity of 125 tons (10m L x 5m W x 3m H). It connects directly to the primary tank (TK-01) via channels and movable gates to receive only liquid raw material. It contains thermal oil pipes to maintain the liquid raw material at 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum outer cover. Impurities larger than 35 mm are removed and collected in a waste tank. o 3-2-3: Screw Conveyors (SC-01 A/B): Carbon steel screw conveyors with a double-jacketed outer cover filled with thermal oil to maintain the 140°C temperature. Driven by 22.5 kW electric motors (3000 RPM) with 1:40 gearboxes, they transport the liquid raw material to the preliminary filtration unit. 4. Purification Unit Removes suspended impurities from the liquid raw material in two stages: • 4-1: Preliminary Purification Tank (V-02): A carbon steel tank (12-14 mm thick, 125-ton capacity, 5m L x 10m W x 3m H). Receives liquid raw material from the primary collection tank. Contains thermal oil pipes to maintain 140°C. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Impurities larger than 15 mm are removed to a waste tank. Material is pumped to the final filtration stage via gear pumps (GP-01 A/B) (one operating, one standby) at 22.5 kW / 1000 RPM. • 4-2: Final Filtration Unit (FT-01): Removes remaining impurities by passing liquids through box filters arranged in 2 trains (8 per train). They feature a two-layer Stainless Steel filter mesh (specified microns) wrapped around square boxes. Liquid enters from the outside, and pure liquid is collected from the inside via a pipe network connected to a manifold. This is driven by two vacuum pumps (VP-01A/B) connected to the raw material tanks. 5. Raw Material Tanks (V-03 A-J) Ten carbon steel tanks (2.5m diameter, 9m length, 14 mm thickness, 45-ton max capacity) equipped with thermal oil heating coils. They receive, store, and prepare the purified raw material for the subsequent cooking reaction. Insulated with glass wool (90 kg/m³) and a 1.8 mm aluminum cover. Connected by a pipe/valve network, the material is pumped via two centrifugal pumps (P-01 A/B) at 22.5 kW / 3000 RPM to the reactor unit. The tanks connect to a pipe network driven by vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM, pushing heating gases and vapors to the gas washing tank (V-14). 6. Reactor (Cooking) Unit (V-04 A/B) Consists of three reactors (55 tons each) that prepare the raw material for vacuum distillation and extract light naphtha compounds. • 6-1: Cooking Process: o 6-1-1: Catalyst System: Consists of two tanks. One prepares the catalyst mixture (1.5m dia, 4m H, 8mm carbon steel) with a mixer (MX-03) driven by a hydromotor and 1:40 gearbox. The second stores Gas Oil added to the preparation unit (1.5m dia, 1m H, 5mm carbon steel) with a 0.5 HP centrifugal pump. o 6-1-2: Reaction Tanks (V-04/05/06A): Three carbon steel tanks (2.8m dia, 9m L, 14mm thick, 55-ton max). Each has 2 Stainless Steel mixers (MX-02 A/B/C/D/E/F) driven by a 7.5 kW motor (1500 RPM) with a 1:40 gearbox. Contains an internal heating system powered by a Gas Oil burner to raise the temperature to 180°C. Catalyst is injected via dosing pumps (DP-01A/B) to increase naphtha extraction efficiency. Material is circulated during cooking by two centrifugal pumps per reactor (P-04A/B/C/D/E/F) (one active, one standby) to reduce retention time to 3-4 hours. After cooking, material is moved to the attached tank (V-04/05/06B) for storage before distillation. Fully insulated. o 6-1-3: Cooked Material Tank (V-04/05/06B): Carbon steel tank (2.8m dia, 9m L, 14mm thick) with thermal oil pipes to maintain 190-200°C. Fully insulated. Material is pumped to the vacuum distillation tower via centrifugal pumps (P-05A/B) (one active, one standby) at 22.5 kW / 3000 RPM. 7. Raw Naphtha Storage Unit Collects and condenses naphtha extracted during cooking. • 7-1-1: Raw Naphtha Tanks (V-07A/B/C): Three vertical Stainless Steel 304 tanks (1.5m dia, 5m H) connected to three heat exchangers and two pump pairs. Equipped internally with water spray nozzles on a ring pipe to wash non-condensable gases. • 7-1-2: Heat Exchangers (HE-01A/B/C): Condense naphtha vapors from 140°C down to 40°C using water from the cooling tower. Connected in series. Shell & Tube type, carbon steel (510 mm dia, 6m L) with 70 tubes (0.75-inch dia) in two rows of 35. Includes internal baffles for efficiency. • 7-1-3: Supporting Pumps: Vacuum pumps (VP-01A/B) at 22.5 kW / 1500 RPM draw naphtha vapors from reactors to the heat exchangers, pushing non-condensable gases to the scrubber (V-14). Centrifugal pumps (P-02A/B) at 11.5 kW / 1500 RPM transport liquid raw naphtha to the Bleaching Unit. 8. Vacuum Distillation Unit The core of the plant, separating remaining light compounds and producing hard asphalt. • 8-1-1: Vacuum Distillation Tower: A vertical tower (~16m total height, 14mm carbon steel). Bottom section (Reboiler) is 3.5m dia x 1.2m H; top section is 1.5m dia x 12m H. Fully insulated. Fed with cooked material at 190-200°C via pumps (P-05A/B). To start extraction (remaining naphtha, Gas Oil, diesel), temperature is raised to 240-250°C using Heating Coil 1 via pumps (P-08A/B) at 55 kW / 3000 RPM, with continuous circulation via pumps (P-07A/B). Vacuum pumps (VP-03A/B) maintain 0.3-0.5 mbar pressure. Light compounds are extracted, condensed (HE-02A/B/C), and stored (V-08/09/10 A/B) over 2.5-3 hours. Afterward, material is heated via Heating Coil 2 to 320-340°C to finalize extraction and produce hard bitumen. Product is extracted via pumps (P-07A/B) at ~320°C, cooled via cooling tower coils, and sent to final tanks (V-18A/B/C). Batch processing takes 6-7 hours daily; continuous operation is possible. • 8-1-2: Supporting Pumps: Vacuum pumps (VP-03A/B) at 5.5 kW / 3000 RPM draw light vapors for condensation. Circulation centrifugal pumps (P-08A/B) at 55 kW move hot material to heating coils; (P-07A/B) circulate material and pump final bitumen product. • 8-1-3: Heating Coils 1 & 2: Carbon steel 4-inch diameter coils heated externally by a Gas Oil burner. Connected in series to heat liquid bitumen in two stages to prevent degradation. • 8-2: Heat Exchangers (HE-02A/B/C): Condense light compound vapors from 240°C to 40°C. Shell & Tube type, carbon steel (600 mm dia, 6m L) with 80 tubes (1-inch dia) in two rows of 40, equipped with baffles. • 8-3: Light Compound Tanks (V-08A/B, V-09A/B, V-10A/B): Six horizontal carbon steel tanks (1.5m dia, 4.5m L, 14mm thick). Receive condensates, linked to heat exchangers and vacuum pumps. Liquids are pumped to the Bleaching Unit via centrifugal pumps (P-06A/B) at 7.5 kW / 1500 RPM. 9. Bleaching Unit Improves the specifications of raw light compounds for local use and marketing. • 9-1: Collection Tank (V-11): Horizontal carbon steel tank (1m dia, 2.5m L, 14mm thick) placed above the system to store and distribute light compounds to the bleaching columns. • 9-2: Bleaching Columns (V-12A/B/C): Three vertical carbon steel vessels (1m dia, 4.5m H, 14mm thick). Contain a 15 cm catalyst layer on trays to bleach raw liquids into high-quality compounds, collected in a bottom horizontal tank. The catalyst is a calcined mixture of Bentonite and Zinc Oxide granules (2-3 mm) homogenized in water, which can be reactivated with steam and 5% HCl. • 9-3: Supporting Pumps: Vacuum pumps (VP-04A/B) at 5.5 kW extract vapors to the scrubber. Centrifugal pumps (P-09A/B) at 7.5 kW push bleached liquids to final tanks. 10. Production Tanks (V-13 A-F & V-18 A-C) • Light Products: Six horizontal carbon steel tanks (2.8m dia, 9m L, 55-ton capacity). V-13A/B for light naphtha, V-13C/D for Gas Oil, V-13E/F for diesel. • Asphalt: Three vertical carbon steel tanks (V-18A/B/C) (5m dia, 9m H). Equipped with thermal oil heating coils to keep asphalt liquid. Fully insulated (90 kg/m³ glass wool, 1.8mm aluminum cover). 11. Supporting Systems • 11-1: Gas Washing (Scrubber) System: Treats non-condensable gases before atmospheric release. Contains V-14 washing tank (1m dia, 2.8m L), a 500mm Flare stack with 3 ignitors, and a 1m x 1m LPG tank (V-15) for ignition. • 11-2: Cooling Tower: Provides cooling water for heat exchangers. Galvanized pressed steel basin (16m L x 2.4m W x 2.8m H), FRP casing, top fans, water distributors, and fill media. Includes Accumulator tank V-20 (1.5m dia, 2m L) and 11 kW pushing pumps (P-14A/B). • 11-3: Thermal Oil Boilers: Includes oil tank, heating boiler, oil pumps, and heating accelerators. • 11-4: Distillation Tower Raw Boilers • 11-5: Power Generation System • 11-6: Production Laboratory • 11-7: Control and Operation Room • 11-8: Catalyst System: Contains a vertical diesel tank (1m dia, 1.5m H) with a 1 kW centrifugal pump (P-11). Two vertical carbon steel tanks (V-17A/B, 1.5m dia, 4.5m H) with an MX-03 hydromotor mixer (7.5 kW, 30 RPM). V-17A is for preparation, V-17B pumps catalyst to the reactor. ________________________________________ Catalyst Chemical Components & Formulations 1. Alumina (Al2O3): Enhances the cracking of chemical bonds in heavy bitumen chains and increases Gas Oil extraction yield. 2. Manganese Dioxide (MnO2): Accelerates the reaction, reduces reaction time, and acts as a gasoline improver. 3. Silicon Dioxide (SiO2): Increases acceleration and reduces reaction time. 4. Iron Oxides (Fe2O): Accelerates the reaction, prevents pipe corrosion, and stops sulfur and wax from sticking to pipes and pumps. Weight Ratios (WT/WT) to Produce One Barrel (200 Liters) of Catalyst: 1. Alumina: Varies by feed: 2-2.5% for Bitumen / 4-5% for Vacuum Residue (VR) / 2-2.5% for Heavy Fuel Oil (HFO). To increase Gas Oil/Diesel (Light fuel) yield, Alumina can be added up to a maximum of 10%. 2. Manganese Dioxide: 2-2.5% for HFO / 4-5% for VR and Bitumen. 3. Iron Oxides: 2-2.5% across all feeds. 4. Silicon Dioxide: 2-2.5% for HFO / 4-5% for Bitumen and VR. 5. Remaining Volume: Filled with C-oil. Note: One barrel (200 Liters) of this mixture is added for every 5 tons of HFO, VR, or Bitumen. Manufacturing Mechanism: All components are placed in a tank, initially mixed with water, and heated to 80-120°C with continuous mixing (20-30 RPM). Once foam is generated, the product is allowed to cool to 80°C. The heating process up to 120°C is repeated 3 or 4 times until foaming ceases. Finally, the temperature is raised to 150°C, and the mixture is topped off to 200 liters using C-oil. To further improve light compound specifications, Zinc Oxide (300 grams) is mixed with 20 kg of Bentonite in C-oil. This is added alongside the catalyst at a ratio of 1/5 barrel of catalyst added to the reactor.
a woman that is standing in the dark, tron angel, trending on cgisociety, enchantress, inspired by Elina Karimova, laces, it glows from the outside, photo of a beautiful, lumi "4K, anime-semi-realistic full-body illustration of a female Reploid warrior, merging Cybertronian and Power Ranger-inspired sci-fi aesthetics with a Tron-style Hyrulian dress and lace swimsuit armor. The armor is sleek, form-fitting, and adorned with neon-vibrant colors, predominantly white with bold accents of red, blue, and dark gold, detailed with intricate, modular plating that balances elegance and combat-readiness. A glowing, heart-shaped reactor embedded at the chest radiates energy, symbolizing her life force. She wears a cybernetic Halo-Gundam helmet with a transparent visor revealing her strikingly beautiful face, framed by long, flowing hair in vivid red and silver. Her bioluminescent tattoos of bio-ink shimmer across her alabaster skin, and fiery, lightning-like red-yellow runic tattoos flow along her body. Set against a mosaic-inspired, moonlit ruins backdrop, glowing streaks of fire form her skin, casting shimmering beams of light. The ethereal atmosphere is enhanced by intricate, feathery textures and delicate, curled lines in pastel tones and golden highlights. Warm, dark gold and crimson hues envelop her figure, blending with fantastical sci-fi and fantasy-mecha elements. Her pose exudes confidence, blending elegance and battle-readiness, with volumetric lighting, subtle glow, and iridescent details evoking a sense of divine mysticism. Inspired by Artgerm, Yoji Shinkawa, Akihiko Yoshida, Mark Brooks, and Zenescope styles, the artwork features rich textures, soft focus, and ultra-high resolution (8K), with a surreal yet breathtaking realism, perfect for concept art or fantasy splash screens. "A semi-realistic, cyberpunk-inspired anime illustration featuring a beautiful, alluring woman named Yui, standing confidently in the middle of a futuristic, neon-lit city at night. Her attire reflects both sophistication and a cosmic elegance: a fitted midnight-blue dress with subtle sparkles that resemble stars, reminiscent of the night sky. The dress is sleek and form-fitting with a plunging neckline and angular, criss-cross straps over her chest, adding a modern, high-tech touch. The skirt flares slightly at the hem, introducing a sense of movement and grace. Her short, wavy black-red hair has a metallic sheen that reflects the ambient neon lights of the city, emphasizing the cyberpunk aesthetic. Yui’s amethyst-colored eyes convey a sense of mystery and strength, while a miniature heart-shaped power reactor glows subtly in her chest, radiating a soft energy throughout her figure. She stands surrounded by ethereal orbs and cosmic energy, her pose graceful and poised, like an anime key visual. The scene is set against vibrant hues of pink, blue, and purple, with neon signs casting a warm glow, enhancing her figure and the nightclub-like ambiance. Inspired by artists like Ilya Kuvshinov, Artgerm, and Charlie Bowater, this artwork combines semi-realism and anime aesthetics, capturing a mix of elegance, allure, and futuristic style."